STATEMENT OF WORK: Monaco Fire Alarm Systems Service Contract

This Statement of Work (SOW) outlines preventative maintenance and repair services for Monaco fire alarm workstations at Youngstown Air Reserve Station in Vienna, Ohio. The contractor must provide all personnel, tools, supervision, and normal wear-and-tear parts (excluding major electronic component failures) necessary to maintain and repair Monaco equipment in accordance with manufacturer specifications. Service technicians must possess experience with Monaco workstations and be trained and authorized by the manufacturer's designated service agency to perform maintenance, repairs, factory modifications, and warranty work. The contractor is available 24 hours per day, 7 days per week, except on nine federal holidays. All replacement parts must be new factory-warranted units unless the Fire Department approves use of rebuilt parts. The contractor must maintain a detailed maintenance repair log for each piece of equipment, including manufacturer, model, serial number, work date, description, and parts installed, with updated logs provided to the Fire Department by the second Monday of each month.

The contract requires scheduled preventative maintenance with two annual visits to ensure all Monaco Alarm System and phone equipment comply with manufacturer specifications. Service calls must be addressed within one business day of notification. Specific tasks include comprehensive system checks such as cleaning and verifying D-21 PC operations, printer service, software updates with STIG compliance verification, database backups, monitor inspection, network connectivity verification, UPS system testing, RFM firmware updates, mobile drive tests, DVR and network video monitoring inspection, map updates (if GIS files are provided within 30 days of award), and system performance validation. The contractor must provide up to four hours of D-21 operator training and maintain redundant database synchronization. All work must meet commercial quality control standards. The contractor guarantees one year of workmanship from completion, with all new equipment including a one-year limited warranty covering defects within 12 months of delivery or 14 months from shipment, whichever is earlier. Additional work beyond the SOW scope requires a valid change notice or contract modification and will be billed at the contractor's standard rates. The Fire Department point of contact is (330) 609-1295.

View the file

Other files

File Type Posted
Monaco PMI Single Source Justification CO sign.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK {SOW)

Monaco Fire Alarm Systems Service Contract

Youngstown Air Reserve Station, Vienna, OH

1.SCOPE: The contractor shall provide all personnel, tools, supervision and except for major electronic part failures, all normal wear and tear parts and other items necessary to perform preventative maintenance and onsite repairs to Monaco workstations at Youngstown Air Reserve Station in Vienna Ohio as defined in this Statement of Work. All scheduled maintenance shall be performed in accordance with the manufacturer's specifications. Contractor will provide service checks/maintenance to adjust, upgrade, repair and accomplish manufacturer's recommended maintenance of equipment listed on the Monaco Alarm System.

2.LOCATION: This work is to be accomplished at Youngstown Air Reserve Station, Vienna OH.

3.PERSONNEL/QUALIFICATIONS: All service technicians must possess experience on the repair and maintenance of the Monaco workstations already in place at Youngstown Air Reserve Station, Vienna, OH. The contractor must be trained by the manufacturer's designated service agency and authorized to perform maintenance, repairs, factory modifications and warranty work for all equipment.

4.WORKMANSHIP/QUALITY CONTROL: The contractor shall provide all Quality Control in accordance with commercial practices to ensure that all work is performed in accordance with this Statement of Work and manufacturer's specifications.

5.HOURS OF OPERATION: The contractor shall be available to work on equipment 24 hours a day, 7 days a week, except for Federal holidays.

a. New Year’s Day - 1 January

b. Martin Luther King Day - 3rd Monday in January

c. Washington’s Birthday - 3rd Monday in February

d. Memorial Day - last Monday in May

e. Juneteenth National Independence Day – 19 June

f. Independence Day - 4 July

g. Labor Day - 1st Monday in September

h. Columbus Day - 2nd Monday in October

i. Veteran’s Day - 11 November

j. Thanksgiving Day - 4th Thursday in November

k. Christmas Day - 25 December

6.CONTRACTOR-FURNISHED SUPPLIES AND SERVICES:

6.1 Replacement Parts: The contractor shall provide all parts that are covered by warranty. All replacement parts shall be new factory warranted parts unless the Fire Department or designated representative gives prior approval for use of any rebuilt parts.

6.2 Maintenance Repair Log: The contractor shall maintain a detailed log of all service performed on each individual piece of equipment covered under the contract. The log must include the following information: manufacturer, model number, serial number, date work performed, description of work performed and parts installed. A copy of the updated log must be provided to the Fire Department or designated representative no later than the 2nd Monday of the month for the work performed during the previous month.

7. SPECIFIC TASKS:

7.1 The contractor shall provide scheduled preventative maintenance to ensure all equipment listed on the Monaco Alarm System, and phone equipment is maintained in accordance with this Statement of Work (SOW) and manufacturer specifications with two visits annually. Will provide completed reports after completion of trip.

7.2 Service Calls: The Fire Department will notify the contractor when a service call is required and specify the equipment that is not working properly that requires work.

7.3 The contractor shall respond to the service calls within one (1) business days of notification from the Fire Department.

7.4 Provide any recommendations for upgrades/changes to the D-21 System.

7.5 Clean and verify operation of the internal and exterior components of the D-21 PCs. Ensure all cards are seated and operating properly. Check operational status of internal fans. Clean filters as applicable. Check and re-seat cables and connectors as necessary. Defragment the hard drive and clean the hard drive carrier.

7.6 Perform printer service to include the following: check ink/toner level, ensure correct drivers are installed on each D-21/EM computer. Print test pages from each D-21/EM desktop computer.

7.7 Update the D-21 software to the most current site applicable version as determined by contractor. Perform antivirus definition updates. Update RMF ready software settings to meet new STIG’s: Requires existing RMF Ready software. RMF Ready software updates can only be provided on Windows 10 or higher CPUs. If there are any STIGs that are not met, contractor will assist in justification of the requirements.

7.8 Create a complete database backup, archive database (if determined to be necessary by on-site technician) to improve system performance, and provide backup to the Base on removable media.

7.9 Clean and visually inspect all D-21 monitors, adjusting any settings as necessary; tighten cables/connectors and label if necessary.

7.10 Conduct extended system-wide poll from each RFM (primary and alternates), test the system’s performance and assist in the correction of any deficiencies in the database.

7.11 Check rack mounted UPS systems: If digital readout exists, note current load and battery charge percentages; perform either a self-test if applicable to the UPS model or a 15-minute load test and record results. If no digital readout exists, perform a 15-minute load test and record results.

7.12 For all UPS systems, verify that only Fire Reporting systems are connected and report any issues to the Fire Department.

7.13 Verify network connectivity between all D-21 network computers and devices.

7.14 Verify and test Monaco support connection to allow for continued 24-hour support from the Monaco D-21 help desk.

7.15 Ensure redundant D-21 database is synchronized with the primary D-21 database.

7.16 Perform redundant server takeover test.

7.17 Update media files if new files are available.

7.18 Check condition of all D-21 rack equipment if installed, ensure all connections are secure and all computers and units are operating as intended; note oƯ-normal units on customer report.

7.19 Provide a copy of the D-21 software installation disk for archive purposes.

7.20 Provide electronic copies of new D-21 manuals if available.

7.21 Visually inspect and functionally test Tone Panels, GPIOs, Network Video Monitoring, Mobile Base Stations, and Remote Station Alerting equipment (if installed); clean equipment if accessible at ground level.

7.22 Clean the RFM(s), verify redundant RFM operation if in service.

7.23 Visually inspect the antenna network from ground level and measure and record forward and reflected power on each RFM-X, RFM-7000, and each RFM Repeater (accessibility must be provided by the site). Visually inspect the weather station from ground level and verify connectivity.

7.24 Update the RFM firmware to the most current site applicable version if necessary.

7.25 For Radio network connected mobiles, perform a drive test in at least one Mobile Client equipped vehicle to verify mobile connectivity to each Mobile Base Station.

7.26 Inspect Monaco provided DVR equipment (if installed) and ensure lines are recording normally.

7.27 Inspect Monaco network video monitoring (NVM) systems and provide status reports for any non-functioning cameras (if installed).

7.28 Update D-21 Hazmat and Technical manuals, if available.

7.29 Update the D-21 Map, if updates to the existing ESRI map files are provided within 30 days of PO/Contract award. Map refreshes and updates include the incorporation of new or updated GIS layers provided to contractor for integration into the D-21 Map.

7.30 Validate the system performance after installation.

7.31 Provide up to four (4) hours of D-21 operator training after system initialization while the installation technician is on-site.

7.32 Any additional time or scope will be at additional cost and billed per contractor’s standard rates, and will require a valid, executed change notice or contract modification before proceeding with the additional work.

8 POINTS OF CONTACT: The Fire Department, or designated representative, can be contacted at

(330) 609-1295.

9 TRAINING: The NCOIC of Dispatch and Alarm Shop shall receive up to 4 hours of training on any updated software or hardware changes. Proper user training on Monaco’s equipment is essential to ensure the system operates at its optimal level. Provide training on the installed systems by a Monaco-certified system expert. The Operator and Administrator training instructs users how to navigate the system’s user interface, provides instruction on interpreting the display information, and shows the user how to respond to any alarms or alert conditions.

10 PERSONNEL: The contractor shall ensure all employees working at Youngstown Air Reserve Station possess proper identification and/or citizenship documentation.

11 CLEANUP: The contractor is responsible for returning all work sites to the condition in which they were found.

12 WARRANTY: The contractor will guarantee all workmanship for a period of one year from completion of work. All new equipment provided by contractor shall include a one-year limited warranty. Under this warranty contractor will repair or replace any defect of material or workmanship of equipment manufactured within 12 months from the date of delivery but no more than 14 months after the date of shipment, whichever is earlier.