Statement of Work Grove Crane - Attachment 1.pdf
PDF 138 KB Posted
- Attached to
- Grove Crane Repair
- Solicitation number
- FA441725Q0118
About this file
This Statement of Work (SOW) details the repair requirements for a 2009 Grove 50T Crane (TMS700E model, VIN 476S700E59S229552) for the 823d RED HORSE Squadron at Hurlburt Field. The contractor must perform comprehensive repairs within a 300-mile radius of Hurlburt Field, including addressing multiple mechanical and operational issues such as software updates, hydraulic and transmission fluid leaks, turn signal repairs, pump replacements, boom inspection, and A/C repair.
Key contract specifications require the contractor to use only original equipment manufacturer (OEM) approved parts, follow Grove specifications and OSHA regulations, and provide written documentation of completed repairs and warranties. The 823d RED HORSE Squadron will transport the crane to the repair facility, and upon repair completion, the contractor must coordinate vehicle inspection and return with the squadron's Vehicle Management team. The contractor is also responsible for ensuring no government-owned property is damaged during service, with full liability for any potential damage or replacement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
REPAIR OF 2009 Grove 50T Crane
1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, equipment, supplies, technical data, and labor necessary to test, tear down, quote (TD&Q), and complete required and authorized repairs on one (1) TMS700E model Grove 50T crane, Vehicle Identification Number (VIN) 476S700E59S229552. All work shall be accomplished at the contractor’s repair facility. Transportation to and from the repair facility will be performed by the 823 RED HORSE Squadron. The contractor’s repair facility must be within A 300-mile radius of Hurlburt Field. All work shall be IAW (in accordance with) Grove specifications and all OSHA regulations. The contractor shall accomplish all tasks to meet the requirements of the Statement of Work (SOW).
1.1. The contractor shall perform the following actions or repair the listed parts:
- Perform any and all applicable software updates
- PTO (power take-off) mainline leak
- Repair/replace Output shaft flange gasket
- HYD (hydraulic) leak on swivel manifold
- Transmission fluid change
- Rear differential input shaft leak
- Repair/replace all inoperable turn signals
- Lift cycle seal
- Bell housing Plug
- Rebuild the swing valve
- Repair/replace hydraulic pump
- HYD hoses bulging
- Repair/replace rear differential gasket
- Boom inspection and lube
- Repair/replace drag link bushings
- Repair A/C (air conditioning)
- Perform proper clutch brake adjustments
- Perform an inspection to ensure no other repairs are required. If there are, the Contractor will provide a detailed report and quote.
1.1.2. The contractor shall provide and install only OEM (original equipment manufacturer) approved parts. Additionally, the contractor shall repair the unit IAW the manufacturer’s technical specifications.
1.1.3. The contractor shall, in strict accordance with the manufacturer’s technical data and approved procedures, perform an operator’s check after the repair is complete to determine if the unit is functioning IAW manufacturer’s specifications.
2. Deliverables.
2.1. Parts and Repair Documentation. The contractor shall provide to the customer written documentation identifying all repairs completed and any applicable warranties provided.
2.2. The 823d RED HORSE Squadron will deliver one (1) TMS700E model Grove 50T crane, Vehicle Identification Number (VIN) 476S700E59S229552 to the repair facility.
2.3. Upon acceptance of the repairs, the contractor will contact 823d RED HORSE Squadron Vehicle Management to coordinate the inspection of repairs and pick up the vehicle from the repair facility.
GENERAL INFORMATION
3.1. Physical Security. The contractor shall ensure no government-owned or controlled real or personal property is damaged during any service provided under the contract. The contractor will be responsible for the repair or replacement of any government property damaged by the contractor at no expense to the government.
| STATEMENT OF WORK FOR |
| 2. Deliverables. |
| GENERAL INFORMATION |
File details come from the government source that posted it. Updated .