Statement of Work.pdf
PDF 95 KB Posted
- Solicitation number
- 36C24921R0124
About this file
This statement of work outlines an upgrade project for elevators P4, P5, S6, and S7 at a Veterans Affairs medical center. The project includes selective demolition of existing components and systems, as well as general construction and installation of new architectural, fire protection, mechanical, and electrical systems to modernize the elevators. Item I of the bid covers all general construction work. The performance period is 400 calendar days. A related federal contract opportunity on the Federal Business Opportunities website solicits bids for the 596A4-18-103 project to upgrade the elevators through the Department of Veterans Affairs Veterans Health Administration VISN 9.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24921R0124 0002.docx | DOCX document | |
| Pit Ladder Detail.pdf | ||
| Attestation Guidance for Health and Safety Precautions for COVID-19.pdf | ||
| Solicitation RFIs_596A4-18-103.pdf | ||
| Current COVID-19 Workplace Safety Requirements.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| 36C24921R0124 0001.docx | DOCX document | |
| Wage Determination KY20210090 3-5-2021.pdf | ||
| P12 Project Drawings.pdf | ||
| Past Performance Questionnaire.pdf | ||
| P12 Project Drawings (1).pdf | ||
| P12 Project Specifications.pdf | ||
| Copy of eCMS Line Item Template - updated version 1.1.xlsx | XLSX spreadsheet | |
| 36C24921R0124_1.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Project: 596A4-18-103 Upgrade Elevators P4, P5, S6, & S7- TBC
GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing components ,assemblies, structures, and furnish labor and materials and perform work for Project 596A4-18-103 Upgrade
Elevators P4, P5, S6, & S7 -TBC as required by drawings and specifications.
B. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: Work includes selective demolition, general construction, alterations, electrical , fire protection, and lighting.
Work includes all labor, material, equipment, and supervision to perform the required upgrades and construction work on this project including architectural modifications, fire protection systems, mechanical systems, and electrical systems as described in bid documents to upgrade P4, P5, S6, and S7 elevators.
B. Period of performance shall be 400 calendar days.
END STATEMENT OF WORK