Statement of Work.pdf

PDF 95 KB Posted

Attached to
596-21-1-5848-0001- 596A4-18-103- Upgrade Elevators P4, P5, S6, & S7 TBC
Solicitation number
36C24921R0124
Issued by

About this file

This statement of work outlines an upgrade project for elevators P4, P5, S6, and S7 at a Veterans Affairs medical center. The project includes selective demolition of existing components and systems, as well as general construction and installation of new architectural, fire protection, mechanical, and electrical systems to modernize the elevators. Item I of the bid covers all general construction work. The performance period is 400 calendar days. A related federal contract opportunity on the Federal Business Opportunities website solicits bids for the 596A4-18-103 project to upgrade the elevators through the Department of Veterans Affairs Veterans Health Administration VISN 9.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Project: 596A4-18-103 Upgrade Elevators P4, P5, S6, & S7- TBC

GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing components ,assemblies, structures, and furnish labor and materials and perform work for Project 596A4-18-103 Upgrade

Elevators P4, P5, S6, & S7 -TBC as required by drawings and specifications.

B. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Work includes selective demolition, general construction, alterations, electrical , fire protection, and lighting.

Work includes all labor, material, equipment, and supervision to perform the required upgrades and construction work on this project including architectural modifications, fire protection systems, mechanical systems, and electrical systems as described in bid documents to upgrade P4, P5, S6, and S7 elevators.

B. Period of performance shall be 400 calendar days.

END STATEMENT OF WORK