This document provides details for a federal contract solicitation to upgrade elevators at a Veterans Affairs facility. The solicitation number is 36C24921R0124 and concerns upgrades to elevators P4, P5, S6, and S7 at the Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 facility. Responses are due by 596-21-1-5848-0001. The work includes upgrading the specified elevators. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P

M

COVER SHEET

JAB

GI001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Dwg. of

17-274

ACG Project Number

FULLY SPRINKLERED

Engineers Architects

BID DOCUMENTS

08/10/2020

MAIN BLDG

UPGRADE ELEVATORS P4, P5,

S6, AND S7

596A4-18-103

LEXINGTON, KY 40502

Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420

Elevator Consultant:

BID DOCUMENTS

PROJECT # 596A4-18-103

UPGRADE ELEVATORS P4, P5, S6, AND S7

LEXINGTON VA MEDICAL CENTER

VICINITY MAP CAMPUS MAPVICINITY MAP

1 4

LEXINGTON

VA MEDICAL

CENTER CAMPUS

LEXINGTON

VA MEDICAL

CENTER CAMPUS

LOCATION

INDEX OF DRAWINGS

GENERAL

ARCHITECTURE

COVER SHEETGI001

A-102

A-101

GI002 2 OF 4GENERAL INFORMATION

ELECTRICAL

ED101

E-001

ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, ABBREVIATIONS, AND SCHEDULES

PARKING GARAGE LEVEL 'C' POWER PLAN

ELECTRICAL DEMOLITION PLANS

GROUND FLOOR TRANSFORMER & SWITCHGEAR ELECTRICAL DEMOLITION PLANS

A-201

A-400

INFECTION CONTROL RISK ASSESSMENT - (ICRA)

GI003 3 OF 4

GI004 4 OF 4ICRA AND CONSTRUCTION PHASING PLANS

FIRE ALARM

FIRE ALARM NOTES, LEGEND, ABBREVIATIONS, AND RISER DIAGRAM

FA001

FA100

FA101

OVERALL GROUND FLOOR FIRE ALARM PLAN

PARKING GARAGE LEVEL 'C' AND FIFTH FLOOR ELEVATOR EQUIPMENT ROOM FIRE ALARM PLANS

OVERALL GROUND FLOOR PLAN AND CONSTRUCTION ROUTE

PARKING GARAGE FLOOR PLAN AND ENLARGED PLANS

SERVICE ELEVATOR CAB INTERIOR ELEVATIONS

ELEVATOR RISER DIAGRAM

A-202

PASSENGER ELEVATOR CAB INTERIOR ELEVATIONS

MECHANICAL

MECHANICAL PLANS, SCHEDULES AND CONTROLS

M-101 1 OF 1

JJG

NOTE:

FOR ALL ELEVATOR MODIFICATIONS - REFERENCE DIVISION 14 SPECIFICATIONS

THE ELEVATORS CAN BE DOWN FOR 1 HOUR MAXIMUM (COORDINATE WITH ELECTRICAL & VA COR).

AFTER 12:01AM ON A SATURDAY - CONTRACTOR TO PROVIDE SPECIAL SIGNAGE &

TRANSPORTATION FOR EMERGENCY STAFF AS REQUIRED

GROUND FLOOR TRANSFORMER & SWITCHGEAR POWER PLAN

ELECTRICAL HOISTWAY ELEVATION PLAN

ELECTRICAL DETAILS

ED102

EP101

EP102

E-201

E-501

NOTE: FOR ALL ELEVATOR MODIFICATIONS, SEE SPECIFICATIONS

ELEVATORS INCLUDED IN THIS PROJECT - P4, P5, S6, S7

ELEVATORS ARE LOCATED IN MAIN BUILDING 1A.

PREPARE FOR THE REPLACEMENT OF THE ATS.

FA102

FA103

OVERALL SECOND FLOOR FIRE ALARM PLAN

OVERALL THIRD FLOOR FIRE ALARM PLAN

11296

R E G

I

S

T

E

R

E

D A

R

C

H

I

T

E

C

T

N

O

R

T

H

C A

R

O

L

I

N

A

J

E

F

F

R

E

Y

A

B

R

O

O

K

S

R

A

L

E

I

G

N

O

RT

R

O

L

I

N

A

DocuSign Envelope ID: 33FE4D5E-9D7F-48C9-B1D9-935AF5515DE0

8/7/2020

GENERAL NOTES:

ALL ELEVATOR SUBMITTALS TO BE REVIEWED & APPROVED

PRIOR TO MOBILIZATION

COMPLETE ONE ELEVATOR CAB BEFORE STARTING ANOTHER.

FINAL ELEVATOR EQUIPMENT PLANS WILL BE DESIGNED BY

ELEVATOR CONTRACTOR

THE CONTRACTOR AND SUBCONTRACTORS INVOLVED

IN THIS PROJECT SHALL BE RESPONSIBLE FOR

INSTALLING THEIR RESPECTIVE WORK AND

SYSTEMS TO MEET ALL APPLICABLE FEDERAL,

STATE, AND LOCAL CODES, LAWS, SAFETY

REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE

CONTRACTOR SHALL FURNISH ALL NECESSARY

PERMITS.

THE CONTRACTOR SHALL REVIEW THE DRAWINGS,

SPECIFICATIONS AND UNDERSTAND THE SCOPE OF THE

DRAWINGS TO BE THE FOLLOWING:

THESE CONSTRUCTION DOCUMENTS (DRAWINGS,

SPECIFICATIONS, ADDENDA, ETC.)

INDICATE THE GENERAL SCOPE OF THE PROJECT IN

TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE

DIMENSIONS OF THE BUILDING, THE MAJOR

ARCHITECTURAL ELEMENTS, AND THE MAJOR

STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA

SYSTEMS. ON THE BASIS OF THE GENERAL SCOPE

INDICATED IN THESE DOCUMENTS, THE TRADE

CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED

FOR THE PROPER EXECUTION AND COMPLETION OF THEIR

WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL

AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR

WARRANTY FOR THEIR WORK UNLESS A LONGER

WARRANTY IS INDICATED IN THE SPECIFICATIONS.

CONTRACTORS SHALL FOLLOW AND OBEY APPLICABLE

FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY

REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.

DO NOT SCALE DRAWINGS. DIMENSIONS SHALL

GOVERN EACH BUILDING COMPONENT LOCATION.

BRING DISCREPANCIES TO THE COR'S

ATTENTION IN WRITING IMMEDIATELY.

ALL WORK SHALL BE PERFORMED IN A SKILLED

WORKMANSHIP TYPE AND MANNER ACCEPTABLE TO

THE COR'S.

PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN

DIFFERENT MATERIALS.

EXISTING CONDITIONS SHALL BE FIELD VERIFIED PRIOR

TO BEGINNING OF WORK. ANY ERRORS OR OMISSIONS

SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION IN

WRITING IMMEDIATELY.

ALL CARS TO BE CONSTRUCTED ON THE GROUND FLOOR,

INSIDE THE SHAFT.

CONTRACTOR IS RESPONSIBLE FOR ALL SERVICE CALLS AND

SERVICES FOR ALL 5 ELEVATORS AFTER THE EXECUTION

AND DURING THE DURATION OF THEIR CONTRACT.

FOR OVERHEAD PIPE WORK ABOVE CEILING OUTSIDE THE

ARE OF WORK FOR THIS PROJECT, COORDINATE WITH VA COR

ABOUT OFF-HOUR SCHEDULE AND ICRA PROTECTION

REQUIREMENTS.

CONTRACTOR TO RE-LABEL ALL DOORS WITH SAME SIGNAGE AS

EXISTING FROM 290 SIGN COCOMPANY- (SOLE SOURCE)

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

SYMBOL LEGEND

SITE PLAN NORTH ARROW

BUILDING WALL SECTION INDICATION

DETAIL INDICATION

ROOM NAME

ROOM NUMBER

AREA DETAILED

NORTH ARROW

NORTH

LIMIT OF WORK

BREAK LINE

SECTION NUMBER

SHEET WHERE SHOWN

SHEET WHERE SHOWN

DETAIL NUMBER

KEYNOTE INDICATOR

ROOM NAME

A101

SIM

N

ROOM INDICATION

KEYNOTE SYMBOL

A101

X

EXISTING WALL

TEMPORARY BARRIER

CONSTRUCTION ROUTE

GENERAL DEMOLITION NOTES:

A. REMOVE EXISTING CONSTRUCTION AS

DESIGNATED HEREIN AND CLEAR AREA

OF DEBRIS PRIOR TO PROCEEDING WITH

NEW CONSTRUCTION.

B. EXISTING EQUIPMENT REMOVED

SHALL BE PROPERLY DISPOSED OFF

MEDICAL CENTER GROUNDS.

COORDINATE WITH VA COR.

C. NOTIFY CONTRACTING OFFICER'S

REPRESENTATIVE OF ANY AREA

REQUIRING DEMOLITION FOR

INSTALLATION OF MECHANICAL,

PLUMBING, STRUCTURAL, ELECTRICAL,

OR DATA ITEMS (INCLUDING ROOF

PENETRATIONS) NOT SHOWN IN THESE

DRAWINGS. AFTER SUCH DEMOLITION

AND INSTALLATION, PATCH OR REPLACE

MATERIALS AND FINISHES TO MATCH

EXISTING.

D. THE INFORMATION CONTAINED IN

THESE DEMOLITION DOCUMENTS DEFINES

GENERAL SCOPE ONLY AND DOES NOT

RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY OF PROVIDING ALL

DEMOLITION REQUIRED FOR THE

COMPLETION OF THE PROJECT.

E. REFER TO THE ENGINEER'S

SPECIFICATION & DRAWINGS FOR

FURTHER INFORMATION REGARDING

DEMOLITION OF MECHANICAL,

ELECTRICAL, PLUMBING & ELEVATOR

EQUIPMENT SYSTEMS.

F. ALL DEMOLITION WORK SHALL BE

PERFORMED WITH "CARE AND DILIGENCE"

IN ORDER TO PREVENT ARBITRARY

DAMAGE OR INTERRUPTION OF SERVICE

OR CONCEALED UTILITIES INTENDED TO

REMAIN IN SERVICE. DISCOVERY OF

UTILITIES OR CONDITIONS LOCATED

DIFFERENTLY FROM THAT INDICATED OR

THAT ARE NOT IDENTIFIED. SHALL BE

REPORTED TO THE CONTRACTING

OFFICER.

G. CONTRACTOR IS RESPONSIBLE TO

ENSURE LIGHTING, SMOKE DETECTOR

AND EXIT SIGNS WILL BE AVAILABLE

DURING CONSTRUCTION FOR EACH

PHASE. COORDINATE WITH VA COR AND

SAFETY ABOUT RELOCATION OF THESE

ELEMENTS PRIOR TO ERECTING

TEMPORARY CONSTRUCTION BARRIER.

A/C AIR CONDITIONING

ACOUS ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

A&E ARCHITECT AND ENGINEERS

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITIES HAVING JURISDICTION

AHU AIR HANDLING UNIT

ALT ALTERNATIVE

ALT TRANS ALTERNATIVE TRANSPORTATION

ALUM ALMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AVG AVERAGE

BB BULLETIN BOARD

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BOD BASIS OF DESIGN

BRG BEARING

CB CATCH BASIN

CBB CEMENTITIOUS BACKER BOARD

CER CERAMIC

CF CUBIC FEET

CFCI CONTRACTOR FURNISH

CONTRACTOR INSTALL

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD

C & G CURB & GUTTER

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNITS

CO CLEANOUT(S)

COL COLUMN

CONC CONCRETE

CONT COTINUOUS

COORD COORDINATE

CP CONCRETE PIPE

CPT CARPET

CR CRASH RAIL

CRS COLD ROLLED STEEL

CS CAST STONE

CSB CONCRETE SPLASH BLOCK

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CT CERAMIC TILE

CTR CENTER

CU FT CUBIC FEET

CUH CABINET UNIT HEATER

CY CUBIC YARD

D DRYER

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DISP DISPENSER

DIV DIVISION

DN DOWN

DR DOOR

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

E EAST

(E) EXISTING

EA EACH

EF EXHAUST FAN

EFTR EXISTING FINISH TO REMAIN

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EQ EQUAL

EQUIP EQUIPMENT

EST ESTIMATED

ETR EXISTING TO REMAIN

ETS EXPOSED TO STRUCTURE

ARCHITECTURAL ABBREVIATIONS

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FF & E FURNITURE FIXTURES & EQUIPMENT

FIN FINISH

FIXT FIXTURE

FL FLOW LINE

FLR FLOOR

FLUOR FLUORESCENT

FO FINISH OPENING

FOS FACE OF STUD

FR FIRE RATED

FSP FIRE STANDPIPE

FT FOOT / FEET

FTG FOOTING

FURR FURRING

FV FIELD VERIFY

FVC FIRE VALVE CABINET

FWC FABRIC WALLCOVERING

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GARBAGE DISPOSAL

GF CMU GROUND FACE CMU

GFCI GROUND FAULT CIRCUIT

INTERRUPTER

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLACK

GLU LAM GLUE LAMINATED WOOD

GND GROUND

GT GROUT

GYP BD GYPSUM BOARD

GYP GYPSUM

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIB

HC HOLLOW CORE

HCP HANDICAPPED

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HGT HEIGHT

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR, HANDRAIL

HT HEIGHT

HVAC HEATING, VENTILATING & AIR

CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID INSIDE DIAMETER

IG INSULATING GLASS

IN INCH

INCAN INCANDESCENT

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INV INVERT

ITG INSULATED TEMPERED GLASS

JAN JANITOR

J-BOX JUNCTION BOX

JT JOINT

L LONG

LAV LAVATORY

LB(S) # POUND(S)

LF LINEAL FEET

LLV LONG LEG VERTICAL

LT LIGHT

LVR LOUVER

M & BH MOP AND BROOM HOLDER

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MECH MECHANICAL

MEPF MECHANICAL, ELECTRICAL,

PLUMBING,

FIRE PROTECTION (CONDUIT)

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MO MASONRY OPENING

MSB MOP SERVICE BASIN

MTD MOUNTED

MTL METAL

N

NORTH

NA NOT APPLICABLE

NECY NECESSARY

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER,

OVERFLOW DRAIN

OFCI OWNER FURNISHED

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED

OWNER INSTALLED

OH OPPOSITE HAND

OPN OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

P PAINT

PARTN PARTITION

PBD PARTICLE BOARD

PBSW PATIENT BED SERVICE WALL

PCC PRECAST CONCRETE

PI PSYCHIATRIC INPATIENT

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PMU PSYCHIATRIC MEDICAL UNIT

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATED

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT CONCPOST-TENSIONED CONCRETE

PTD PAPER TOWEL DISPENSER

PTL PORCELAIN TILE

PVC POLYVINYL CHLORIDE

QA QUALITY ASSURANCE

QT QUARRY TILE

R-VALUE (INSULATION),

RADIUS, RISER

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RE: REFERENCE

REBAR REINFORCING BAR

REC RECESSED

RECPT RECEPTACLE

REF REFRIGERATOR

REG REGISTER

REINF REINFORCE

REQD REQUIRED

RESIL RESILIENT

REV REVISION

RFT RESILIENT FLOOR TILE

RH ROOF HATCH

RM ROOM

RO ROUGH OPENING

RT RUBBER STAIR TREAD

S

SOUTH

SAF SEAMLESS ACRYLIC FLOORING

SAP SUSPENDED ACOUSTICAL PANELS

SAT SUSPENDED ACOUSTICAL TILE

SB SPLASHBLOCK

SC SEALED CONCRETE, SOLID CORE

SCHED SCHEDULE

SCP SCUPPER

SD SOAP DISPENSER

SEAL SEALER

SECT SECTION

SECT SECTION

SF SQUARE FOOT

SF CMU SPLIT-FACE CMU

SHR SHOWER

SHT SHEET

SHTG SHEATHING

SIM SIMILAR

SL SLOPE

SLV SHORT LEG VERTICAL

SND SANITARY NAPKIN DISPOSER

SNV SANITARY NAPKIN VENDOR

SPECS SPECIFICATIONS

SQ SQUARE

SS SOLID SURFACE

SST STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TB TACKBOARD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TBD TO BE DETERMINED

TD TUBULAR DAYLIGHTING DEVICE

TEL TELEPHONE

TEMP TEMPERATURE

TG TEMPERED GLASS,

TONGUE & GROOVE,

TRANSFER GRILLE

THRU THROUGH

TO TOP OF

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOS TOP OF STEEL

TOW TOP OF WALL

TTD TOILET TISSUE DISPENSER

TV TELEVISION

TYP TYPICAL

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

URN URINAL

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VIF VERIFY IN FIELD

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WDP WOOD PANELING

WDW WINDOW

WF WIDE FLANGE

WGL WIRED GLASS

WH WATER HEATER

WR WASTE RECEPTACLE,

WATER RESISTANT

WS WATER STOP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

INV INVERT

ITG INSULATED TEMPERED GLASS

TT TERRAZZO TILE

BASIS OF DESIGN

· SIMPLEX FIRE ALARM

· TK ELEVATOR

· ASCO TRANSFER SWITCHES

· 290 SIGNS

P

M

GENERAL INFORMATION

KC JJG

GI002

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Dwg. of

17-274

ACG Project Number

FULLY SPRINKLERED

Engineers Architects

BID DOCUMENTS

08/10/2020

MAIN BLDG

UPGRADE ELEVATORS P4, P5,

S6, AND S7

596A4-18-103

LEXINGTON, KY 40502

Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420

Elevator Consultant:

BID DOCUMENTS

2 4

11296

R E G

I

S

T

E

R

E D A

R

C

H

I

T

E

C

T

N

O

R

R

O

L

I

N

A

J

E

F

F

R

E

Y

A

B

R

O

O

K

S

R

A

L

E

I

G

R

O

L

I

N

A

HEPA

NEGATIVE AIR

UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE

PROTECT AND STORE

EXISTING WINDOW TO

BE RE-INSTALLED

AFTER CONSTRUCTION

IS COMPLETE.

V I F

V

I F

V.I.F.

V I F

E X

I S

T I N

G

W

A L L

V I F

E X

I S

T I N

G

W

A L L

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

I G

H T

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE

UPGRADE ELEVATOR PROJECT

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA

PLEASE USE ALTERNATE EXITS AS MARKED

1'-5"

ICRA, ILSM, FIRE WATCH AND

MISC. FORMS

PAPER

CADDY

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

A P

P R

O X

A

F

F

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

HARD BARRIER

WITH DOOR &

HINGES. SEE

5/GI003

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY

MATS (CHANGED END

OF SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

SUPPLY DUCTS

EITHER KEEP

RUNNING OR COVER

WHEN RUNNING TO

KEEP DUST OUT

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

F L E

X

D

U C

T

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL

STATION WITH

AUDIO / VISUAL

HEPA NEGATIVE

AIR UNIT

HARD BARRIER WITH

DOOR & HINGES

P

M

INFECTION CONTROL RISK

ASSESSMENT - (ICRA)

A.

B.

C.

D.

E.

GENERAL

SEE SHEET GI004 FOR PRE-CONSTRUCTION RISK

ASSESSMENT FORMS AND INFECTION CONTROL

PRECAUTIONS.

SEE SHEET GI004 FOR PHASING PLANS AND

DESCRIPTION.

ALL APPLICABLE PERMITS AND COR APPROVALS

SHALL BE COMPLETED PRIOR TO BEGINNING ANY

WORK FOR EACH PHASE. PERMITS INCLUDE: ICRA,

ILSM, ABOVE CEILING FIRE/SMOKE WALL, UTILITY,

FIRE ALARM SYSTEM, MEDICAL GASES, AND

CONFINED SPACES.

WORK REQUIRED BY INFECTION CONTROL SHALL

BE PERFORMED FOR EACH PHASE OF THE

PROJECT.

CONTRACTOR SHALL EXHAUST ALL AIR FROM

SPACES WHERE WORK IS BEING PREFORMED

DIRECTLY TO THE EXTERIOR OF THE BUILDING.

ENSURE EXHAUST POINTS ARE LOCATED AWAY

FROM INTAKE POINTS FOR THE BUILDING. EXHAUST

LOCATIONS TO BE APPROVED BY COR.

Scale: 1/2" = 1'-0"

CROSS SECTION 'A'

Scale: 1/2" = 1'-0"

MOBILE CONTAINMENT CART

Scale: 6" = 1'-0"

ILSM SIGNAGE

ILSM TEMPORARY BARRIER TAG

Scale: 1/2" = 1'-0"

ROOM ELEVATION

Scale: 1/2" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

JAB

GI003

JJG 3 4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Dwg. of

17-274

ACG Project Number

FULLY SPRINKLERED

Engineers Architects

BID DOCUMENTS

08/10/2020

MAIN BLDG

UPGRADE ELEVATORS P4, P5,

S6, AND S7

596A4-18-103

LEXINGTON, KY 40502

Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420

Elevator Consultant:

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

N

AREA OF WORK

WITHIN BUILDING #1

N

AREA OF WORK

WITHIN BUILDING #1

BID DOCUMENTS

S6, S7

P4, P5

SHEET NOTES:

11296

R E

G

I

S

T

E

R

E

D A

R

C

H

I

T

E

C

T

N

O

R

R

O

L

I

N

A

J

E

F

F

R

E

Y

A

B

R

O

O

K

S

R

A

L

E

I

G

R

O

L

I

N

A

ICRA GENERAL NOTES:

1.

2.

NO MAJOR EQUIPMENT ACCESS THROUGH THE BUILDING BETWEEN 7AM TO

5PM. CONTRACTOR TO COORDINATE WITH VA COR.

LOBBY WORK CAN BE COMPLETED DURING REGULAR BUSINESS HOURS IF A

CONSTRUCTION BARRIER IS INSTALLED PRIOR TO PERFORMING WORK.

UP DN

CORRIDOR

DH001

STAIR

PAS06

MECH

RM

D-B038

EMERGENCY

GENERATOR

D003

TRANSFORMERS &

SWITCHGEAR

D003A

ELEVATOR

LOBBY

PC02

ELEVATOR

PCE05

ELEVATOR

PCE04

FF:VCT

CORRIDOR

DH002

CORRIDOR

TD

D002

ELEVATOR

S7

ELEVATOR

S6

ICRA AND CONSTRUCTION PHASING

PLANS

KC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Dwg. of

17-274

ACG Project Number

FULLY SPRINKLERED

Engineers Architects

BID DOCUMENTS

08/10/2020

MAIN BLDG

UPGRADE ELEVATORS P4, P5,

S6, AND S7

596A4-18-103

LEXINGTON, KY 40502

Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420

Elevator Consultant:

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

N

AREA OF WORK

WITHIN BUILDING #1

N

AREA OF WORK

WITHIN BUILDING #1

BID DOCUMENTS

S6, S7

P4, P5

SHEET NOTES

SHEET KEY NOTES

1.

1A.

1B

2.

3.

3A

3B

4.

5.

6.

7.

8.

GI004

JJG 4 4

SWITCHGEAR / MECH ROOM ENLARGED PHASING PLAN

SCALE:3/16" = 1'-0"

ICRA TRANSFORMER & SWITCHGEAR / MECH ROOM ENLARGED PHASING PLAN

SCALE:3/16" = 1'-0"

(OFF-HOUR)

PHASE 1

(OFF-HOUR)

PHASE 2

ICRA TRANSFORMER &

5 5

4 4

PHASE 3

(OFF-HOUR)

PHASE 4

(OFF-HOUR)

ICRA ELEVATORS PLAN S6 AND S7

SCALE:3/16" = 1'-0"

PROVIDE TEMPORARY PROTECTIVE HARD BARRIER WITH

DOOR & HINGES, TO BOTTOM OF CEILING

PROVIDE 1-HR RATED TEMPORARY CONSTRUCTION

BARRIER CONSISTING OF SEALED 5/8" GYPSUM BOARD ON

BOTH SIDES OF 3-5/8" METAL STUD PARTITION EXTEND TO

BOTTOM OF FLOOR OR ROOF DECK ABOVE. SEAL TOP AND

BOTTOM OF PARTITION. PARTITION SHALL BE INSPECTED

BY VA ICRA STAFF PRIOR TO START OF CONSTRUCTION IN

SPACE. SEE TEMPORARY PARTITION TYPE "T" ON SHEET

GI003.

PROVIDE RATED 3' WIDE BY 7' TALL HARD DOOR WITH

ASSOCIATED HARDWARE FOR TEMPORARY PARTITION.

COORDINATE WITH VA COR ON SECURING

EGRESS DOOR DURING THIS CONSTRUCTION

PHASE(S).

CONSTRUCTION ROUTE THRU THE BASEMENT

LEVEL TO LOADING DOCK AS INDICATED ON

SHEET GI003

PROVIDE TEMPORARY CONSTRUCTION SIGN FOR

PHASE 9 CONSTRUCTION WORK IN THE

STAIRWELL AND LOBBY AREA. TEMPORARY

CONSTRUCTION SIGN SHALL INCLUDE

ALTERNATE EGRESS MAP TO DIRECT STAFF AND

VISITORS TO THE NEAREST STAIRS 1, 2 AND 4.

COORDINATE WITH VA COR PRIOR TO ERECTING

SIGN.

PROVIDE CONSTRUCTION SIGN FOR PHASE 8

CONSTRUCTION WORK IN the RESTROOM AND

THE LOBBY AREA TO INDICATE NO ACCESS TO

THE LOBBY.

PROVIDE STICKY MAT AT CONSTRUCTION

ACCESS POINT. (MAT SHALL BE INSPECTED AND

CHANGED FREQUENTLY TO ENSURE

EFFECTIVENESS)

USE PORTABLE DUST EXTRACTOR AND AIR

SCRUBBER WITH HEPA FILTRATION SYSTEM

COORDINATE WITH VA COR ABOUT OFF-HOURS

SCHEDULE AND TEMPORARY REROUTING

ACCESS FOR HOSPITAL STAFF/VISTORS PRIOR

TO ERECTING TEMPORARY BARRIER

CONSULT WITH THE VA SAFETY DEPARTMENT TO

MAINTAIN A MINIMUM CLEARANCE IN HALLWAY

REFER TO SHEETS A-101 AND A-102 FOR

CONSTRUCTION ROUTE FOR EACH PHASE

OF CONSTRUCTION

SEE SHEET A-101 FOR CONSTRUCTION ACCESS

FROM BASEMENT TO LOADING DOCK

SPECIFICATION REQUIRES CLASS II ICRA

REQUIREMENTS. SEE SPECIFICATION SECTION

01 35 26 FOR MORE INFORMATION.

GC TO INCLUDE ALL ICRA BARRIER DOOR

HARDWARE

CONTRACTOR TO ENSURE ACCESS TO EXISTING

FIRE EXTINGUISHERS OR FIRE ALARM PULL

STATIONS ARE MAINTAINED. RELOCATE SAID

EXTINGUISHERS OR PULL STATIONS UNTIL SUCH

TIME THAT THEY CAN BE RETURNED TO THEIR

ORIGINAL LOCATIONS. COORDINATE LOCATION WITH

VA COR AND SAFETY IN ADVANCE

DO NOT REMOVE TEMPORARY BARRIERS FOR EACH

PHASE AND ALL HVAC ISOLATION UNTIL

CONTRACTOR HAS CLEANED CONSTRUCTION SITE,

VA INFECTIONS DISEASE CONTROL HAS INSPECTED

AND APPROVED THE CLEANING

VA REQUIRES THAT ALL APPLICABLE PERMITS BE

COMPLETED AND APPROVED PRIOR TO BEGINNING

ANY WORK. PERMITS INCLUDE ICRA, ILSM, ABOVE

CEILING, FIRE ALARM SYSTEM

CONTRACTOR SHALL PROTECT AREA ADJACENT TO

THE DEMOLITION AND NEW CONSTRUCTION WORK

TO PREVENT DAMAGES. (IF DAMAGED, REPAIR,

PATCH, SAND AND REFINISH TO MATCH EXISTING

COORDINATE CONSTRUCTION SCHEDULE WITH VA

COR TO ENSURE STAFF ACCESS FROM ELEVATOR

LOBBIES TO THEIR OFFICES OR OTHER ROOMS

DURING CONSTRUCTION

SEE ARCHITECTURAL PLANS AND DETAILS FOR

DEMOLITION AND RENOVATION WORK

ALL LIGHTING, SMOKE DETECTOR AND EXIT SIGN IN

THE ELEVATOR LOBBY AREAS SHALL REMAIN

AVAILABLE DURING CONSTRUCTION.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11296

R E G

I

S

T

E

R

E

D A

R

C

H

I

T

E

C

T

N

O

R

R

O

L

I

N

A

J

E

F

F

R

E

Y

A

B

R

O

O

K

S

R

A

L

E

I

G

R

O

L

I

N

A

UP

UP DN

GARAGE GATE

UP

MOTOR

CYCLE PARKING

WHEEL

CHAIR PARKING

DN

ATM

DN

RAISED FLOOR

GAS CYL

STORAGE

B005D

HAC

A006F

ELEC.

B009

ELECTRICAL

AU003

ELECTRICAL

AU002ELECTRICAL

AU001

SIGNAL CLOSET

D008

TOILET

FEMALE

B019

PREPARATION STERILIZATION

WORK RM

A005C

STORAGE

A008

FOOD

SERVICING

A006D

CLERK

TYPIST

A011

ASST

CHIEF

A012

CHIEF

A010

PARKING LEVEL A

PA01

MECH RM

D-B038

CORRIDOR

BH005

STORAGE

PA08

OTHER SPACE

PAM03

STORAGE

PA07

ELEVATOR

LOBBY

PA02

STAIRWELL

PAS05

STORAGE

D006STORAGE

D005A

EMS

D005

MECH RM

D004

CORRIDOR

DH001

CORRIDOR

DH002

CORRIDOR

DH004

CORRIDOR

DH003

CORRIDOR

DH003

COMM EQUIP

RM

D007D

TD

D002

ELECTRICAL

D001

STAIR

PAS06 STAIR

PAS07

STORAGE AREA

PA06

PAINT SHOP

D007C

CARPENTER SHOP

D007

LOCKSMITH

D007B

CHIEF

D007A

CORRIDOR

DH005

STAIR

PAS08

CORRIDOR

BH002

M&O

FORMAN

B013

CHIEF

ELECTRICIAN

B014B

ELECTRIC SHOP

B014C

ELECTRONIC

B014

CORRIDOR

BH003

CORRIDOR

BH003

STORAGE

FLAMMABLE

B016

OFFICE

B017

STAFF

TOILET

B015A

WARE HOUSE

B015

STORAGE

GENERAL

B020

MAIL RM

B015B

EMS EQUIP

B021

TOILET

MALE

B018

SOILED

UTILITY

B022A

CORRIDOR

BH004

OFFICE

B022D

OFFICE

B022E

LOGISTICS SVC

INVENTORY MGMT

B022

OFFICE

B022C

OFFICE

B022B

OFFICE

B022A

EMERGENCY GENERATOR

RM

B037

TRANSFORMER RM

B037A

A/C REFRIGERATION

EQUIP RM

B038

CORRIDOR

BH004

ELECTRICAL DISTRIBUTION

RM

B037B

SVC RM

B039

CORRIDOR

BH006

CORRIDOR

BH006

HAS

B044

HAS

B044C

HAS

B044B

EMS OFFICE

B042A

EMS CHECK IN

B042B

SECY/

RECEPTIONIST

B-042

OFFICE

ASST CHIEF

WORK RM

B-042C

TOILET

B044A

IT

B046

EMS

B043

ELECTRIC

CLOSET

B043A

CHARTING

A032E

HALL

A032

CONFERENCE RM

A032D

RESIDENTS

OFFICE

A032C

SECY

OFFICE

A032B

PM&RS CHIEF'S

OFFICE

A032A

MAIN KITCHEN

B036

DISH

WASHING

A020

CONFERENCE M

A029

BREAK RM

B045A

SUPV OFFICE

B045

SURGICAL PACK

B045C

ENVIRONMENTAL

MGMT SUPPLY

B045D

STORAGE

B045B

MAIN KITCHEN

B036

LINEN

B036D

EMS

B036C

MENS

TOILET

B041

FEMALE

TOILET

B040

CANTEEN STORAGE

B036B

OFFICE

B035

STORAGE

B035A

DAIRY & EGG

REFRIG

B036G

OFFICE SUPVS

B036F

CORRIDOR

AH005

CORRIDOR

AH004

CORRIDOR

AH006

CORRIDOR

AH004

SECY

A028

DIETICIANS

OFFICE

A025A

ASST CHIEF

A027

DIETICIANS

OFFICE

A025EMS

A023

ELECTRIC

CLOSET

AU004

ELEVATOR

LOBBY

A000

ELEVATOR LOBBY

A001

BREAK RM

A021

EQUIP

STORAGE AREA

B001

STORAGE

& ISSUE

B034

OFFICE

A019

ELECTRIC

CLOSET

BU003

EMS

A001B

DUMB

ELEVATOR

SOILED RECEIVING

DECONTAMINATION AREA

B005

MANUAL

CART WASH

B005B

STAIRWELL

BS003HALL

B004

EMS

B005A

WOMENS TOILET

B002

MENS TOILET

B003

STORAGE

B009A

HALL

B006A

CORRIDOR

OX101

BULK

STORAGE

B010

LOGISTICS

STORAGE

B011

ELECTRIC

CLOSET

BU002

UNION OFFICE

B011A

FF: VCT

AC PLUMBING

MACH

B012

OFFICE

B012A

CORRIDOR

BH001

CORRIDOR

AH003

CLEAN RECEIVING

B007

CORRIDOR

AH002

STERILE AND NON-STERILE

STORAGE

A001A

RETAIL STORE

A009

STAIRWELL

PAS04

CORRIDOR

AH001

ELECTRIC

CLOSET

AU005

OFFICE

ASST CHIEF

A003

KITCHEN

A006

OFFICE

CANTEEN

A007

REFR WALK IN

A006B

PREFAB

REFRIG

A006C

FOOD

STORAGE

A006A

SERVING LINE

A005

AU008 AU007 AU006

STAIR

AS002

CAFETERIA

A004A

VCS OFFICE

A004E

VCS OFFICE CHIEF

A004A

STORAGE

A004

STORAGE

A004A

EMS

A004B LOUNGE

A002

LOCKERS

FEMALE

A002A

TOILET &

SHOWERS

A002B

IT CLOSET

A002C

TOILET

A024TELEPHONE EQUIP RM

A022

LOCKERS

A026B

EMS

A026

PHYSICAL

THERAPY

A035

STORAGE

A033

HYDROTHERAPY

A034

RECEPTION

A030

CORRIDOR

AH007

PHYSICAL THERAPY

OUTPATIENT

A036

CORRIDOR

A030A

WAITING AREA

A042

EXAM/EMG

A037

PROVIDER

A038

EXAM

A041

EXAM

A040 PROVIDER

A039

STAIRWELL

AS001

TOILET & SHOWERS

A046

A026A TOILET

FEMALE

A045

OT CLINIC

A044

OT OFFICE

A043

OT OFFICE

A043A

RECEPTION AREA

A050

CORRIDOR

AH009

OFFICE

A070RECEIVING

A071

SVC MGR

A072

CORRIDOR

AH008PGM MGR

A068

OFFICE

A069

COMPUTER RM

A073

CORRIDOR

AH010

SOFTWARE APPL

SUPPORT

A067

APPLICATION

SUPPORT

A066

SYSTEMS

MGR

A065

NETWORKING

MGR

A064

PROG MGR SYST &

NETWORKING

A063

ADP

WORKSHOP

A062

STAIRWELL

AS004

TELECOMM

SVCS

A061

TELECOMM

SVCS

A060

SUPPORT

A059

APPLICATION

SUPPORT

A058

APPLICATION

SUPPORT

A057

OFFICE

A051

PGM

SPECIALISTS

A052

PGMMING &

INFO

A053

PGMMING &

INFO

A054

CONFERENCE

RM

A055

ELECTRICAL

A056

MECHANICAL

B015F

FF: CONC.

PROSTHETICS STORAGE

B015C

FF: VCT

MORGUE

B015A

FF: VCT

LOGISTICS BREAKDOWN

B006B

FF: VCT

LOADING DOCK

AREA

LIMIT OF

WORK

LIMIT OF

WORK

TRAVEL DISTANCE: 55'-6"

T R

A V

E L

D

I S

T

T R

A V

E L

D

I S

T

TR. DIST.: 20'-2"

PROPOSED

CONTRACTOR

LAY DOWN AREA

VERIFY FINAL

LOCATION W/ COR

PROVIDE 8'-0" TALL

SECURITY FENCE ON

THREE SIDES.

EXIT

T R

A V

D

I S

T

TRAVEL DISTANCE: 16'-11"

"TOWER" BUILDING #1

NO SCOPE THIS PROJECT

MAIN BUILDING #1A

P

M

OVERALL GROUND FLOOR

PLAN AND CONSTRUCTION

ROUTE

KC JJG

A-101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Dwg. of

17-274

ACG Project Number

FULLY SPRINKLERED

Engineers Architects

BID DOCUMENTS

08/10/2020

MAIN BLDG

UPGRADE ELEVATORS P4, P5,

S6, AND S7

596A4-18-103

LEXINGTON, KY 40502

Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420

Elevator Consultant:

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

N

AREA OF WORK

WITHIN BUILDING #1

N

AREA OF WORK

WITHIN BUILDING #1

BID DOCUMENTS

S6, S7

P4, P5

OVERALL GROUND PLAN AND CONSTRUCTION ROUTE

SCALE:1/16" = 1'-0"

SHEET KEY NOTES - NEW

1 5

GROUND FLOOR CONSTRUCTION ROUTE

INDICATES PROPOSED

CONSTRUCTION PATHWAY

ELEV

S7

ELEV

S6

ELEV

PAE04

ELEV

PAE05

MECH

RM

D-B038

EMERGENCY

GENERATOR

D003

TRANSFORMERS

& SWITCHGEAR

D003A

A-102

11296

R E G

I

S

T

E

R

E

D A

R

C

H

I

T

E

C

T

N

O

R

R

O

L

I

N

A

J

E

F

F

R

E

Y

A

B

R

O

O

K

S

R

A

L

E

I

G

R

O

L

I

N

A

DocuSign Envelope ID: 33FE4D5E-9D7F-48C9-B1D9-935AF5515DE0

8/7/2020

AutoCAD SHX Text

NORTH

DOWN

UP

MOTORCYCLE

MOTORCYCLE

STAIRWELL

PCS04

PARKING

PC01

SUMP

00-C-3

OTHER SPACE

PCM17

FAN RM

00-C-2

STORAGE

PC14

STORAGE

00C6

MECH

RM

PC15

STORAGE

PC16

ELEVATOR

LOBBY

PC02

STAIR

PCS05

STORAGE

PC05

STORAGE

PC09

MECH RM

PC10

TC

00-D-3

EC

00-D-2

STAIR

PCS06

FAN RM

00-D-1

OTHER

SPACE

PCM11

FF:CONCRETE

FF:CONCRETE

FF:VCT FF:CONCRETE FF:CONCRETE

FF:CONCRETE

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:CONCRETE

FF:VCT

FF:VCT

FF:CONCRETE

FF:CONCRETE

FF:CONCRETE

FF:CONCRETE

FF:VCT

P

M

PARKING GARAGE FLOOR PLAN

AND ENLARGED PLANS

KC JJG

A-102

ELEVATOR LEVEL C - PARKING GARAGE

SCALE:1/16" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Dwg. of

17-274

ACG Project Number

FULLY SPRINKLERED

Engineers Architects

BID DOCUMENTS

08/10/2020

MAIN BLDG

UPGRADE ELEVATORS P4, P5,

S6, AND S7

596A4-18-103

LEXINGTON, KY 40502

Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420

Elevator Consultant:

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

N

AREA OF WORK

WITHIN BUILDING #1

N

AREA OF WORK

WITHIN BUILDING #1

BID DOCUMENTS

S6, S7

P4, P5

2 5

P4 & P5 TRANSFORMER & SWITCHGEAR / MECH ROOM ENLARGED PLAN

SCALE:3/16" = 1'-0"

TRANSFORMER & SWITCHGEAR / MECH ROOM ENLARGED PLAN - GROUND FLOOR

SCALE:3/16" = 1'-0"

ELEV

P05

ELEV

P04

ELEV

EQUIP

00-C-1

A-102

EMERGENCY

GENERATOR

D003

TRANSFORMER &

SWITCHGEAR

D003A

MECH RM

D-B038

ELEV

P05

ELEV

P04

ELEV

EQUIP

00-C-1

GENERAL CONTRACTOR TO THOROUGHLY CLEAN

FLOOR IN ELEVATOR MECHANICAL ROOM BEFORE NEW

EQUIPMENT IS PLACED

11296

R E G

I

S

T

E

R

E D A

R

C

H

I

T

E

C

T

N

O

R

R

O

L

I

N

A

J

E

F

F

R

E

Y

A

B

R

O

O

K

S

R

A

L

E

I

G

R

O

L

I

N

A

DocuSign Envelope ID: 33FE4D5E-9D7F-48C9-B1D9-935AF5515DE0

8/7/2020

AutoCAD SHX Text

NORTH

TYPICAL PASSENGER CAB

(F.V.)

SEE NOTE 1

F

V

S E

E

N

O T

E

COORDINATE FUTURE

SECURITY CAMERA

LOCATION WITH VA

COR AND SAFETY

EXISTING CEILING

TO REMAIN

PROVIDE NEW LED

LIGHTING IN EXISTING

S.S. HOUSING. SEE

ELEVATOR

SPECIFICATION FOR

MORE INFORMATION

STAINLESS STEEL

FRONT PANEL PER

SPECIFICATIONS

ALL CONTROLS TO BE MFR

STANDARD AS SPECIFIED

AND REQUIRE ADA

EXISTING BASE

TO REMAIN

6'-1 1/2"

LED LIGHTS

- CENTER IN PANELS

AS INDICATED - SEE

ELEC. DWG.

EXISTING CEILING

TO REMAIN

NEW COMPLETE

DOORS & ACTUATORS

- SEE SPECS.

CAB AT OPPOSITE DOOR SIDE ELEVATION

FIELD VERIFY CAB DIMENSIONS

EXISTING WALLS TO

REMAIN

EXISTING HAND RAILS

TO REMAIN

EXISTING BUMPER

RAIL AND BASE TO

REMAIN

CAB AT DOOR SIDE ELEVATION

FIELD VERIFY CAB DIMENSIONS

ELEVATOR

DOOR

SIDE

VA INTERIOR

DEPARTMENT TO

PROVIDE

DIRECTORY SIGN

ALL CONTROLS TO

BE MFR STANDARD

AS SPECIFIED AND

REQUIRE ADA

DOOR

SIDE

EXISTING WALLS TO REMAIN

8'-1 1/2"8'-1 1/2"

PROVIDE NEW LED

LIGHTING IN EXISTING

S.S. HOUSING. SEE

ELEC.DWG. FOR

MORE INFORMATION

EXISTING CEILING

TO REMAIN

PROVIDE NEW LED

LIGHTING IN EXISTING

S.S. HOUSING. SEE

ELEC.DWG. FOR

MORE INFORMATION

EXISTING CEILING

TO REMAIN

EXISTING WALLS TO

REMAIN

EXISTING HAND RAILS

TO REMAIN

EXISTING BUMPER RAIL

AND BASE TO REMAIN

EXISTING WALLS TO REMAIN

6'-0 7/16"

LED LIGHTS

- CENTER IN PANELS

AS INDICATED - SEE

ELEC. DWG.

EXISTING CEILING

TO REMAIN

PROVIDE LVT

FLOORING. 6"

NOMINAL WIDTH:

SHAW PATCRAFT /

TIMBER GROVE II /

00775 BOXWOOD

PASSENGER ELEVATORS CAB FINISH SCHEDULE:

CEILINGS TO REMAIN. RE-LAMP EXISTING LIGHT FIXTURES WITH LED LIGHTING.

EXISTING TO REMAIN.

FLOORS TO BE SHAW PATCRAFT; TIMBER GROVE II; STYLE: 1438V; 30 MIL

COLOR: 00775 BOXWOOD; SIZE: 5.96 X 48" X .118" THICK (GLUE DOWN).

ALL DOORS TO BE SS ON BOTH SIDES. RE-LABEL ALL DOORS WITH SAME

SIGNAGE AS EXISTING FROM 290 SIGN COMPANY

STAINLESS STEEL RAIL TYPE BASE SLOPED 6" FROM WALL TO FLOOR.

3" WIDE S.S. HANDRAIL AND GUARDRAILS. SEE ELEVATIONS.

CEILING:

WALLS:

FLOOR:

DOORS:

BASE:

HANDRAILS:

P

M

PASSENGER ELEVATOR CAB INTERIOR

ELEVATIONS

KC JJG

A-201

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Dwg. of

17-274

ACG Project Number

FULLY SPRINKLERED

Engineers Architects

BID DOCUMENTS

08/10/2020

MAIN BLDG

UPGRADE ELEVATORS P4, P5,

S6, AND S7

596A4-18-103

LEXINGTON, KY 40502

Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420

Elevator Consultant:

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

N

AREA OF WORK

WITHIN BUILDING #1

N

AREA OF WORK

WITHIN BUILDING #1

BID DOCUMENTS

S6, S7

P4, P5

3 5

CAR REAR ELEVATIONS

SCALE: 3/4" = 1'-0"

CAR CEILING PLAN

SCALE: 3/4" = 1'-0"

CAR FRONT ELEVATION

SCALE: 3/4" = 1'-0"

LEFT SIDE ELEVATIONS

SCALE: 3/4" = 1'-0"

CAR FLOOR TILE PLAN

SCALE: 3/4" = 1'-0"

CAR RIGHT SIDE ELEVATIONS - P4, P5

SCALE: 3/4" = 1'-0"

ELEVATOR

P4 & P5

Replace Ceiling

(1)

1A

Replace Walls

(2)

NO - SEE 1A

Replace Flooring

(3)

YES

Replace Doors

(4)

YES

Replace Handrails

(5)

NO - EXISTING TO REMAIN

1. CEILING- N/A.

1A. THE GARAGE ELEVATORS ARE CURRENTLY CLAD WITH SS WALLS - RE-LAMP WITH LED SOFFIT IN ORDER TO KEEP SS WALLS IN TACT.

11296

R E

G

I

S

T

E

R

E

D A

R

C

H

I

T

E

C

T

N

O

R

R

O

L

I

N

A

J

E

F

F

R

E

Y

A

B

R

O

O

K

S

R

A

L

E

I

G

R

O

L

I

N

A

SIX LED DOWNLIGHTS WITH BRUSHED STAINLESS PANELS AND CONCEALED ACCESS PANEL - S6 & S7

ELEVATOR S7: EXISTING WALLS TO REMAIN

ELEVATOR S6: BRUSHED STAINLESS STEEL WAINSCOT W/ WOOD VENEERING ON UPPER PORTION W/ MIRROR POLISHED STAINLESS STEEL REVEALS. BACK WALL PANEL TO HAVE IMPRINT OF EACH SERVICE BRANCH INSIGNIA IN HONORING THE SERVICE. BRANCHES INCLUDE US AIR FORCE, ARMY, US MARINE CORPS, AND NAVY. OBTAIN FINAL IMAGE APPROVAL FROM THE VA INTERIOR DEPARTMENT.

EXISTING FLOORING TO REMAIN.

ALL DOORS TO BE SS ON BOTH SIDES. RE-LABEL ALL DOORS WITH SAME SIGNAGE AS EXISTING FROM 290 SIGN COMPANY

STAINLESS STEEL RAIL TYPE BASE SLOPED 3" FROM WALL TO FLOOR.

3" WIDE S.S. HANDRAIL AND GUARDRAILS. SEE ELEVATIONS.

CEILING:

WALLS:

FLOOR:

DOOR:

BASE:

HANDRAILS:

SERVICE ELEVATORS CAB FINISH SCHEDULE:

CAB RIGHT AND LEFT SIDE

ELEVATION

NEW STAINLESS

STEEL CAB LINING

- (ELEVATOR S6)

NEW STAINLESS STEEL

3" HANDRAILS

NEW STAINLESS STEEL

WALL PANEL

CAB REAR ELEVATION CAB FRONT ELEVATION

NEW STAINLESS

STEEL CAB LINING

- (ELEVATOR S6)

NEW STAINLESS STEEL

3" HANDRAILS

NEW STAINLESS STEEL

WALL PANEL

ALL CONTROLS TO BE

MFR STANDARD AS

SPECIFIED AND

REQUIRED BY ADA

NEW STAINLESS

STEEL BASE

NEW STAINLESS

STEEL BASE

7'-8 1/2" 0"6'-4 1/2" 0" 7'-8 1/2" 0"

EXISTING WALLS

TO REMAIN

- (ELEVATOR S7)

EXISTING WALLS

TO REMAIN

- (ELEVATOR S7)

NOTE: DIMENSION ARE PROXIMATE - GC TO VERIFY

PROVIDE NEW LED

LIGHTING IN EXISTING

S.S. HOUSING. SEE ELEV.

SPECIFICATION FOR

MORE INFORMATION -

(ELEVATOR S7 ONLY)

NEW COMPLETE

DOORS & ACTUATORS

- SEE SPECS.

LED LIGHTS

-CENTER IN PANELS

AS INDICATED

TYPICAL SERVICE CAB

SUSPENDED METAL

CEILING

FIELD VERIFY HIGH

CEILING & CEILING

ACCESS DOOR

EQ

1'-4 1/4"

EQ

1'-4 1/4"

1'-4 1/4"

EQ 2' 0" EQ2' 0" 2' 0"

EXISTING FLOORING

TO REMAIN

P

M

SERVICE ELEVATOR CAB INTERIOR

ELEVATIONS

JAB JJG

SHEET NOTES

A-202

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Dwg. of

17-274

ACG Project Number

FULLY SPRINKLERED

Engineers Architects

BID DOCUMENTS

08/10/2020

MAIN BLDG

UPGRADE ELEVATORS P4, P5,

S6, AND S7

596A4-18-103

LEXINGTON, KY 40502

Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420

Elevator Consultant:

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

N

AREA OF WORK

WITHIN BUILDING #1

N

AREA OF WORK

WITHIN BUILDING #1

BID DOCUMENTS

S6, S7

P4, P5

INTERIOR ELEVATIONS - SERVICE ELEVATORS - S6, S7

SCALE: 3/4" = 1'-0"

CEILING PLAN S6 & S7

SCALE: NTS

FLOOR PLAN

SCALE: NTS

4 5

LOCATE PIT LADDERS IN EXISTING LOCATION

A

ELEVATOR

S6 & S7

Replace Ceiling

(1)

Replace Walls

(2)

S6 ONLY

Replace Flooring

(3)

NO

Replace Doors

(4)

YES

Replace Handrails

(5)

YES

1. CEILING- REPLACE CEILING IN BOTH ELEVATORS S6 & S7. SEE DETAIL 3/A-202.

2. WALLS- WHEREVER THE EXISTING HANDRAILS ARE REMOVED AND REPLACED REQUIRE NEW WALL PANELS - UNLESS EXISTING HOLES CAN BE REUSED FOR HANDRAIL

ATTACHMENT

- VERIFY WHETHER EXISTING HOLES CAN BE REUSED WITH C.O.R. -

11296

R E G

I

S

T

E

R

E

D A

R

C

H

I

T

E

C

T

N

O

R

R

O

L

I

N

A

J

E

F

F

R

E

Y

A

B

R

O

O

K

S

R

A

L

E

I

G

R

O

L

I

N

A

3RD LEVEL PARKING

2ND LEVEL PARKING

1ST LEVEL PARKING

1ST FLOOR

3RD LEVEL PARKING

2ND LEVEL PARKING

GROUND FLOOR

1ST FLOOR

BUILDING 1A

PASSENGER ELEV. 4 FLOORS (2)

P-4, P-5

(HYDRAULICS)

BUILDING 1A

SERVICE ELEV. 5 FLOORS (2)

S-6, S-7

(TRACTIONS)

1 2

2ND FLOOR

3RD FLOOR

4TH FLOOR

PENTHOUSE

MACH.

RM. FL.

TOP FOOTING

PIT

P

M

ELEVATOR RISER DIAGRAM

JAB

SHEET NOTES

A-400

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Dwg. of

17-274

ACG Project Number

FULLY SPRINKLERED

Engineers Architects

BID DOCUMENTS

08/10/2020

MAIN BLDG

UPGRADE ELEVATORS P4, P5,

S6, AND S7

596A4-18-103

LEXINGTON, KY 40502

Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420

Elevator Consultant:

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

N

AREA OF WORK

WITHIN BUILDING #1

N

AREA OF WORK

WITHIN BUILDING #1

BID DOCUMENTS

S6, S7

P4, P5

ELEVATOR RISER DIAGRAM

N.T.S.

5 5ANP

SEE ELECTRICAL SHEETS FOR SHAFT LIGHTING

LOCATIONS

A.

11296

R E G

I

S

T

E

R

E

D A

R

C

H

I

T

E

C

T

N

O

R

R

O

L

I

N

A

J

E

F

F

R

E

Y

A

B

R

O

O

K

S

R

A

L

E

I

G

R

O

L

I

N

A

DocuSign Envelope ID: 138874F2-128C-46CB-9ADE-FEB5196AEEEF

ELECTRICAL ABBREVIATIONS LIST

SS STAINLESS STEEL

SSW SELECTOR SWITCH

STD STANDARD

SURF SURFACE MOUNTED

SW SWITCH

SWBD SWITCHBOARD

SYM SYMMETRICAL

SYS SYSTEM

TC TIMECLOCK

TEL TELEPHONE

TEL/DATA TELEPHONE/DATA

TERM TERMINAL

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TR TAMPER RESISTANT

T-STAT THERMOSTAT

TTB TELEPHONE TERMINAL BOARD

TTC TELEPHONE TERMINAL

CABINET

TV TELEVISION

TYP TYPICAL

UC UNDER COUNTER

UE UNDERGROUND ELECTRICAL

UG UNDERGROUND

UH UNIT HEATER

UL UNDERWRITER'S LABORATORY

UT UNDERGROUND TELEPHONE

UTP UNSHIELDED TWISTED PAIR

UTIL UTILITY

UV UNIT VENTILATOR OR

ULTRAVIOLET

V VOLT

VA VOLT-AMPERES

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W WATT

W/ WITH

WH WATER HEATER

W/O WITHOUT

WP WEATHERPROOF

XFMR TRANSFORMER

XFR TRANSFER

ANGLE

@ AT

DELTA

' FEET

" INCHES

# NUMBER

Φ PHASE

C CENTER LINE

P PLATE

MTS MANUAL TRANSFER SWITCH

MTR MOTOR, MOTORIZED

NA NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION

NFDS NON-FUSED SAFETY DISCONNECT

SWITCH

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OH OVERHEAD

OL OVERLOAD

PA PUBLIC ADDRESS

PB PULL BOX OR PUSHBUTTON

PBPU PREFABRICATED BEDSIDE PATIENT

UNIT

PCB POLYCHLORINATED BYPHENYL

PC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PIV POST INDICATING VALVE

PNL PANEL

POE POWER-OVER-ETHERNET

PR PAIR

PRI PRIMARY

PROJ PROJECTION

PRV POWER ROOF VENTILATOR

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE (CONDUIT)

PWR POWER

QTY QUANTITY

RCP REFLECTED CEILING PLAN

RCPT RECEPTACLE

REQD REQUIRED

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

RTU ROOF TOP UNIT

SC SURFACE CONDUIT

SEC SECONDARY

SF SQUARE FEET/FOOT

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SIM SIMILAR

S/N SOLID NEUTRAL

SPEC SPECIFICATION

SPKR SPEAKER

SP SPARE

SR SURFACE RACEWAY

1P 1 POLE (2P, 3P, 4P, ETC.)

1PH 1 PHASE

2/C TWO-CONDUCTOR (3/C, 4/C, ETC.)

W2 TWO-WIRE (3W, 4W, ETC.)

3PH 3 PHASE

A AMPERE

AAP ALARM ANNUNCIATOR PANEL

AC ABOVE COUNTER

AIR CONDITIONER

ALTERNATING CURRENT

ACC ACCESSIBLE

ACLG ABOVE CEILING

ADO AUTOMATIC DOOR OPENER

A/E ARCHITECT/ENGINEER

AF AMP FRAME

AFC AVAILABLE FAULT CURRENT (KILOAMPS)

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFI ARC FAULT CIRCUIT INTERRUPTER

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AIC AMPERE INTERRUPTING CAPACITY

AL ALUMINUM

ALT ALTERNATE

AMP AMPERE

APPROX APPROXIMATELY

ARCH ARCHITECT, ARCHITECTURAL

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AWG AMERICAN WIRE GAUGE

BAS BUILDING AUTOMATION SYSTEM

BATT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISHED FLOOR

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM

BYP BYPASS

C CONDUIT

CAB CABINET

CALC CALCULATED

CAP CAPACITY

CAT CATALOG, CATEGORY

CATV COMMUNITY ANTENNA TELEVISION

CB CIRCUIT BREAKER

CCR CONTROL CONTACTOR

CCTV CLOSED CIRCUIT TELEVISION

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CF CONTRACTOR-FURNISHED

CKT CIRCUIT

CLG CEILING

COAX COAXIAL CABLE

COMM COMMUNICATION

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUATION OR CONTINUOUS

CONTR CONTRACTOR

COORDCOORDINATE

CPT CONTROL POWER TRANSFORMER

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CTR CENTER

CU COPPER

CU FT CUBIC FEET

dB DECIBEL

DB DIRECT BURIAL

DC DIRECT CURRENT

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLISH/DEMOLITION

DEPT DEPARTMENT

DIA DIAMETER

DISC DISCONNECT

DIST DISTRIBUTION

DN DOWN

DS SAFETY DISCONNECT SWITCH

DT DOUBLE THROW

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EG EQUIPMENT GROUND

ELEC ELECTRIC, ELECTRICAL

ELEV ELEVATOR

EM EMERGENCY

EMI ELECTROMAGNETIC INTERFERENCE

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

EPO EMERGENCY POWER OFF

EQUIP EQUIPMENT

ESMT EASEMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WALL HEATER

ELECTRIC WATER HEATER

EX EXISTING

EXP EXPLOSION PROOF

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FCU FAN COIL UNIT

FIXT FIXTURE

FLR FLOOR

FLUOR FLUORESCENT

FU FUSE

FUDS FUSED SAFETY DISCONNECT SWITCH

FVR FULL VOLTAGE REVERSING

FVNR FULL VOLTAGE NON-REVERSING

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR

GFI GROUND FAULT CIRCUIT INTERRUPTER

GND GROUND

GRS GALVANIZED RIGID STEEL (CONDUIT)

GYP BDGYPSUM BOARD

HID HIGH-INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HTR HEATER

HV HIGH VOLTAGE

HVAC HEATING, VENTILATING AND AIR

CONDITIONING

IES ILLUMINATION ENGINEERING SOCIETY

IG ISOLATED GROUND

IMC INTERMEDIATE METAL CONDUIT

IR INFRARED

I/W INTERLOCK WITH

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT-AMPERE

KVAR KILOVOLT-AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

LED LIGHT-EMITTING DIODE

LF LINEAR FEET/FOOT

LM LUMEN

LRA LOCKED ROTOR AMPS

LT LIGHT

LTG LIGHTING

LTNG LIGHTNING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

METAL-CLAD (CONDUIT)

MCA MINIMUM CIRCUIT AMPACITY

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MFR MANUFACTURER

MFS MAIN FUSED DISCONNECT SWITCH

MH MANHOLE

MIC MICROPHONE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MOA MULTIOUTLET ASSEMBLY

MSBD MAIN SWITCHBOARD

MT MOUNT

MVOLT MULTIVOLT

A1 b

E1 c d

T1

'LPN'

ELECTRICAL SYMBOL NOTES

THE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER OR AN UPPER

CASE LETTER AND NUMBER.

THE SWITCH DESIGNATION (IF NEEDED) IS INDICATED BY A LOWER CASE LETTER.

EXAMPLE: LIGHTING FIXTURE TYPE 'A1' IS CONTROLLED BY SWITCH 'b'.

EXIT SIGNS: STEM INDICATES WALL MOUNTING. NO STEM INDICATES CEILING

MOUNTING. SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES

DIRECTIONAL ARROW ON ILLUMINATED FACE(S).

DEVICES: THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

TRANSFORMERS: THE TRANSFORMER TYPE IS INDICATED BY A NUMBER

FOLLOWING THE UPPER CASE LETTER 'T'. SEE THE TRANSFORMER SCHEDULE OR

THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER DESCRIPTION AND

REQUIREMENTS.

PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING

SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR

DESIGNATION CODES.

SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE

NUMBER INDICATED IN THE HEXAGON.

HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT

DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.

CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL

SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.

SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE

A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.

'LPN'-1,3,5

EXAMPLE 1: WALL MOUNTED EXIT SIGN TYPE 'E1' WITH SINGLE FACE

AND DIRECTIONAL ARROW.

EXAMPLE 2: CEILING MOUNTED EXIT SIGN TYPE 'E2' WITH DOUBLE

FACE AND DIRECTIONAL ARROWS.

E2

EXAMPLE: SPLIT DUPLEX RECEPTACLE; ONE RECEPTACLE OUTLET IS

CONTROLLED BY SWITCH 'c'.

EXAMPLE: SINGLE POLE SWITCH 'd' TO CONTROL LIGHTING

FIXTURES INDICATED BY 'd'.

EXAMPLE: TRANSFORMER TYPE 'T1'.

EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.

DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE

NOTE NUMBER INDICATED IN THE SQUARE.

GENERAL ELECTRICAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN

ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED

PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND

WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND VA STANDARDS.

PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE

BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL

PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE

WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND

THE APPLICABLE BUILDING CODES.

VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED

MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.

PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.

BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.

COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO

AVOID CONFLICT DURING CONSTRUCTION.

ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND

ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR

SPARE, OR SPACE.

MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO

INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR

MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE

ACCEPTED. ALL PRODUCTS MUST COMPLY WITH "BUY AMERICAN ACT".

ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR

EQUIPMENT MANUFACTURER'S SPECIFICATIONS.

CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE

DEVICE'S SCREW TERMINALS.

MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT

UNLESS NOTED OTHERWISE.

ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.

ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.

ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON

VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND

CONDUIT OR WHERE CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE,

LFMC CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.

ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN

APPROVED THIRD PARTY TESTING AGENCY.

FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE

SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC

PROTECTIVE MEASURES DISABLE THE LED LAMPS. PROVIDE A LETTER OR STATEMENT FROM THE

MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT

BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY.

PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.

IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE

BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS

DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.

COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.

J

ELECTRICAL SYMBOL LEGEND

120V DUPLEX RECEPTACLE

RECEPTACLE MODIFIERS:

AC: 3" ABOVE COUNTERTOP/BACKSPLASH

GFI: GROUND FAULT CURRENT INTERRUPTER

WP: WEATHERPROOF ENCLOSURE

DED: DEDICATED CIRCUIT

120V DUPLEX RECEPTACLE EMERGENCY OUTLET

AND COVER PLATE SHALL BE RED IN COLOR

120V QUADRUPLEX RECEPTACLE

120V QUADRUPLEX RECEPTACLE EMERGENCY

OUTLET AND COVER PLATE SHALL BE RED IN COLOR

JUNCTION BOX, PURPOSE AS NOTED

DISCONNECT SWITCH NON-FUSED

DISCONNECT SWITCH FUSED

SINGLE POLE WALL SWITCH: 48" AFF STANDARD UNO

SYMBOL HEIGHT DESCRIPTION

18"

18"

18"

18"

AS

NOTED

72" TOP

72" TOP

SWITCH MODIFIERS:

M: MOTOR-RATED

48"

ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.

TOP: HEIGHT TO TOP OF DEVICE

ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE LISTED HERE.

SPECIAL RECEPTACLE

EQUIPMENT CONNECTION

AS

NOTED

E

208V DUPLEX RECEPTACLE18"

18"

STRIP LIGHT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Dwg. of

17-274

ACG Project Number

Engineers Architects M101

BID DOCUMENTS

08/10/2020

MAIN BLDG

UPGRADE ELEVATORS P4, P5,

S6, AND S7

596A4-18-103

LEXINGTON, KY 40502

Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420

Elevator Consultant:

BID DOCUMENTS

FULLY SPRINKLERED

ELECTRICAL GENERAL NOTES, SYMBOL

LEGENDS, ABBREVIATIONS, AND

SCHEDULES

JKM NJ

E-001

1 7

LIGHT FIXTURE SCHEDULE

SYMBOL LABEL

TYPE OF

LAMP

BALLAST/

DRIVER

WATTS/

FIXTURE

VOLTAGE DESCRIPTION

BASIS OF DESIGN

MANUFACTURER/CATALOG NUMBER

OR A

LED; 4000

LUMENS;

80 CRI;

3500K

ELECTRONIC 42 MVOLT

4' LINEAR SURFACE MOUNTED EXTREME ENVIRONMENT LED

ELEVATOR PIT LIGHT; WITH RIBBED FROSTED ACRYLIC LENS;

ENCLOSED AND GASKETED; WET LOCATION; MVOLT

COLUMBIA LIGHTING MODEL #

LXEM4-40LW-RFA-EU

OR APPROVED EQUIVALENT

B

LED; 4600

LUMENS;

80 CRI;

3500K

ELECTRONIC 41 MVOLT

4' LINEAR LED STRIPLIGHT WITH LENS; SUSPENDED FROM

STRUCTURE WITH ALL THREAD; DLC QUALIFIED; INSTALLED

HEIGHT OF 9'-0" AFF. MVOLT.

METALUX MODEL #

4SNLED-LD4-46SL-LN-UNV-L840-CD1-U

OR APPROVED EQUIVALENT

NOTES:

1. MANUFACTURER AND CATALOG NUMBERS SHOWN ARE FOR BASIS OF DESIGN, DESCRIPTIVE AND QUALITY STANDARDS ONLY, NOT TO BE USED FOR ORDERING WITHOUT VERIFICATION AND

APPROVAL. CONTRACTOR TO PROVIDE PRODUCT OR EQUAL FOR APPROVAL BY OWNER, ARCHITECT AND ENGINEER. ENGINEER SHALL NOT BE RESPONSIBLE FOR MISMATCHED OR INACCURATE

PART NUMBERS.

2. EM - SWITCHED EMERGENCY LIGHT (CIRCUITED FROM NORMAL AND EMERGENCY BACK-UP POWER)

EM NL - UN-SWITCHED EMERGENCY LIGHT (CIRCUITED FROM EMERGENCY POWER)

3. VERIFY ALL LIGHT FIXTURE MOUNTING TYPES AND COLORS WITH ARCHITECT.

4. FOR ALL LED LIGHT FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC

PROTECTIVE MEASURES DISABLE THE LED LAMPS. PROVIDE A LETTER OR STATEMENT FROM THE MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT

BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY. PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.

DocuSign Envelope ID: D4321D85-CDC5-46A0-B8A1-1D1ACD76F467

MECH

RM

PC15

STORAGE

PC16

ELEVATOR

LOBBY

PC02

ELEVATOR

PCE05

ELEVATOR

PCE04

ELEV

EQUIP

00-C-1

P5

P4

(TYP)

LPE3 PPE3

4 4

S6

S7

RAIL

(TYP)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date: Dwg. of

17-274

ACG Project Number

Engineers Architects M101

BID DOCUMENTS

08/10/2020

MAIN BLDG

UPGRADE ELEVATORS P4, P5,

S6, AND S7

596A4-18-103

LEXINGTON, KY 40502

Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420

Elevator Consultant:

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

N

AREA OF WORK

WITHIN BUILDING #1

N

AREA OF WORK

WITHIN BUILDING #1

BID DOCUMENTS

S6, S7

P4, P5

FULLY SPRINKLERED

ELECTRICAL DEMOLITION PLANS

JKM NJ

ED101

A. EQUIPMENT SHOWN IS INDICATIVE OF THE

ITEMS EXISTING, HOWEVER SOME ITEMS MAY

HAVE BEEN CONCEALED DURING THE

SURVEY. THE CONTRACTOR SHALL VISIT THE

SITE PRIOR TO THE BID TO VERIFY THE

EXTENT OF THE DEMOLITION, AND SHALL

FIELD VERIFY THE TOTALITY OF THE

EQUIPMENT INDICATED.

B. CONTRACTOR SHALL BE RESPONSIBLE FOR

TRACING AND IDENTIFYING ALL CIRCUITS AND

CONDUITS THAT ORIGINATE, PASS THROUGH,

OR TERMINATE IN THE AREA OF WORK.

DEMOLISH ALL CIRCUITS THAT ARE NO

LONGER IN USE. MAINTAIN CIRCUIT

CONTINUITY TO ALL CIRCUITS WHICH ARE NOT

COMPLETELY REMOVED.

C. CONTRACTOR TO DISCONNECT AND REMOVE

ELECTRICAL CONNECTION TO OUTLETS,

RECEPTACLES, HVAC EQUIPMENT AND OTHER

ELECTRICAL DEVICES. REMOVE CONDUCTORS

AND CONDUIT BACK TO PANELBOARD

SERVING EQUIPMENT OR TO THE POINT

WHERE OTHER REMAINING LOADS ARE

CONNECTED. UPDATE AFFECTED PANEL

DIRECTORIES TO INDICATE ANY REMAINING

LOADS OR LABEL CIRCUITS "SPARE (UNUSED)"

AS APPLICABLE.

D. CONTRACTOR SHALL REMOVE ALL

ELECTRICAL CONDUIT, CABLE,…