Copy of eCMS Line Item Template - updated version 1.1.xlsx

XLSX spreadsheet 62 KB Posted

Attached to
596-21-1-5848-0001- 596A4-18-103- Upgrade Elevators P4, P5, S6, & S7 TBC
Solicitation number
36C24921R0124
Issued by

About this file

This document contains a template for a federal contract price breakdown proposal and information on a related solicitation opportunity. The template outlines a detailed structure for contractors to provide unit pricing for various construction divisions and subdivisions for a fictional elevator upgrade project. Contractors are instructed to utilize a similar level of itemization in their proposals, listing prices for labor, materials, equipment, taxes and other costs. The related solicitation is for project number 596A4-18-103 to upgrade elevators P4, P5, S6 and S7 at an unspecified VA medical center, issued under solicitation number 36C24921R0124 by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. No further details are provided on required products or services, response deadlines or award timing.

View the file

Other files

File Type Posted
36C24921R0124 0002.docx DOCX document
Pit Ladder Detail.pdf PDF
Attestation Guidance for Health and Safety Precautions for COVID-19.pdf PDF
Solicitation RFIs_596A4-18-103.pdf PDF
Current COVID-19 Workplace Safety Requirements.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
36C24921R0124 0001.docx DOCX document
Wage Determination KY20210090 3-5-2021.pdf PDF
Statement of Work.pdf PDF
P12 Project Drawings.pdf PDF
Past Performance Questionnaire.pdf PDF
P12 Project Drawings (1).pdf PDF
P12 Project Specifications.pdf PDF
36C24921R0124_1.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown

JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900Solicitation NumberProject NumberProject TitleProposal Date
36C24921R0124596A4-18-103Upgrade Elevators P4 P5 S6 S79/20/21

SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS

DIVISION 1GENERAL REQUIREMENTS$0.00
01 32 16.15Project Schedules
01 33 23Shop Drawings, Prdt Data, Samples
01 35 26Safety Requirements
01 42 19Reference Standards
01 45 29Testing Laboratory Services
01 57 19Temporary Environment Controls
01 58 16Temporary Interior Signage
01 74 19Cosntruction Waste Management
01 81 13Sustainable Construction Requirements
01 91 00General Commissioning Requirements
DIVISION 2Existing Conditions$0.00
02 41 00Demolition
02 82 11Traditional Asbestos Abatement
DIVISION 3CONCRETE$0.00
03 30 53Cast in Place Concrete
DIVISION 4MASONRY
DIVISION 5Metals$0.00
05 50 00Metal Fabrications
DIVISION 6Wood, plastics and Composites$0.00
06 10 00Rough Carpentry
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 01 50.19Preparation fro Reroofing
07 60 00Flashing and Sheet Metal
07 71 00Roof Specialties
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
07 95 13Expansion Joint Cover Assemblies
DIVISION 8Openings$0.00
08 11 13Hollow Metal Doors & Frames
08 14 00Interior Wood Doors
08 31 13Access Doors and Frames
08 41 13Alum Framed Entrance and Storefronts
08 56 19Pass Windows (2 each)
08 71 00Door Hardware
08 80 00Glazing
08 90 00Louvers and Vents
DIVISION 9FINISHES$0.00
09 05 16Subsurface Prep for Floor Finishing
09 06 00Schedule for Finishes
09 22 16Non Struct Metal Framing
09 29 00Gypsum Board
09 51 00Acuoutical Ceiling
09 65 13Resilient Base and Accessories
09 68 00Resilient Tile Flooring
09 69 00Access Flooring
09 91 00Painting
DIVISION 10Specialties$0.00
10 11 13Chalkboards and Markerboards
10 1123Tackboards
10 14 00Signage
10 21 13Toilet Compartments
10 26 00Wall and Door protection
10 28 00Toilet, Bath, and Laundry Accessories
10 44 13Fire Extinguisher Cabinets
DIVISION 11EQUIPMENT$0.00
11 41 21Walk-in Coolers and Freezers
11 53 53Biological Safety Cabinets Laminar Airflow Stations
DIVISION 12Furnishings$0.00
12 24 00Window Shades
12 24 21Lightproof Shades
12 31 00Manufactured Metal Casework
12 32 00Manufactured Wood Casework
12 36 00Countertops
DIVISION 13Special Construction$0.00
13 05 41Seismic Restraint Requirements for Non- Structural Components
DIVISION 21Fire Suppression$0.00
21 08 00Commissioning of Fire Suppression System
21 13 13Wet-Pipe Sprinkler Systems
DIVISION 22Plumbing$0.00
22 05 11Common Work Results for Plumbing
22 05 19Meters and Gages for Plumbing piping
22 05 23General-Duty Valves for Plumbing Piping
22 07 11Plumbing Insulation
22 08 00Commissioning of Plumbing Systems
22 11 00Facility Water Distribution
22 13 00Facility Sanitary and Vent Piping
22 14 00Facility Storm Drainage
22 40 00Plumbing Fixtures
22 62 00Vacuum Systems for Laboratory and Healthcare Facilities
22 63 00Gas Systems for Laboratory and Healthcare Facilities
DIVISION 23Heating, Ventilating and Air Conditioning HVAC$0.00
23 05 11Testing, Adjusting and Balancing for HVAC
23 05 12General Motor Requriments for HVAC and Steam Generation Equipment
23 05 41Noise and Vibration Control for HVAC piping and Equipment
23 05 93Testing, Adjusting and Balancing for HVAC
23 07 11HVAC and Boiler Plant Insulation
23 08 00Commissioning of HVAC Systems
23 09 23Direct Digital Control System for HVAC
23 21 13Hydronic Piping
23 21 23Hydronic Pumps
23 22 13Steam and Condensate Heating Piping
23 25 00HVAC Water Treatment
23 31 00HVAC Ducts and Casing
23 34 00HVAC Fans
23 36 00Air Terminal Units
23 37 00Air Outlets and Inlets
23 40 00HVAC Air Cleaning Devices
23 74 13Packaged, Outdoor, Central Stating Air Handling Units
23 81 00Decentralized Unitary HVAC Equipment
23 81 23Computer Room Air Conditioners
23 82 00Convection Heating and Cooling Units
23 82 16Air Coils
23 84 00Humidity Control Equipment
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations
26 05 13Medium Voltage Cables
26 05 19Low Voltage Eelctrical Power Conductors and Cables
26 05 26Grounding and Bonding for Electrical Systems
26 05 33Raceway and Boxes for Electrical Systems
26 05 36Wireways for Radiology Equipment
26 05 73Overcurrent Protective Device Coordination Study
26 08 00Commissioning of Electrical Systems
26 09 23Lighting Controls
26 13 13Medium Voltage Circuit Breaker Switchgear
26 13 16Medium Voltage Fusible Interrupter Switches
26 20 11Isolated Power Systems
26 22 00Low Voltage Transformers
26 23 00Low Voltage Switchgear
26 24 13Distribution Switchboards
26 24 16Panelboards
26 24 19Motor Control Centers
26 25 11Busways
26 26 00Power Distribution units for Static Unterruptible Power Systems
26 27 26Wiring Devices
26 29 21Enclosed Switches and Circuit Breakers
26 33 53Static Unnterruptible Power Supply
26 35 26Harmonic Filters
26 36 23Automatic Transfer Switches
26 41 00Facility Lightning Protection
26 43 13Surge Protective Devices
26 51 00Interior lighting
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations
27 05 26Grounding and Bonding for Communications Systems
27 05 33Raceways and Boxes for Communication Systems
27 05 61Leased Space, Communication Equipment and Systems
27 08 00Commissioning of Communication Systems
27 10 00Control, Communication and Signal Wiring
27 11 00Communications Equipment Room Fittings
27 15 00Communications Structured Cabling
27 41 31Master Antenna Television Equipment and Systems
27 51 16Public Address and Mass Notification Systems
27 51 23Intercommunications and Program Systems
27 52 23Nurse Call and Code Blue Systems
27 52 41Miscellaneous Medical Systems
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 05 00Common Work Results for Electronic Safety and Security
28 05 13Conductors and Cables for Electronic Safety and Security
28 05 26Grounding and Bonding for Electronic Safety and Security
28 05 28.33Conduits and backboxes for Electonic Safety and Security
28 08 00Commissioning of Electronic Safety and Security Systems
28 13 00Physical Access Control System
28 13 16Physical Access Control Ssytem and Database Management
28 13 53Security Access Detection
28 16 00Intrusion Detection System
28 23 00Video Survelliance
28 26 00Electronic Personal Protection System
28 31 00Fire Detection and Alarm
28 52 31Emergency Call System
TOTALS
$0.00
TOTAL LABOR
$0.00
TOTAL MATERIALS
6%$0.00
TAX FOR MATERIALS
$0.00
TOTAL EQUIPMENT
DIVISION GRAND TOTALS$0.00
$0INSTRUCTIONS
DIVISION GRAND TOTALS$0
TAX FOR MATERIALS1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number;
SUBTOTAL$0
OVERHEAD5%$0
PROFIT5%$02. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree;
$0
SUBTOTAL
BOND/FEE2%$03. Divisions must still be listed even if not applicable to the construction requirement;
PERMITS/LICENSES

GRAND TOTAL $0 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and

5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9

File details come from the government source that posted it. Updated .