This is a Statement of Work for a De-Ionized Water System Service under Navy contract N00164-27-X-XXXX, dated 28 September 2026.

The contractor must provide two de-ionized water systems: a 3.6 cubic feet primary system and a 1.2 cubic feet secondary system. The primary system shall deliver water meeting modified ASTM Type III specifications to a 500-gallon storage tank serving a printed circuit board plating shop and an analytical control laboratory simultaneously. Water quality requirements for the storage tank include electrical conductivity of 0.25 µS/cm maximum, electrical resistivity of 4.0 MΩ-cm minimum, pH between 5 and 8, total organic carbon of 200 µg/L maximum, sodium of 10 µg/L maximum, chlorides of 10 µg/L maximum, total silica of 500 µg/L maximum, and final filtration of 10 µm minimum. The laboratory requires higher purity with electrical conductivity of 0.10 µS/cm maximum and electrical resistivity of 10.0 MΩ-cm minimum. The primary system shall continuously supply 8-10 gallons per minute at 30 psi and maintain 2-4 gallons per minute at 15-20 psi when both outlets demand water simultaneously. The system includes inlet filtration, pressure regulation, activated carbon filtration, anion and cation exchange columns, dual mixed bed columns, final filtration, and in-line water quality monitoring with user-selectable ranges from 20 KΩ to 10 MΩ. The footprint shall not exceed 30 square feet (10 feet by 3 feet). The secondary system supplies a 40-gallon water heater for a printed circuit card assembly batch cleaner using a 1.2 cubic feet mixed bed ion exchange column with identical monitoring capabilities. Both systems remain contractor property under lease arrangement. The contractor must perform quarterly filter replacement or as needed, semi-annual activated carbon replacement, quarterly or more frequent ion exchange regeneration off-site, maintain 24/7 emergency service availability, respond to service requests within 24 hours, and maintain adequate spare parts inventory.

View the file

Other files

File Type Posted
WH-1313 POSTER.pdf PDF
Solicitation - N0016427Q0001.pdf PDF
Wage Determination No._ 2015-4821, Revison 34.txt TXT text file
C07_Synopsis 27Q0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

28 SEPTEMBER 2026

DISTRIBUTION STATEMENT A. Approved for public release.

Statement of Work for De-Ionized Water System Service

N00164-27-X-XXXX

1 SCOPE

1.1 The De-Ionized (DI) water system will take raw potable tap water (average hardness ≈ 50 ppm, heavily contaminated with dissolved and particulate iron and sediment) and perform filtration and ion exchange to produce DI water for delivery to a storage tank and recirculating system that supplies DI water to a printed circuit board plating shop and to an analytical laboratory adjacent to the plating shop. A separate, smaller system will perform ion exchange to produce DI water for delivery to a printed circuit board batch cleaner system.

2 GENERAL REQUIREMENTS

3 SPECIFIC REQUIREMENTS

3.1 The 3.6 cubic feet system

3.1.1 The system shall deliver water to a 500 gallon HDPE storage tank used to supply the plating shop at a quality level that meets or exceeds the following specifications:*

3.1.1.1 Electrical conductivity shall be 0.25 µS/cm maximum at 25 °C.

3.1.1.2 Electrical resistivity shall be 4.0 MΩ-cm minimum at 25 °C.

3.1.1.3 The pH shall be a minimum of 5 and a maximum of 8.

3.1.1.4 Total organic carbon shall be a maximum of 200 µg/L.

3.1.1.5 Sodium shall be 10 µg/L maximum.

3.1.1.6 Chlorides shall be 10 µg/L maximum.

3.1.1.7 Total silica shall be 500 µg/L maximum.

3.1.1.8 Final filtration level shall be 10 µm minimum.

*These specifications are a modification of the requirements for ASTM Type III DI water.

See ASTM D1193-99 for details.

3.1.2 The system shall deliver water to the analytical control laboratory at a quality level that meets or exceeds the following specifications:*

3.1.2.1 Electrical conductivity shall be 0.10 µS/cm maximum at 25 °C.

3.1.2.2 Electrical resistivity shall be 10.0 MΩ-cm minimum at 25 °C.

3.1.2.3 The pH shall be a minimum of 5 and a maximum of 8.

3.1.2.4 Total organic carbon shall be a maximum of 200 µg/L.

3.1.2.5 Sodium shall be 10 µg/L maximum.

3.1.2.6 Chlorides shall be 10 µg/L maximum.

3.1.2.7 Total silica shall be 500 µg/L maximum.

3.1.2.8 Final filtration level shall be 10 µm minimum.

*These specifications are a modification of the requirements for ASTM Type III DI water.

See ASTM D1193-99 for details.

3.1.3 The system shall be of sufficient capacity and size to be capable of supplying DI water at the specified quality levels to the 500 gallon storage tank and the analytical control laboratory simultaneously.

3.1.4 The system shall consist of the following components:

3.1.4.1 A service DI unit which is leased from and remains the property of the selected

Contractor shall consist of:

3.1.4.1.1 Inlet filter to remove sediment and particulate iron from incoming tap water feed

3.1.4.1.2 Pressure regulator, if required, to reduce pressure as required by the system

3.1.4.1.3 Activated carbon filtration tank to remove chlorine and organics from tap water feed

3.1.4.1.4 Anion exchange column

3.1.4.1.5 Cation exchange column

3.1.4.1.6 Dual mixed bed anion cation exchange columns

3.1.4.1.7 Final filter, 5 micron recommended, 10 micron maximum

3.1.4.1.8 In-line product water quality monitoring device located near the outlet of the system

(typically a conductivity/resistivity meter) that is user selectable with water quality ranges from 20 KΩ to 10 MΩ.

3.1.4.1.9 See Figure 1 for typical design and layout

3.1.5 Plumbing Details

3.1.5.1 Inlet: Contractor shall provide any piping adaptations required to connect the system to the existing Tap Water In ¾” male threaded SCH80 PVC supply line.

3.1.5.1.1 Contractor shall provide all piping, tubing, and hardware connections within the system.

3.1.5.2 Outlet: Contractor shall provide any piping adaptations required to connect the system to the existing 1” female threaded SCH 80 PVC DI water distribution system.

3.1.6 Flow Rate

3.1.6.1 The system shall be able to continuously supply 8-10 gallons per minute at 30 psi of product water at the required purity level at the point of exit from the system until the system’s capability has been exhausted.

3.1.6.2 Flow rates into the DI storage tank and to the analytical laboratory shall not fall to less than 2-4 gallons per minute at 15-20 psi even if both the storage tank and laboratory are simultaneously demanding water from the system.

3.1.7 Footprint

3.1.7.1 The system shall not occupy more than 30 square feet, 10 feet by 3 feet, of floor space.

3.1.7.2 Wall mounted pressure regulators, filtration units, and flow meters are acceptable but all mounting brackets, reinforcements, special enclosures, and/or mounting hardware or modifications to the system to permit wall mounting shall be the Contractor’s responsibility.

3.1.8 Regeneration and System Maintenance

3.1.8.1 Contractor shall replace inlet and outlet filters quarterly or as required to maintain the minimum flow rates and water quality specified herein.

3.1.8.2 Replacement of activated carbon tank shall be performed semi-annually and regeneration of anion, cation, and mixed bed ion exchange columns shall be performed at least quarterly or more frequently if needed to maintain product water quality.

3.1.8.3 All regeneration operations, including all operations involving the use or disposal of hazardous materials shall be conducted off-site and shall be the Contractor’s exclusive responsibility.

3.1.8.4 Contractor shall have and maintain a 24 hour-a-day, 7-day-a-week, emergency service number.

3.1.8.5 Contractor shall respond to a service request within 24 hours after notification by the

Government that the system requires service or is producing water of insufficient purity.

3.1.8.6 Contractor shall maintain a sufficient inventory of replacement and spare parts to return system operation should the system fail to operate properly or require service.

3.2 The 1.2 cubic feet system

3.2.1 The system shall deliver water to a 40 gallon water heater used to supply a printed circuit card assembly batch cleaner system.

3.2.1.1 A DI unit which is leased from and remains the property of the selected Contractor shall consist of:

3.2.1.2 A 1.2 cubic feet mixed bed anion cation exchange column

3.2.1.3 In-line product water quality monitoring device located near the outlet of the system

(typically a conductivity/resistivity meter) that is user selectable with water quality ranges from 20 KΩ to 10 MΩ.

3.2.2 Plumbing Details

3.2.2.1 Inlet: Contractor shall provide any piping adaptations required to connect the system to the existing Tap Water In ¾” male threaded SCH80 PVC supply line.

3.2.2.2 Outlet: Contractor shall provide any piping adaptations required to connect the system to the existing ¾” female threaded SCH 80 PVC supply line to the water heater.

3.2.3 Regeneration and System Maintenance

3.2.3.1 Replacement of mixed bed ion exchange column shall be performed quarterly or as required to maintain minimum product water quality.

3.2.3.2 All regeneration operations, including all operations involving the use or disposal of hazardous materials shall be conducted off-site and shall be the Contractor’s exclusive responsibility.

3.2.3.3 Contractor shall have and maintain a 24 hour-a-day, 7-day-a-week, emergency service number.

3.2.3.4 Contractor shall respond to a service request within 24 hours after notification by the

Government that the system requires service or is producing water of insufficient purity.

3.2.3.5 Contractor shall maintain a sufficient inventory of replacement and spare parts to return system operation should the system fail to operate properly or require service.

F ig u re 1

- B lo ck D ia g ra m D

I S y stem

P la tin g

S h o p

F lo o r

T a p

W a te r In

C a rb o n

C a rb o n

A n io n C a tio n M ix e d

B d

M ix d

B d

F iltra tio n e tc

O n

/O ff

F ill

V a lv e

T e e

T o

L a b

S to ra g e T a n k

(5 g a l.)

P u m p

D .I. to

P la tin g

L in e s

P it F lo o r

S e rv ic e D

.I. U n it

[Type a quote from the document or the summary of an interesting point.

You can position the text box anywhere in the document. Use the

Drawing Tools tab to change the formatting of the pull quote text box.]

File details come from the government source that posted it. Updated .