This is a Statement of Work (SOW) for the repair of vent walls damaged by wind storm at USDA Building #30 located at 133 Tobacco Road, Tifton, Georgia 31793, under the USDA-ARS facility (Asset ID # 660200B0030).
The contractor must provide all equipment, labor, and materials necessary to deliver turnkey, completed work within 30 days from the Notice to Proceed. Primary deliverables include repair or replacement of vent wall panels to ensure integrity and operation; repair or replacement of vent wall motors, drive assemblies, mounting brackets, and mounting posts; provision of new mounting hardware; and verification of proper vent wall operation with existing Wadsworth Controllers. All work must comply with local, state, and federal codes and regulations and be performed by certified technicians. The contractor must submit a Site Safety Specific Plan/Accident Prevention Plan within 7 days of contract award that includes phone numbers and maps to local medical facilities. All contractor employees must hold 10-hour OSHA Construction Safety certification, with supervisors requiring 30-hour OSHA training. Standard contractor responsibilities include site supervision, daily worksite cleanup, debris removal and offsite disposal, minimizing impact on facility operations, maintaining contractor-provided restroom facilities and dumpster, obtaining security authorization and identification badges, and holding the Government harmless from liability. Work hours are scheduled 8 a.m. to 4:30 p.m., coinciding with Tifton location operations, with three days' advance notice required for alternative hours. Inspection and acceptance require a minimum 10-day advance written notice to the Contracting Officer, and any project damage caused by contractor activities must be repaired or replaced to Government satisfaction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFIs.pdf | ||
| Site Visit Sign-In 06172028.pdf | ||
| SF30 - Amendment 01.pdf | ||
| SF-1442.pdf | ||
| Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
USDA Building #30
Repair Vent Walls Damaged by Wind Storm Asset ID # 660200B0030
133 Tobacco Rd. Tifton, Ga 31793
USDA-ARS
Pictures
Statement of Work: Repair vent walls / structure, motors, and mounts damaged by wind storm.
Safety: The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 7 days of contract award. The Plan shall include phone numbers and maps to the local Dr. Office and nearest Hospital.
All employees of the general contractor or subcontractors shall have the 10- hour OSHA certified Construction Safety course and/or other relevant competency training. Supervisors shall have completed the 30-hour OSHA training.
Base Bid: Provide all equipment, labor, and materials necessary (including dumpster/container if applicable)
• Provide all quotes as turnkey completed work.
• Work shall be accomplished in accordance with all local, state, and federal codes and regulations.
• Work shall be accomplished by certified technicians.
• Repair/Replace vent wall panels ensuring integrity and operation.
• Repair/Replace vent wall motors, drive assembly, mounting brackets, mounting posts, etc to ensure vent wall operation.
• Provide new mounting hardware necessary.
• Verify proper operation of vent walls with existing Wadsworth Controllers.
Contractor Responsibility:
1. Contractor will verify all dimensions and site conditions prior to beginning work.
2. Contractor will perform the work as listed in the above outlined Base Bid.
3. Contractor shall keep work area clean daily and take measures to control debris while work is being performed.
4. Contractor is required to manage the project and consult with the Government prior to beginning all work phases and to work in a manner that minimizes the impact of the work on Government operations, research, and functions.
5. All work must be performed in such a manner as to not adversely affect daily operations of the facility, its workers, and the onsite facility operations.
6. Contractor must always have a Site Supervisor on the job while working on this project.
7. Contractor will provide their own restroom facility and dumpster.
8. Contractor will remove all demolished material and debris from the worksite and dispose offsite.
9. The Contractor shall confine all operations on Government premises to areas authorized or approved by the Contracting Specialist/Officer or Representative (CO/COR).
10. Employees of general contractor and subcontractors shall comply with ARS security management program, obtain permission from the CO/COR, be identified by project and employer by wearing contractor issued identification badges (if required) at all times on ARS property, and restricted from unauthorized access.
11. The Contractor shall hold and save the Government, its officers, and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
Material / Submittals:
The Contractor shall supply all materials necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material incorporated into the work, including shop drawings and specifications, used on this project shall be submitted to the Contract Specialist/Officer (CO) and Contracting Officer Representative (COR) as noted in this document. Electronic submittals are acceptable otherwise three written submittals are required.
Demolition Procedure:
1. Contractor will verify all dimensions and site conditions prior to beginning work.
2. Contractor will schedule the work between working hours as listed below.
3. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor.
4. Contractor will verify all dimensions and site conditions prior to beginning work.
5. Contractor will schedule the work between working hours as listed below.
6. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor.
7. The contractor shall always be responsible for protecting their work and ensuring the safety of their crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.
8. All items demolished shall become property of the Contractor and be removed by Contractor from ARS property.
9. Contractor shall follow all ARS EMS disposal criteria. Recyclable materials shall be recycled, and the savings shall be included in the contractor’s quote, therefore passed on to the government.
10. Contractor shall be responsible for providing disposal records where applicable.
Damage to Property:
Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.
Inspection and Acceptance:
A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 10 days in advance, in writing, to the Contracting Officer.
Project Schedule:
The completion of this project shall not exceed 30 days from date of Notice to Proceed. A request for time extension must be submitted to the Contracting Specialist/Officer in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
ARS reserves the right to close down or shut down the project site and order the Contractor’s employees off the premises in the event of a national emergency or Government shutdown. The Contractor may return to the site only with the written approval of the CO/COR
Work Hours:
Contractor’s working hours shall be scheduled to coincide with the working hours of the Tifton location which are 8 a.m. to 4:30 p.m. Should it be necessary to work hours other than the regular working hours, the contractor shall arrange for access to the area with the CO/COR three days prior to the need.
| Pictures |
| Material / Submittals: |
| Demolition Procedure: |
| Damage to Property: |
| Inspection and Acceptance: |
| Work Hours: |