RFIs.pdf

PDF 90 KB Posted

Attached to
Building 30 Greenhouse Repairs Federal contract opportunity
Solicitation number
1232SA26Q0760
Issued by
Department of Agriculture Agricultural Research Service

About this file

This is a Questions and Answers (Q&A) document for federal contract Solicitation 1232SA26Q0760, consisting of fourteen clarifying responses related to greenhouse ventilation system repair work at Building 30.

The Q&A addresses personnel staffing, project scheduling, environmental compliance, and equipment specifications. Key approvals include: a single individual may simultaneously serve as Superintendent, Site Safety and Health Officer, and Quality Control Manager; the period of performance may be extended post-award upon confirmation of material and equipment lead times; no asbestos or lead paint has been identified in Building 30; the contract is tax-exempt; no permitting is required; and contractors must submit a contract-specific QA/QC Plan. Regarding repair scope, vent wall panels, vent motors, drive assemblies, mounting posts, and mounting brackets may all be repaired and reused rather than replaced. Mounting posts are not required to be concreted in the ground, and landscaping restoration is limited to simple grading of disturbed areas only. The government will provide contractors full and unencumbered access to both the interior and exterior of greenhouse bays with damaged panels and complete access to the Wadsworth control system for testing and operation procedures. Site visit attendance documentation from June 17-18, 2026 has been posted as an attachment on sam.gov.

View the file

Other files for this federal contract opportunity

Other files attached to Building 30 Greenhouse Repairs, newest first.
File Type Posted
Site Visit Sign-In 06172028.pdf PDF
SF30 - Amendment 01.pdf PDF
Statement of Work.pdf PDF
SF-1442.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requests for Information Solicitation 1232SA26Q0760

Question 1: Can one person serve as Superintendent, Site Safety and Health Officer (SSHO), and Quality Control Manager simultaneously on this project?

Answer 1: Yes

Question 2: Given current market conditions and potential equipment lead times for the vent wall components, motors, and drive assemblies specified in the SOW, can the period of performance be extended after award once material and equipment lead times are confirmed?

Answer 2: Yes

Question 3: Can you please provide the site visit attendee sign in sheet from the June 17 and/or June 18, 2026 site visits?

Answer 3: Added as an attachment on sam.gov.

Question 4: Please confirm whether asbestos or lead paint is present anywhere on or within

Building 30, and if so, please provide the relevant testing documentation and abatement requirements.

Answer 4: None known.

Question 5: Is this contract tax exempt? If so, please provide the applicable tax exemption certificate or number.

Answer 5: Yes

Question 6: Is permitting required for this scope of work? If so, is the contractor responsible for obtaining all permits, and are permit fees to be included in the bid price?

Answer 6: No

Question 7: Is any landscaping restoration required upon project completion? For example, topsoil, seeding, or fertilizer in areas disturbed during the repair work.

Answer 7: Simple grading of disturbed area only.

Question 8: Are contractors required to issue a contract specific QA/QC Plan?

Answer 8: Yes

Question 9: If vent wall panels can be repaired and reused is this acceptable?

Answer 9: Yes

Question 10: If vent motors, drive assembly, and mounting posts can be repaired and reused is this acceptable?

Answer 10: Yes

Question 11: If mounting brackets can be repaired and reused is this acceptable?

Answer 11: Yes

Question 12: Are mounting posts required to be concreted in the ground?

Answer 12: No

Requests for Information Solicitation 1232SA26Q0760

Question 13: Will contractor have full and unencumbered access to inside and outside of greenhouse bays where panels are damaged?

Answer 13: Yes

Question 14: Will contractor have full and unencumbered access to Wadsworth control system for testing and operation procedures?

Answer 14: Yes