This is a Statement of Work for drought shelter repair and replacement services at the USDA Agricultural Research Service (ARS) facility in Tifton, Georgia.

The project requires contractors to replace three "Atlas Snow Arch" 30' x 84' drought shelters and repair seven additional structures damaged by Hurricane Helene at 226 William Gibbs Road, Tifton, GA 31793. The base bid must include all equipment, materials, labor, and hardware for a turn-key completed project. Work tasks include removal and disposal of damaged materials, assembly and installation of three new shelters, and repair of seven additional structures, all accomplished by certified technicians in accordance with local, state, and federal codes. The project completion deadline is 30 days from the Notice to Proceed, with any time extension requests requiring written justification submitted to the Contracting Officer. Working hours are Monday through Friday, 7:00 A.M. to 4:00 P.M., excluding Government holidays, and any schedule changes require written approval.

Contractor responsibilities include submitting a Site Safety Specific Plan/Accident Prevention Plan within seven days of award, with all employees requiring 10-hour OSHA certification and supervisors requiring 30-hour OSHA training. Contractors must verify dimensions and site conditions prior to work commencement, maintain daily site cleanliness, provide their own restroom facilities and dumpsters, remove all demolition debris off-site, and employ a foreman on-site at all times. Material submittals including shop drawings and specifications must be submitted to the Engineering Project Manager and Contracting Specialist. Contractors must utilize bio-based products to the maximum extent possible, follow ARS Environmental Management System disposal criteria with recyclable materials savings passed to the Government, and comply with ARS security management protocols. Inspection and acceptance of completed work requires 10 days' advance written notice to the Contracting Officer.

View the file

Other files for this federal contract opportunity

Other files attached to Drought Shelter Repairs and Replacement, newest first.
File Type Posted
SF30 - Amendment 01.pdf PDF
Site Visit Sign-In 05202026.pdf PDF
RFIs.pdf PDF
Site Visit Sign-In 05212026.pdf PDF
Wage Determination.pdf PDF
SF1442.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Drought Shelter Repair/Replacement

PP0000038563

PP0000038561

PP0000038562

USDA-ARS

Tifton, Georgia

Location Map

Statement of Work:

Replace (3) “Atlas Snow Arch” 30’ x 84’ Drought Shelters and repair (7) additional structures at ARS Tifton, GA. This project is located at 226 William Gibbs Road, Tifton, GA. 31793

Project Objective:

The objective of this project is to replace (3) Drought Shelters and repair (7) additional structures damaged by Hurricane Helene to bring the structures functioning capacity back to service, to better serve USDA CGBRU research mission goals.

Site Visit:

Bidders are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.

This project is located at USDA-ARS in Tifton, GA.

Utilization of Bio-Based Products:

The contractor shall utilize products and material based on bio-based materials, (e.g., bio-based greases; bio-based hydraulic fluids, bio-based absorbents), to the maximum extent possible without jeopardizing the intended end use of detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to the applicable Federal Specifications and Standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). Products can be found at: https://www.biopreferred.gov

Safety:

The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 7 days of contract award. The Plan shall include phone numbers and maps to the local Dr. Office and nearest Hospital.

All employees of the general contractor or subcontractors shall have the 10- hour OSHA certified Construction Safety course and/or other relevant competency training. Supervisors shall have completed the 30-hour OSHA training.

Base Bid:

Provide all equipment, materials, labor, and hardware necessary to replace (3) drought shelters and repair

(7) additional structures. Provide all quotes as turn-key completed work. The task list for this project is as follows:

• Work shall be accomplished in accordance with all local, state and federal codes and regulations.

• Work shall be accomplished by certified technicians.

• Remove and dispose of all damaged materials

• Assemble/Install 3 new 30’ x 84’ shelters

• Repair damages to 7 additional structures

Contractor Responsibility:

1. Contractor will verify all dimensions and site conditions prior to beginning work.

2. Contractor will perform the work as listed in the above outlined Base Bid.

3. Contractor shall keep work area clean daily and take measures to control debris while work is being performed.

4. Contractor is required to manage the project and consult with the Government prior to beginning all work phases. And, to work in a manner that minimizes the impact of the work on Government operations, research, and functions.

5. All work must be performed in such a manner as to not adversely affect daily operations of the facility, its workers, and the onsite facility operations.

6. Contractor must always have a Foreman on the job while working on this project.

7. Contractor will provide their own restroom facility and dumpster.

8. Contractor will remove all demolished material and debris from the worksite and dispose off-site.

9. The Contractor shall confine all operations on Government premises to areas authorized or approved by the Contracting Specialist/Officer or Representative (CO/COR).

10. Employees of general contractor and subcontractors shall comply with ARS security management program, obtain permission from the CO/COR, be identified by project and employer by wearing contractor issued identification badges (if always required) on ARS property, and restricted from unauthorized access.

https://www.biopreferred.gov/

11. The Contractor shall hold and save the Government, its officers, and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

12. Work shall be accomplished in accordance with all local, state, and federal codes and regulations.

13. Work shall be accomplished by certified technicians.

Material / Submittals:

The Contractor shall supply all materials necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material incorporated into the work, including shop drawings and specifications, used on this project shall be submitted to the Engineering Project Manager and Contracting Specialist as noted in this document. Electronic submittals are acceptable otherwise three written submittals are required.

Execution of Work:

Contractor will verify all dimensions and site conditions prior to beginning work. Contractor will schedule the work between working hours as listed below. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor. The contractor shall always be responsible for protecting his work and ensuring the safety of his crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.

Demolition Procedure:

1. Contractor will verify all dimensions and site conditions prior to beginning work.

2. Contractor will schedule the work between working hours as listed below.

3. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor.

4. The contractor shall always be responsible for protecting their work and ensuring the safety of their crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.

5. All items demolished shall become property of the Contractor and be removed by Contractor from ARS property. Contractor must provide dumpsters/ roll off containers.

6. Contractor shall follow all ARS EMS disposal criteria. Recyclable materials shall be recycled, and the savings shall be included in the contractor’s quote, therefore passed on to the government.

7. Contractor shall be responsible for providing disposal records where applicable.

Damage to Property:

Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.

Inspection and Acceptance:

A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 10 days in advance, in writing, to the Contracting Officer.

Project Schedule:

The completion of this project shall not exceed 30 days from date of Notice to Proceed. A request for time extension must be submitted to the Contracting Officer in writing. Each request must include specific and detailed reasons in support of the schedule alteration.

ARS reserves the right to close or shut down the project site and order the Contractor’s employees off the premises in the event of a national emergency or Government shutdown. The Contractor may return to the site only with the written approval of the CO/COR

Work Hours:

Contractor work hours shall be Monday through Friday, seven (7) A.M. to four (4) P.M. except for Government holidays. Any changes to work schedule shall be submitted to Contacting Officer for written approval.

Site Visit:
Bidders are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing firsthand any cond...
Contractor Responsibility:
Material / Submittals:
Execution of Work:
Demolition Procedure:
Damage to Property:
Inspection and Acceptance:
Project Schedule:
Work Hours: