This document is a Scope of Work (SOW) for fire suppression system inspections at Ozark National Scenic Riverways. The project requires a contractor to provide skilled labor, equipment, and supervision to inspect fire suppression systems at seven buildings across multiple locations, including Alley Spring Old Mill, Alley Spring Housing units, Big Spring Cultural Resources Building, Big Spring housing unit, and three Round Spring Housing units.
Key inspection requirements include comprehensive testing of fire alarm panels, components, power supplies, indicating appliances, initiating devices, and notification systems in accordance with NFPA 72 standards. The contractor must also inspect backflow preventers, fire sprinkler systems, and portable fire extinguishers, providing written reports within 14 days of completion. Technicians must hold specific certifications, including NICET Level 2 in Fire Protection Engineering Technology. Work will be conducted between 7 a.m. and 3:30 p.m., Monday through Friday, with the entire project to be completed within 60 days of contract award. The base year includes replacement of 86 portable fire extinguishers of various sizes and classes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6425Q0071_Amd_0002.pdf | ||
| Questions_and_Answers_0002.pdf | ||
| Sol_140P6425Q0071_Amd_0001.pdf | ||
| Revised_Statment_of_Work_0001.pdf | ||
| Price_Schedule.xlsx | XLSX spreadsheet | |
| Sol_140P6425Q0071.pdf | ||
| DOL_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P17 - OZAR Fire suppression system inspections Attachment 1 – Scope of Work
SCOPE OF WORK
“Inspection of Ozark Fire Suppression systems”
1. GENERAL
A. Summary
1. The Contractor shall provide all supplies, equipment, materials, tools, skilled labor and supervision to perform inspections tests on fire suppression systems.
2. The project work is located within Ozark National Scenic Riverways at the following Locations: Alley Spring Old Mill #501, Alley Spring Housing units #623, Big Spring Cultural Resources Building #1403, Big Spring housing unit #473 and three Round Spring Housing units #236, #237, and #238.
3. The Government will provide a dedicated escort to ensure unfettered access for Contractor personnel to execute work under this contract.
B. Inspect current suppression systems
1. The contractor will inspect the suppression systems that are currently installed at the above locations.
C. Fire Alarm Testing
1. Contractor shall test and inspect the performance of all main fire alarm panels and components, power and battery supplies, indicating appliances, annunciators, alarm initiating devices, and alarm notification appliances in accordance with current NFPA 72 standards for testing. Partial or a percentage of devices shall not be tested, but all devices listed in Attachment #1 shall be tested.
2. It is the responsibility of the Contractor to contact all alarm monitoring facilities (contact information to be provided at time of award) that receive alarms and supervisory or trouble signals before proceeding with alarm inspection and testing. The Contractor shall ensure that the fire alarm is operable upon completion of testing.
3. A written inspection and test report will be required for each system tested within 14 days of completion of all system inspections and tests. The Contractor must furnish a written or e-mail an electronic report of the results of each system inspected and tested.
The following shall apply:
a. The Contractor shall use the suggested Inspection and Testing Form found in NFPA
72 or an approved equal.
b. Include any problems noted with each system such as inoperable or unsupervised equipment or devices.
4. Notification: It will be required that occupied structures and facilities that receive alarm, supervisory or trouble signals (e.g. building manager, central station, Arrowhead Dispatch, Fire Department) be given a one-day notification before testing begins. At the conclusion of testing, the Contractor shall notify those previously notified that the testing has been concluded.
5. Damage to Fire Alarm System. Any damage to the fire alarm or associated equipment (e.g. fans, elevators, generators, pumps) caused by normal testing shall be repaired by the Contractor at no additional cost to the Government. At its discretion, the Government may have representatives present to witness any or all such tests. All costs associated with this damage shall be borne by the Contractor.
6. Safety Hazards. The Contractor shall immediately notify the Project Inspector (PI) of any recognized safety hazard that might severely affect building occupants
7. The following locations have a fire alarm system to be tested.
a. Alley Old Mill, 18179 Alley Spring Maintenance Access Road, Eminence, Mo 65466
b. Big Spring Cultural Resource Building 1403, 1403 NPS 986 Van Buren, MO 63965
c. Big Spring Housing Building #473, 473 NPS 780 Van Buren, MO 63965
D. Backflow devices
1. Provide all labor, supplies, equipment, materials, tools, skilled labor and supervision to test backflow preventer valve assemblies. The Contractor is to provide inspection and verification of backflow device.
a. Provide a new test tag and attach it to each of the backflow devices.
2. A written inspection and test report will be required for each system tested within 14 days of completion of all system inspections and tests. The Contractor must furnish a written or e-mail an electronic report of the results of each system inspected and tested.
The following shall apply:
a. Supply a copy of all reports to the Ozark National Scenic Riverways as required by local and state code for the protection of the water supply
E. Fire Sprinkler Systems
1. The contractor is to provide the following inspections and verification of the proper operation of the park automatic fire suppression systems (Attachment 2 - Inventory of Sprinklers/Backflow Devices Connections) and associated fire and trouble alarm devices in accordance with NFPA 25 and 72. In particular contractor shall inspect and verify:
a. Complete system main drain tests.
b. Annual trip test of dry pipe fire sprinkler system
c. General condition of the systems and their components.
d. The operating position of all control valves.
e. The operation of all sprinkler fire and trouble alarm devices.
f. Verify that the fire and trouble alarm devices are reporting to the alarm monitoring service located at NPS Arrowhead Dispatch Center, St. Louis MO.
g. Supply a copy of all reports to the Ozark National Scenic Riverways.
2. Schedule with the PI all non-emergency shutdowns of the water-based fire suppression system. Back up protection shall be provided by the Contractor any time that the water-based fire suppression system is out of service for more than 8 hours. In addition, regardless of the duration of the shutdown, the affected portion of the system shall be tested to ensure that the protection has been restored.
3. The project work is located at the following addresses:
d. Alley Old Mill, 18179 Alley Spring Maintenance Access Road, Eminence, Mo 65466
e. Alley Spring Housing Units #623, 18179 Alley Spring Maintenance Access Road, Eminence, Mo 65466
f. Big Spring Housing unit #473, 473 NPS 780 Van Buren, MO 63965
g. Round Spring Housing Units #236,237,238, 1320 Round Spring Cave Road, Eminence, Mo
4. Damage to Water-based Fire suppression System. Any damage to water-based fire suppression system equipment caused by normal testing shall be repaired by the Contractor at no additional cost to the Government. At its discretion, the Government may have representatives present to witness any or all such tests. All costs associated with this damage shall be borne by the Contractor.
5. Safety Hazards. The Contractor shall immediately notify the cognizant Ordering Official and Authority Having Jurisdiction and Building Manager of any recognized safety hazard that might severely affect building occupants.
6. Systems are accessible and located in either mechanical rooms or basements. One dry system is located under a staircase in the basement (see photo below). Estimated dimensions for access to the dry system are 4’ W x 5’ L x 6’ H.
F. Portable Fire Extinguishers (PFE): Inspections, Maintenance, and Testing
Services include the annual inspection of all park PFEs. There is a total of 86 PFEs ranging from 20-pounds to 2.5-pounds Necessary maintenance and repairs will be completed during the annual inspection.
Below services will be provided for the base year of the contract. Any optional year of the contract will include only annual inspections, maintenance, and repairs of the FPEs.
Base year services include the replacement of all existing PFEs as shown below:
• (1) Class ABC Hydro- 20-pound PFE
• (35) Class ABC 4A - 10-pound PFEs
• (24) Class ABC 2A - 5-pound PFEs
• (25) Class ABC 2A – 2.5-pound PFEs
• (1) Class K Hydro
G. Conditions
Prior to quotation submission, the Contractor should carefully examine the site and should familiarize himself/herself with the conditions under which the work shall be accomplished.
A walk through shall be arranged with the Project Inspector (PI).
2. JOB CONDITIONS
A. Structures
The work of this project will be in a historic building. The interiors are utilized for adaptive use as public use space.
B. Public Use Areas
The site is open to the public, and extreme care shall be used when entering, leaving and operating on park grounds.
C. Site Features
The Contractor shall use extreme care to protect site features from damage. Any damage resulting from the Contractor’s operation shall be repaired and/or replaced with like-in-kind material at the approval of the PI, at no additional cost to the Government.
D. Hours of Work
Work shall be conducted between the hours of 7 a.m. and 3:30 p.m., Monday through Friday. No work shall be performed after 3:30 p.m. or before 7 a.m., nor on Saturdays, Sundays, or federal holidays, unless requested and approved in advance by the PI. The main points of contact for scheduling inspections will be Park Ranger Daniel Dodd 573-323-8014 and VRP Admin Assistant Bradley Price 573-323-4945.
E. Security
The Contractor shall be solely responsible for the security of the job site, and for all project work and materials until receipt of written notification of final acceptance of the contracted work by the PI.
3. SUBMITTALS
A. Contractor’s Representatives
1. The Contractor shall submit the name of one (1) employee who shall be responsible for all Contractor operations on-site, and who shall have authority over all company personnel involved in performing the work required under this contract.
1. Technicians who conduct onsite work shall hold certificates as identified in paragraph B.2. of this section.
2. Provide a current copy of Missouri Plumbing License.
3. The Contractor shall be responsible for obtaining all NPS, county and state work related permits if required.
B. Quality Assurance
1. The work of this project shall comply with the latest edition at the time of bid of each of the following codes and standards:
a. NFPA 10: Standard for Portable Fire Extinguishers, 2013
b. NFPA 72: National Fire Alarm and Signaling Code, 2013
c. NFPA 25: Standard For The Inspection, Testing, And Maintenance of
Water-Based Fire Protection Systems 2014
d. Uniform Fire Code / current edition
e. IL Title 77: Public Health, Chapter I: Department of Public Health, Subchapter R: Water and Sewage, Part 890 Illinois Plumbing Code, Section
890.1130 Protection of Potable WATER
f. Uniform Building Code / current edition
2. Required Certifications
a. Fire Alarm Systems technicians performing contract work shall meet the service personnel qualification requirements in NFPA 72 and also hold at least a NICET Level 2 (Associate Engineering Technician) in Fire Protection Engineering Technology, Fire Alarm Systems or equal.
b. Water-based Fire Suppression System Technicians performing contract work shall hold at least a NICET Level 2 (Associate Engineering Technician) in Fire Protection Engineering Technology, Inspection and Testing of Water- Based Systems or equal.
c. Licensed Plumbers conducted backflow preventers inspections shall hold IL Certification as a Cross Connection Inspector
C. Execution and Completion
The Contractor shall execute the work in a neat, orderly and timely manner so as to complete the entire work under this contract within sixty (60) days after receipt of award and exercise of an option.
4. EXECUTION
A. Examination of Site
Contractor shall visit and carefully examine the site and shall familiarize himself/herself with the conditions under which the work must be carried out.
B. Standards
All damage to the site features occurring as a result of the Contractor’s operation shall be repaired or the damaged items or features replaced in kind to their original condition and/or configuration at no additional expense to the Government and the repair shall be approved by the PI.
C. Cleaning
All tools, equipment, surplus materials and rubbish shall be removed from the site upon completion of the contract.
5. CONTRACT CLOSE-OUT
A. Completeness
Should the PI determine that the work is substantially complete, he will prepare a punch list of deficiencies that need to be corrected before final acceptance and issue a Notice of Substantial Completion with the deficiencies noted.
B. Incompleteness
Should the PI determine that the work is not substantially complete, he will immediately notify the Contractor, in writing, stating such reasons. After the Contractor completes the indicated work, he/she shall resubmit certification and request for final inspection.
C. Acceptance of the Work
After all deficiencies have been corrected, a letter of Final Acceptance will be issued to the Contractor by the Contracting Officer. If only designated portions of the project have been inspected and accepted, a Letter of Partial Acceptance will be issued for that portion of the work. Acceptance may be given prior to correction of deficiencies which do not preclude operation and use of the facility; however, final payment will be withheld until all deficiencies are corrected. Until receipt of Letter of Final Acceptance, the Contractor shall be held responsible for all the work of this contract.
END OF SPECIFICATION
Appendix A – Partial List of Buildings, Panels, and Devices
Partial List of Buildings, Panels, and Detectors Contractor is Responsible for Verifying this List
Building # 473 – Big Spring Fourplex Check Valve – 1 Control valve – 2 Electric bell – 1 Fire Dept. connection – 1
PIV – 1
Tamper Switches – 3 Water flow switch – 1 Main Drain – 1 Wet System - 1
Building 1403 – Cultural Resource Building (Sapphire Gas System) Clean agent strobe - 2 Clean agent horn – 3 Clean agent horn strobe- 3 Clean agent abort switch – 4 Clean agent battery – 1 Clean agent control panel – 1 Clean agent cylinder – 1 Clean agent manual release device – 4 Clean agent smoke detector – 12
Building # 623 – Alley Seasonal Housing Check Valve – 1 Control valve – 2 Electric bell – 1 Fire Dept. connection – 1
PIV – 1
Tamper Switches – 3 Water flow switch – 1 Main Drain – 1 Wet System - 1
Building # 501 – Old Alley Mill Air compressor – 1 Air maintenance device – 1 Control valve – 2 Dry system – 1 Guage – 2 Inspectors test valve – 1 Tamper switch – 2 Main Drain – 1 Water pressure switch – 1
Building # 236: Round Spring Housing Electric bell – 1 Guage – 1 System control valve – 1 Water flow switch – 1 Main drain – 1 Wet system – 1
Building # 237: Round Spring Housing Electric bell – 1 Guage – 1 System control valve – 1 Water flow switch – 1 Main drain – 1 Wet system – 1
Building # 238: Round Spring Housing Electric bell – 1 Guage – 1 System control valve – 1 Water flow switch – 1 Main drain – 1 Wet system – 1
Big Spring Housing Building #473
Big Spring Cultural Building #1403 Sapphire Gas System
Big Spring Cultural Building #1403 Sapphire Gas System continued
Alley Spring Housing Building #623
Alley Spring Old Mill Building #501
Round Spring Housing Building #236, 237, 238
| Fire Suppression System inspection Scope of Work (Draft), 2015-04-21 (2) |
| F. Portable Fire Extinguishers (PFE): Inspections, Maintenance, and Testing |
OZAR
File details come from the government source that posted it. Updated .