STATEMENT OF WORK.pdf

PDF 657 KB Posted

Attached to
Repair Sidewalk and Blacktop at MDC Brooklyn (NY)
Solicitation number
15BBR025Q00000011
Issued by

About this file

This Statement of Work outlines requirements for sidewalk and blacktop repair at the Metropolitan Detention Center (MDC) Brooklyn, located at 80 29th Street in Brooklyn, NY. The Federal Bureau of Prisons (FBOP) seeks a single contractor to provide equipment, labor, materials for repairing 2,000 sq ft of damaged concrete walkway and 700 sq ft of hot roadway blacktop in the staff parking lot.

The contractor must follow industry standards for cement sidewalk installation, maintain workplace safety, and obtain necessary permits. Work hours are 6:00 PM to 4:00 AM Monday-Friday, excluding holidays. Key requirements include security clearance documentation submitted 14 days before work starts, proper PPE usage, and no chemical storage on site. The FBOP will provide water, restrooms, and 120V power for small tools. The contractor must handle material disposal without using FBOP containers and repair any government property damage at their cost. The document was approved by the NERO Facilities Administrator on 10-10-2024.

View the file

Other files

File Type Posted
REQUEST FOR INFORMATION.pdf PDF
WAGE DETERMINATION 15-4187.txt TXT text file
CONTRACTOR INFORMATION SHEET.pdf PDF
NYC DOT SIDEWALK MANAGEMENT MAP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .