This Statement of Work (SOW) outlines requirements for semi-annual inspection and preventative maintenance of 65 automatic doors across three buildings (20, 24, and 21) at the USDA/NCAH campus in Ames, Iowa. The buildings contain Stanley Magic Force operators with MC521 controllers (Buildings 20 and 2) and Horton 7100/4100 operators (Building 21).
The contractor must perform comprehensive door maintenance twice yearly (April and October), including inspection of door panels, frames, arms, linkages, operators, pivots, hinges, safety sensors, and motor/gearbox components. All work must comply with ANSI 156.19 standards. Key requirements include verifying door speeds, checking safety systems, inspecting decals, testing locking mechanisms, and documenting conditions. Reports must be submitted within 10 working days to the COR. Security requirements mandate 2-week advance notice, contractor check-in at the main gate, and work hours between 7:00 AM and 5:00 PM. The NCAH will provide escorts for technicians and location diagrams. Any non-standard wear and tear or safety issues must be immediately reported, and authorization is required for billable part replacements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Project: ANNUAL INSPECTION AND MAINTENANCE OF AUTOMATIC
DOORS
GENERAL INFORMATION
1.0 Scope of Work:
Provide the USDA/NCAH with semi- annual inspections and preventative maintenance program for the automatic doors in buildings 20, 24, and 21 on the campus located at 1920 Dayton Ave. Ames, Iowa.
2.0 Background:
The National Centers for Animal Health is currently in need for a semi-annual inspection and preventative maintenance program for 65 automatic doors throughout building 20, 24, and 21. Building 20 and 2 are Stanley Magic Force operators (MC521 controllers), building 21 is supplied with Horton 7100 and 4100 operators. Attachments will have locations of operators with blue prints.
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks:
The contractor shall provide all labor and skills required to perform the following
PM inspections. All work must be performed once in April and the other in Oct. all must be coordinated with the POC or COR, contact information will be provided.
Listed below are the maintenance inspections needed.
• Inspect door panels and frames for any visible damage or wear (evaluate and record).
• Check and inspect all arms and linkage, tighten or re-anchor as necessary.
• Inspect operators (full open stop, emergency breakout, open and close check position).
• Inspect pivots and or hinges, clean and lubricate as necessary.
• Inspect door open and closing force. Must meet ANSI 156.19.
• Inspect wiring for any damage or loose connection inside the header.
• Verify door speed, full size pedestrian doors. Low energy, open speed, close speed. Table 1 ANSI 156.19, BC latch min 10 degrees, BC 1 second/latch 1.5 seconds.
• Inspect door safety sensor system, inspect door safety sensors on low energy doors.
• Inspect pedestrian door safety decals.
• Check hold open time, full open time.
• Inspect motor/gearbox for excessive wear, leaking oil, or bad resistance.
• Inspect for broken or cracked glass.
• Verify locks are in working condition, ease of locking, secure locking.
• Report overall door condition.
• Any safety condition that does not meet standards will be reported immediately.
• Authorization is needed prior to any billable part replacement.
• Any parts that are determined to be not normal wear and tear need to be on written report.
• Report of inspection should be provided within 10 working days to the COR.
4.0 Government Furnished:
NCAH will furnish escorts for technicians.
5.0 Deliverables / Schedule:
Key Deliverables Item No.
Deliverable
Objective
Due
Inspection/Preventative Maintenance
Inspect door panels and frames for any visible damage or wear (evaluate and record).
Semi-annually
Inspection/Preventative Maintenance
Check and inspect all arms and linkage, tighten or re-anchor as necessary.
3 Inspection/Preventative Maintenance
Inspect operators (full open stop, emergency breakout, open and close check position).
4 Inspection/Preventative Maintenance
Inspect pivots and or hinges, clean and lubricate as necessary.
5 Inspection/Preventative Maintenance
Inspect door open and closing force. Must meet ANSI 156.19.
6 Inspection/Preventative Maintenance
Inspect wiring for any damage or loose connection inside the header.
7 Inspection/Preventative Maintenance
Verify door speed, full size pedestrian doors. Low energy, open speed, close speed. Table 1 ANSI 156.19, BC latch min 10 degrees, BC 1 second/latch 1.5 seconds.
8 Inspection/Preventative Maintenance
Inspect door safety sensor system, inspect door safety sensors on low energy doors.
Inspection/Preventative Maintenance
Inspect pedestrian door safety decals.
Inspection/Preventative Maintenance
Check hold open time, full open time.
Inspection/Preventative Maintenance
Inspect motor/gearbox for excessive wear, leaking oil, or bad resistance.
12 Inspection/Preventative Maintenance
Inspect for broken or cracked glass.
Inspection/Preventative Maintenance
Verify locks are in working condition, ease of locking, secure locking.
Inspection/Preventative Maintenance
Report overall door condition.
Inspection/Preventative Maintenance
Any safety condition that does not meet standards will be reported immediately.
Inspection/Preventative Maintenance
Authorization is needed prior to any billable part replacement.
17 10 days after inspection
Any parts that are determined to be not normal wear and tear need to be on written report.
10 days after inspection
18 10 days after inspection
Report of inspection should be provided within 10 working days to the COR.
10 days after inspection
6.0 Security Requirements:
At least a 2-week notice needs to be given before work is to begin.
All contractors must check-in at main gate and main desk at lobby Southwest entrance to building 20 each day to receive contractor pass (driver’s license will be needed.) Working hours are between 7:00 am and 5:00 pm daily.
Attachment: Location diagram.
| CONTRACTOR REQUIREMENTS |
| 3.0 Technical Requirements/Tasks: |
| The contractor shall provide all labor and skills required to perform the following PM inspections. All work must be performed once in April and the other in Oct. all must be coordinated with the POC or COR, contact information will be prov... |
File details come from the government source that posted it. Updated .