Statement of Work.pdf

PDF 216 KB Posted

Attached to
Diesel Tank Inspection Federal contract opportunity
Solicitation number
12505B23Q0266
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

About this file

This statement of work outlines requirements for a 20-year internal inspection of a 100,000-gallon diesel fuel oil tank at the USDA National Center for Animal Health in Ames, Iowa. The contractor must conduct the inspection in accordance with EPA, CFR, and API regulations, which includes isolating and locking out the tank and fuel pumps, performing the internal inspection using API 653 checklists, and providing pictures and a completed inspection report within 24 hours. The contractor must have API 653 tank inspection certification and be able to empty, clean, refill, and dispose of any hazardous waste from the tank if inspection requires draining. The government will provide water, electricity, and compressed air onsite, and inspection must be completed and the final report submitted within 90 days of award. Security requirements include verifying employee names and IDs and escorting contractor personnel within secure areas.

View the file

Other files for this federal contract opportunity

Other files attached to Diesel Tank Inspection, newest first.
File Type Posted
Picture 07.jpg JPG image
Picture 10.jpg JPG image
Picture 12.jpg JPG image
Site Visit Sign In Sheets.pdf PDF
Picture 05.jpg JPG image
Picture 08.jpg JPG image
Picture 01.jpg JPG image
Picture 02.jpg JPG image
Picture 03.jpg JPG image
SF-30 - Amendment 02.pdf PDF
RFIs.pdf PDF
Picture 04.jpg JPG image
Picture 06.jpg JPG image
Picture 09.jpg JPG image
Picture 11.jpg JPG image
SF-30 Amendment 01.pdf PDF
AGAR 452.237-71.pdf PDF
Wage Determination.pdf PDF
Clauses and Provisions.pdf PDF
Appendix C - Tank Inspection Report.pdf PDF
Annex D - API tank inspection 653 e5 A2.pdf PDF
Drawings.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Project: Bldg 154, 100,000-gal fuel oil tank inspection.

GENERAL INFORMATION

1.0 Scope of Work: It has been determined that the USDA National Center for Animal

Health’s (NCAH) 100,000 gallon fuel oil tank must have a 20-year internal inspection completed. The inspection shall be conducted in accordance with all current U.S. Environmental Protection Agency (EPA), U.S. Code of Federal Regulations (CFR), and American Petroleum Institute (API) regulatory requirements.”

2.0 Background: Per 49 CFR 195.432(b) and the API 653: “Tank Inspection, Repair, Alteration, and Reconstruction,” the USDA is required to conduct a 20-year internal inspection of the above ground 100,000-gallon diesel fuel oil tank.

CONTRACTOR REQUIREMENTS

3.0 Technical Requirements/Tasks:

• Lock-out, Tag-out: The contractor shall isolate and lock out- tag out the 100,000-gallon fuel oil tank and fuel oil pumps to the most stringent standard of either the USDA standards or the contractors standards.

• In accordance with 49 CFR 195.432(b), contractor will conduct a 20-year internal inspection of the USDA above-ground 100,000 gallon diesel fuel oil tank.

• In accordance with API 653, the contractor will perform a 20-year internal inspection of the above ground 100,000-gallon diesel fuel oil tank. Pictures shall be taken during the inspection and provided with the report.

• Contractor shall provide a completed APPENDIX C Tank Inspection Report (attached) electronically to the Technical Point of Contact within 24 hours of inspection completion.

• The tank inspection contractor shall have a current certification in API 653 tank inspection per the latest edition, API Standard 653, Annex D.

• If inspection by an engineer in-person is anticipated, it is expected that the contractor will fully empty the tank, provide any temporary tanks as part of the process and quoted price, provide any hoses and connectors necessary for the facility to access the fuel in the temporary tanks, complete inspection, clean the tank, re-fill the tank following inspection and dispose of any hazardous waste resulting in accordance with all current state and federal laws and guidelines, all included in the quote pricing schedule. If this process is anticipated, a site visit prior to quote submission can be requested.

• If inspection by a ROV (Remotely Operated Vehicle), it is not expected that the contractor will need to fully empty the tank. Thus, the quoted pricing schedule shall not include temporary tanks, cleaning the tank or disposal of any hazardous waste.

4.0 Government Furnished:

The Government shall furnish water for cleaning and preparation work, electrical power, and compressed air at 95-100psi. Electricity for contracted work is available from nearby generator building 153. Compressed air and industrial water will be available from nearby building 154 utility plant.

5.0 Deliverables / Schedule:

Item No.

Deliverable

Objective

Due

2 Tank inspection Per 49 CFR 195.432(b) and the API 653, the contractor will perform a 20-year internal inspection using the API 653 inspection check list in appendix C of the API regulation.

Completed within 90 days of date of award.

3 Tank inspection report

The report shall be complete and concisely filled out noting the condition of the entire tank as well noting any/all deficiencies found in the inspection (as well providing pictures) API 653

APPENDIX C ATTACHED

Provided electronically within 24 hours of inspection completion.

3 Hazardous waste disposal

All hazardous waste will be disposed of properly according to all state and federal laws and guidelines.

Completed within 90 days of date of award, following inspection as determined necessary depending on the inspection process used.

6.0 Security Requirements:

The names of contractor employees shall be provided to the Contracting Officers Representative (COR) to verify employee requesting access to site, no later than ten (10) days prior to inspection.

The National Centers for Animal Health is a secure facility. The contractor shall follow the following requirements:

Contractor personnel shall sign in and sign out every time they enter or exit the facility.

Contractor personnel shall present a valid photo government issued ID every time they enter the site.

Contractor personnel shall be supplied a NCAH badge that must be displayed at all times while on site.

Contractor personnel shall return the NCAH badge every time they leave the secure facility.

Contractor personnel shall be escorted at all times while within the s secure areas of the NCAH facility.

7.0 Place of Performance: USDA-National Center for Animal Health, 1920 Dayton

Avenue, Building 154, Ames, IA.

8.0 Period of Performance: Inspection shall be completed and final report

(APPENDIX C) provided to Technical Point of Contact within 90 days of date of award.

9.0 Technical Point of Contact: TBD.

ATTACHMENT:

Appendix C

CONTRACTOR REQUIREMENTS
6.0 Security Requirements:
( The names of contractor employees shall be provided to the Contracting Officers Representative (COR) to verify employee requesting access to site, no later than ten (10) days prior to inspection.
7.0 Place of Performance: USDA-National Center for Animal Health, 1920 Dayton Avenue, Building 154, Ames, IA.
8.0 Period of Performance: Inspection shall be completed and final report (APPENDIX C) provided to Technical Point of Contact within 90 days of date of award.
9.0 Technical Point of Contact: TBD.