RFIs.pdf

PDF 83 KB Posted

Attached to
Diesel Tank Inspection Federal contract opportunity
Solicitation number
12505B23Q0266
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

About this file

This document contains questions and answers from a Requests for Information related to solicitation number 12505B23Q0266 for inspection of a diesel tank issued by the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area. The key details are that the tank to be inspected holds approximately 63,000 gallons of fuel currently, with a capacity of 80,000 gallons. The tank is a solid roof design, not floating. The contractor must hold current API 653 tank inspection certification and have the capability to inspect and deliver an inspection report within 5 business days. No external inspection is required. Pictures of the tank have been provided on SAM.

View the file

Other files for this federal contract opportunity

Other files attached to Diesel Tank Inspection, newest first.
File Type Posted
Picture 07.jpg JPG image
Picture 10.jpg JPG image
Picture 12.jpg JPG image
Picture 01.jpg JPG image
Picture 02.jpg JPG image
Picture 03.jpg JPG image
Site Visit Sign In Sheets.pdf PDF
Picture 05.jpg JPG image
Picture 08.jpg JPG image
SF-30 - Amendment 02.pdf PDF
Picture 04.jpg JPG image
Picture 06.jpg JPG image
Picture 09.jpg JPG image
Picture 11.jpg JPG image
SF-30 Amendment 01.pdf PDF
AGAR 452.237-71.pdf PDF
Wage Determination.pdf PDF
Clauses and Provisions.pdf PDF
Appendix C - Tank Inspection Report.pdf PDF
Annex D - API tank inspection 653 e5 A2.pdf PDF
Statement of Work.pdf PDF
Drawings.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requests for Information Solicitation 12505B23Q0266

Question 1: How much fuel is expected to be in the tank that needs to be transferred and stored?

Answer 1: We try to keep 80,000 gallons on hand at all times so it will be that or less.

Currently we have about 63,000 gallons on hand.

Question 2: Are there any pictures of the tank other than the prints provided? Specifically, the man way access and all associated nozzles.

Answer 2: Some external pictures have been added as attachments on SAM.

Question 3: The drawing shows that the tank is NOT an internal floating roof but some of the documentation states that it is. Which is correct?

Answer 3: Solid roof. Not floating.

Question 4: Do you want an external inspection done at the same time?

Answer 4: No.

Question 5: The request states that a final inspection report is to be delivered within 24 hours of the inspection. It is possible a contractor could still be traveling back from the location at that time. Can this final inspection report deadline be extended to 30 days after the inspection?

Answer 5: 5 business days.

Question 6: Does the prime contractor have to hold a current certification in API 653 tank inspection per the latest edition?

Answer 6: The contractor actually performing the work must hold this certification.