Statement_of_Work.docx

DOCX document 38 KB Posted

Attached to
POTABLE AND NON-POTABLE WATER TESTING FOR SHENANDO
Solicitation number
140P4226Q0003
Issued by

About this file

This Statement of Work (SOW) details potable and non-potable water testing services for Shenandoah National Park in Luray, Virginia. The contract requires a laboratory to perform comprehensive water testing, including presence/absence tests, total coliform, nitrate-nitrite, volatile organics, inorganics, metals, and other specialized analyses for both potable and non-potable water sources. The contract duration is a base 12-month period with four 12-month option periods, with estimated test quantities varying across base and option years.

Key requirements include laboratory certification by the Division of Consolidated Laboratories (DCLS), adherence to Virginia Department of Health regulations, and electronic reporting of test results within five business days. The laboratory must be within 50 miles of the park, accept samples Monday through Thursday, and provide detailed test reports including location, sampling dates, results, detection limits, and analyst information. Payment will be processed monthly through the US Treasury Internet Payment Portal, with invoices submitted electronically. The solicitation is issued by the Department of the Interior National Park Service Northeast Region under solicitation number 140P4226Q0003.

View the file

Other files

File Type Posted
Sol_140P4226Q0003_Amd_0003.pdf PDF
Amendment_3_Q_and_A_140P4226Q0003_0003.docx DOCX document
Sol_140P4226Q0003_Amd_0002.pdf PDF
140P4226Q0003_Amendment_2_Q_and_A_0002.docx DOCX document
Sol_140P4226Q0003_Amd_0001.pdf PDF
Amendment_1_Q_and_A_140P4226Q0003_0001.docx DOCX document
Wage_Determination_WD_15-4333_Rev_32_Page_County.pdf PDF
Sol_140P4226Q0003.pdf PDF
Price_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POTABLE AND NON-POTABLE WATER TESTING

Shenandoah National Park

SCOPE OF WORK:

The required service is for furnishing all equipment, materials, supplies, and labor for performance of potable and non-potable water regulatory testing in accordance with the Virginia Department of Health/Office of Drinking Water, the Safe Drinking Water Act, the latest edition of 40 CFR 136, and the latest approved standard methods by the Division of Consolidated Laboratories (DCLS). Laboratories must be certified by the DCLS in all analytes covered by this contract through the Virginia Environmental Laboratory Accreditation Program (VELAP). Reports of tests must be sent to the individuals listed in the Response Time Requirements section of this scope of work. For potable water, laboratories must follow the guidance of the Virginia Department of Health/Office of Drinking Water regarding electronic reporting, utilizing the examples shown on their website:

https://www.vdh.virginia.gov/drinking-water/information-for-laboratories/

All water and wastewater samples will be collected by park staff in containers supplied by the contract laboratory. The contract laboratory shall supply chain of custody forms that provide sample accountability. Park staff will deliver the samples to the contract laboratory for testing if the laboratory is within a 50-mile radius.

OR

The contractor shall arrange to have the samples picked up from Shenandoah National Park Headquarters, 3655 U.S. Hwy 211 East, Luray VA 22835 and transported to the laboratory.

Quantities of services listed in this document show the number of analytes to be tested and estimated numbers of tests to be run each specified year. Bids should reflect the total cost for the estimates provided.

LOCATION:

The contractor’s testing facility location for delivery of the samples must be within a 50-mile radius of the Shenandoah National Park, 3655 US Hwy 211 East, Luray, Virginia 22835 in order for sample hold times to allow for testing at contractor’s facility. Samples must be accepted Monday through Thursday with tests run within the hold times required by the individual test. Contractor to provide a list of the latest a test may arrive at the facility in order to meet the required hold times.

OR

The contractor shall arrange, via courier or other method, to have the samples picked up and transported to the laboratory from: Shenandoah National Park, 3655 US Highway 211 East, Luray, Virginia 22835.

Samples shall be picked up between 8:00am-4:30pm, Monday-Friday, excluding Federal holidays.

PERIOD OF PERFORMANCE: The period of performance will be a base period of twelve (12) months from date of award. The contract will include four (4) twelve (12) month option periods.

RESPONSE TIME REQUIREMENTS/DELIVERABLES: Upon receipt of samples, the contractor will be required to conduct tests within the timeframe allowed for the tests and email results within five (5) business days to the water and wastewater operators – whose email addresses will be provided at time of samples – and to the following designated official for report submissions:

Shenandoah National Park Tina Touchstone Utility Systems Repairer-Operator Supervisor 3655 US Highway 211 East, Luray, VA 22835 540-999-3500 x3251 tina_touchstone@nps.gov

At a minimum, the written results shall include: location, date and time sampled (will be provided on the sample and chain of custody forms delivered to the contractor), date received, date test results issued, the parameter tested, results, units, detectable limits, date and time test prepared and analyzed, testing method, VELAP certification number, and the analyst’s name. Emailed results shall be signed by a laboratory supervisor or manager and shall include the original chain of custody.

Laboratory to follow Virginia Department of Health regulations for reporting potable water results directly to the Virginia Department of Health database.

PAYMENT: Requests for payment for testing will be made once per month utilizing the US Treasury Internet Payment Portal: www.ipp.gov. All invoices for the month will be combined and submitted electronically. A breakdown of the costs shall be uploaded with the invoice.

DESCRIPTION: The number and type of tests required for the base plus four (4) option years are as follows:

Estimated Number of Potable Water Tests

Base
Option Yr. 1
Option Yr. 2
Option Yr. 3
Option Yr. 4
Test
Description
# tests
# tests
# tests
# tests
# tests
PA
Presence Absence
220
220
220
220
220
MPN
Total coliform
70
70
70
70
70
NN
Nitrate-Nitrite
25
25
25
25
25
VOC
Volatile Organics
0
5
0
0
5
INO
Inorganics
0
5
0
0
5
METAL
Metals
0
5
0
0
5
CYN
Cyanide
0
2
0
0
2
HAA
Haloacetic Acids
0
5
0
0
5
THM
Trihalomethanes
0
5
0
0
5
L/C
Lead and Copper
20
30
0
20
30

Estimated Number of Non-potable Water Tests

Base
Option Yr. 1
Option Yr. 2
Option Yr. 3
Option Yr. 4
Test
Description
# tests
# tests
# tests
# tests
# tests
Ammonia
Ammonia - N
106
106
106
106
106
Cu
Copper
25
25
25
25
25
CO3
Hardness
25
25
25
25
25
O&G
Oil & Grease
50
50
50
50
50
Sludge 1
Sludge 1
4
4
4
4
4
Sludge 2
Sludge 2
4
4
4
4
4
BOD
Biochemical Oxygen Demand
45
45
45
45
45
CBOD
Carbonaceous Biochemical Oxygen Demand
60
60
60
60
60

Inorganics

Metals

Inorganics
TURBIDITY
Metals
ALUMINUM
Inorganics
CHLORIDE
Metals
ARSENIC
Inorganics
FLUORIDE
Metals
BARIUM
Inorganics
ORTHOPHOSPHATE
Metals
CADIUM
Inorganics
SULFATE
Metals
CHROMIUM
Inorganics
CONDUCTIVITY @ 25 C
Metals
COPPER, FREE
Inorganics
COLOR
Metals
IRON
Inorganics
CORROSIVITY
Metals
LEAD
Inorganics
CALCIUM HARDNESS
Metals
MANGANESE
Inorganics
HARDNESS, TOTAL
Metals
MERCURY
Inorganics
PH
Metals
NICKEL
Inorganics
ALKALINITY. TOTAL
Metals
SELENIUM
Metals
SILVER
Metals
SODIUM
Metals
ANTIMONY, TOTAL
Metals
BERYLLIUM, TOTAL
Metals
THALLIUM, TOTAL
Metals
ZINC

Sludge 1 pH

TCLP Metals:
Arsenic, Barium, Chadmium, Chromium, Lead, Mercury, Selenium, Silver
TCLP Volatiles:
Vinyl chloride, 1, 1-Dichloroethene, Carbon tetracholoride, Chloroform, 1,2-Dichloroethane, Benzene, Trichloroethene, Benzene, Tetrachloroethene, Chlorobenzene, 1,4-Dichlorobenzene, Methyl ethyl ketone
TCLP Semi-Volatiles:
2,4,6-Trichlorophenol, Pentachlorophenol, o-Cresol, m-Cresol, p-Cresol, Pyridine, Hexachloroethane, Nitrobenzene, Hexachlorobutadiene, 2,4-Dinitrotoluene, Hexachlorbenzene, PCB as Arochlor 1221, PCB as Arochlor 1232, PCB as Arochlor 1242, PCB as Arochlor 1016, PCB as Arochlor 1248, PCB as Arochlor 1254, PCB as Arochlor 1260, Paint Filter

Sludge 2 pH, TKN, Phosphorus, Total Solids, Boron, alpha-BHC, gamma-BHC, delta-BHC, beta-BHC, Aldrin, Heptachlor epoxide, Hepachlor, Endosulfan I, 4,4- DDE, Dieldrin, Endrin, 4,4-DDD, Endosulfan II, 4,4-DDT, Endrin aldehyde Endosulfan sulfate, Chlordane, Toxaphene, Methoxychlor, Molybdenum, Chromium, Arsenic, Copper, Selenium, Nickel, Zinc, Cadmium, Iron, Lead, Manganese, Magnesium, Mercury, Barium, Arochlor 1221, PCB as Arochlor 1232, PCB as Arochlor 1242, PCB as Arochlor 1016, PCB as Arochlor 1248, PCB as Arochlor 1254, PCB as Arochlor 1260

Bid Sheet

Base
Option 1
Option 2
Option 3
Option 4
Test
Total
Cost
Total
Cost
Total
Cost
Total
Cost
Total
Cost
Presence Absence
220
Total coliform
70
Nitrate-Nitrite
25
Volatile Organics
0
Inorganics
0
Metals
0
Cyanide
0
Haloacetic Acids
0
Trihalomethanes
0
Lead and Copper
20
Ammonia - N
106
Copper
25
Hardness
25
Oil & Grease
50
Sludge 1
4
Sludge 2
4
Biochemical Oxygen Demand
45
Carbonaceous Biochemical Oxygen Demand
60

Total

Total

Total

Total

Total