Statement of Work.docx

DOCX document 21 KB Posted

Attached to
ISO 9001:2015 Certification Services at Watervliet Arsenal, NY
Solicitation number
W911PT24Q0069
Issued by

About this file

This document is a Performance Work Statement (PWS) for ISO 9001:2015 Certification Services to support the Watervliet Arsenal's ISO registration requirements. It describes the need for a contract with options to conduct surveillance and recertification audits over a three-year period from September 2023 to September 2025.

The contractor shall provide all personnel, supervision, and other items and non-personal services necessary to support the audits. Year 1 and 2 will require 4.5-day surveillance audits, while Year 3 will require a 7-day reassessment audit to determine eligibility for recertification. The total estimated cost is $25,380. The contract will have a one-year base period with two one-year option periods. The work will be performed on-site at the Watervliet Arsenal, and the contractor must meet specific security and qualification requirements. The government will provide office space, utilities, and other support as needed. Key deliverables include an audit schedule, summary of audit findings, and a comprehensive audit report.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

ISO 9001:2015 Certification Services to Meet Internal Audit Requirements

PART 1

GENERAL INFORMATION

Summary: This scope of work describes the need for a contract with options to meet the below described need during the three year period between September 2023 and September 2025. Year #1 and #2 cost for surveillance audit is estimated at $6710 each year. Third year cost for reassessment audit is estimated at $11960. Total cost is estimated at $25,380.

1.0 Description of Services. The contractor shall provide all personnel, supervision, and other items and non-personal services necessary to conduct surveillance and recertification audits to support Watervliet Arsenal’s ISO registration. The nature of the work is normally in the form of surveillance or recertification audits. In the first year the requirement will be for a four (4.5) day surveillance audit in September 2023. The second year requirement is a four (4.5) day surveillance audit in September 2024. The third year requirement is a reassessment audit of up to seven (7) days in September 2025; which determines if the certification will be issued for another three year period. Each audit period may require additional follow-up by NQA in the event corrective actions are requested by the registrar and/or their representative auditor. All work will be performed at the Watervliet Arsenal.

1.1 Background. Watervliet Arsenal is required by AR 702-11, the DFARS and AR 5-1 to have and maintain a quality management system. ISO 9001:2015 certification meets this requirement. The terms of ISO certification require annual audits by an external registrar. Certification term is three years. In each of the first two years surveillance audits are required. For an installation this size, four days are required for these surveillance audits. In the third year, more comprehensive audits are required to determine eligibility for recertification. For an installation this, six to seven days are required for conduct of this audit.

ISO 9001:2015 Clause 9.2 Internal Audit The purpose of an internal audit is to systematic and independent assess the effectiveness of any organization’s quality management system and its overall performance Internal audit demonstrate the compliance with a planned arrangements’, e.g. the QMS and how its processes are implemented and maintained.

1.2 Period of Performance. The period of performance will be for one year with two (2) option years.

1.3 General Information

1.3.1 Contractor Quality Control (QC). The contractor shall develop and maintain an effective quality control program to ensure audit services are consistent with the ethical requirements of third party ISO auditors.

1.3.2. Government Quality Assurance. The government shall evaluate the contractor’s performance via review and acceptance of the auditor findings. Acceptable audit results include factual support for findings.

1.3.3. Government Remedies. The contracting officer shall follow FAR 51.212-4, “Contract Terms and Conditions – Commercial Items” for contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

1.3.4. Recognized Holidays. The contractor is not required to perform services on these days:

New Year’s Day, Martin Luther King Jr. Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day.

1.3.5. Hours of Operation/Place of Performance. The contractor will conduct business in accordance with Watervliet Arsenal’s normal business hours. The place of performance is Watervliet Arsenal.

1.3.6. Security Requirements. The contractor requires access to all installation areas and will be escorted by Watervliet Arsenal personnel.

1.3.7. Identification of Contractor Employees. All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. Contractor personnel will be responsible for wearing of badge while on Arsenal property and also protecting it from loss or theft.

1.3.8. Special Qualifications. All contractor employees under this contract will require special qualifications. At a minimum, all individuals employed under this contract shall have at least twenty years of experience related to implementation and maintenance of ISO quality management systems. Ideally contractor employees will have at least 15 of these years in manufacturing environments.

PART 2

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT AND SERVICES

2.0 Utilities. All utilities in the facilities will be available for the contractor’s use in performance of duties outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude waste of utilities.

2.1 Facilities. The work to be performed will occur on-site in the offices of the Watervliet Arsenal. The government will provide office space, office supplies, internet and web access, telephone and reproduction facilities, as required. In assigning office space, special attention will be given to recognize the nature of services performed by the contractor.

PART 3

SPECIFIC TASKS

3.1 Basic services. The identified tasks below are specifically directed at supporting this contract and the ISO quality management system audit requirements.

3.2. Specific.

3.2.1. Provide audit schedule no later than two days before audit start date.

3.2.2. Provide inbrief summary to Board of Directors and Commander.

3.2.3. Conduct audit in accordance with heretofore mentioned audit schedule.

3.2.4. Provide report of audit with facts and analysis to support findings.

3.2.5. Present findings in outbrief to Board of Directors and Commander.

4.0 Deliverables.

Item (PWS Section)

Frequency

Date Due

# of Copies

Submit to

Audit Schedule
One per audit
NLT two days before start of audit
1 (hard copy or electronic)
CQ Quality Management Rep
Summary of Audit Findings
One per audit
Last day of audit
1 (hard copy – signed original)
CQ, BoD and CO
Comprehensive Report of Audit Findings
One per audit
NLT 30 days after audit
1 (hard copy or electronic)
CQ Quality Management Rep

5.0 Performance Requirements Summary

Performance Objective (PWS Para.)
Standard

(PWS Para.)

Performance Threshold
Method of Surveillance
Audit Schedule
One per audit
NLT two days before start of audit
100% review by CQ Quality Management Rep
Summary of Audit Findings
One per audit
Last day of audit
100% review by CQ Quality Management Rep
Comprehensive Report of Audit Findings
One per audit
NLT 30 days after audit
100% review by CQ Quality Management Rep

Point of Contact is the undersigned extension 518-266-4914.

Allen J. Kipp
Quality Management RepXX XXXX 2023
Gary R. Porter
Lead ISO AuditorXX XXXX 2023

File details come from the government source that posted it. Updated .