Statement of work.docx

DOCX document 35 KB Posted

Attached to
Allegheny National Forest ATV Trail Maintenance Federal contract opportunity
Solicitation number
1090204
Issued by
Department of Agriculture Forest Service R9-Eastern Region

View the file

Other files for this federal contract opportunity

Other files attached to Allegheny National Forest ATV Trail Maintenance, newest first.
File Type Posted
2023 Timberline B Loop..jpeg JPEG file
solicitation updated.pdf PDF
Timberline C Loop Site 4.jpg JPG image
Timberline C Loop Site 3.jpg JPG image
Schedule of Items Timberline C Loop ATV 2023.docx DOCX document
Timberline C Loop Site 5.jpg JPG image
Timberline C Loop Site 2.jpg JPG image
Timberline C Loop Site 1.jpg JPG image
Schedule of Items 1-20-2023 (Timberline OHV B loop Trail).docx DOCX document
2023 Timberline B Loop.jpeg JPEG file
Schedule of Items Template.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Trails Maintenance

1.0 Purpose

The purpose of this SOW is to obtain trails maintenance services at Allegheny National Forest by means of a combination firm fixed-price and indefinite quantity contract.

1.1 General Requirements

The Contractor must furnish all labor, supervision, equipment, and materials necessary to provide trails maintenance services in accordance with the requirements specified herein. The operations to be performed must include normal tread maintenance, heavy tread maintenance, additional appurtenant trail materials (AASHTO #8, AASHTO #10, DSA Limestone, PA2A, PA3A, PA3A Limestone), obliteration of abandoned/unauthorized trail (backfilling any trenches, holes, pits), hazard tree removal, seeding, mulching, silt fencing, Riprap (R-3, R-4, R-5), collection and disposal of litter and trash, vegetation cutting and removal, underbrushing, erosion control, ditch cleaning, and other miscellaneous services as described herein.

910 The Forest Service (FS) has a need for a Performance Based Service Contract for Forest-Wide Trail Normal and Heavy Maintenance on the Allegheny National Forest. The contractor(s) shall provide all expertise, labor, supervision, services, equipment, tools, supplies, permits (when and if required), coordination with utilities, transportation, and incidentals necessary to perform trail normal and heavy tread maintenance, directly related to trail activities on the Allegheny National Forest in Pennsylvania.

Such normal and heavy tread trail maintenance will occur primarily occur in the Spring and Fall seasonal months. Spring and Fall maintenance performance will be optional for any given year during the term of the contract depending on the condition of each trail system listed in the contract. This will depend on the condition of each trail system that may be affected by adverse weather conditions and or use. Spring maintenance will start March 1st and must be completed no later than the Thursday before Memorial Day. If start up or other scheduled work days are late/postponed due to weather, trail conditions or other extenuating circumstances defined by the CO or COR – work may continue after the trail is open an equal number of days upon approval the of CO or COR. Fall maintenance on trails will start Tuesday after Labor Day and be completed no later than December 15th. If start up or other scheduled work days are late/postponed due to weather, trail conditions or other extenuating circumstances defined by the CO or COR – work may continue after 15 December for an equal number of days upon approval the of CO or COR. Trails will remain open during the contract, unless agreed to by the FS that a section may be closed for safety or resource protection. No evening work or work on weekends or federal holidays will be allowed without approval of the Contracting Officer’s Representative. Work will only be allowed during appropriate weather conditions. Inspections will be performed weekly and work will be accepted prior to contractor shutting down for the weekend.

91106.1 Normal Trail Maintenance (aka, Normal Tread Maintenance) will primarily include the maintenance of existing trails with not more than 6” deep ruts or holes from the tread surface for no longer than 500 foot sections ending with a trail tread depth of 4” of compacted aggregate, and a trail width of 50-64”. Reconditioning of the trail surface may include the maintenance of any or all trail tread, including pulling in material from undesirable berms and reincorporating into tread, compacting and correcting damage that corrupts drainage pattern. The work will include reshaping the trail to the original insloped / outsloped condition and controlling surface drainage to prevent further degradation of the trail and compact all disturbed areas. All dips will be reconstructed as shown in the drawings. Culvert maintenance by cleaning culverts of deposited/debris materials to allow free flow of water. Ditch maintenance including removal of deposited/debris materials to allow free flow of water while maintaining depth and slope. Drain Dip maintenance ensuring leadoff ditches be opened and free of deposited/debris materials and compaction of materials to maintain side slope stability. Loading, unloading and transportation of government furnished materials to a trail location determined by the COR. Additional surface aggregate may be needed to supplement pulled-in slough material that is recaptured, watered (as determined by the COR) and compacted within specifications and tolerances. Such surfacing aggregate will include:

AASHTO #10 or #8, DSA Limestone, PA 2A, AASHTO #3 (PA 3A), AASHTO #3 Limestone (PA 3A Limestone) Government furnished surfacing aggregate, The FS estimates at least an annual need of approximately 100 tons of the above aggregates for each trail system (5 trail systems, i.e., 500 tons minimally) Task Orders under this section will specify types of aggregate surfacing to be applied.

91106.1 Heavy Trail Maintenance (aka, Heavy Tread Maintenance) will primarily include those portions of heavily damaged trail tread that would require more than normal maintenance to return to original shape. Heavy maintenance will include areas that are deeply rutted, have large waterholes and drainage has been significantly changed and where more than normal amount of work is needed to repair. In all cases the trail is still defined but has significant reshaping to be performed. Heavy Tread maintenance will be required if ruts/holes are deeper than 6” but not more than 18” and less than 30 CY of material needs to be moved over a 150’ length of trail ending with a trail tread depth of 4” of compacted aggregate, and a trail width of 50-64”. Specifically, heavy tread trail maintenance will include: Removal and reshaping berms as needed, pulling in material from undesirable berms and reincorporating into tread and compacting, correcting damage that corrupts drainage patterns, reshaping the trail to the original insloped/outsloped condition and controlling surface drainage to prevent further degradation of the trail. All dips will be reconstructed as shown in the drawings. Additional surface aggregate may be needed to supplement pulled-in slough material that is recaptured, watered (as determined by the COR) and compacted within specifications and tolerances. Such surfacing aggregate will include:

The FS estimates at least an annual need of approximately 100 tons of the above aggregates for each trail system (5 trail systems, i.e., 500 tons minimally) Task Orders under this section will specify types of aggregate surfacing to be applied.

920 Additional appurtenant trail structures shall be maintained within NORMAL and HEAVY tread trail maintenance pay item and may include in each task order the following additional requests separately priced:

920.1 AASHTO #8,

920.2 AASHTO #10

920.3 DSA Limestone

920.4 PA 2A

920.5 AASHTO #3 (PA 3A)

920.6 AASHTO #3 Limestone (PA 3A Limestone)

Section 921 - Culverts Arch Pipe Culverts Description

921.01 Work. Work consists of furnishing and installing arch pipe culverts, including excavation and backfill, selecting and hauling of rock materials, and constructing catch basins and headwalls.

Materials

921.02 Requirements. Use materials meeting the requirements of the following sections:

961—Rock, Grid Pavement Units, and Aggregate 962—Material for Timber Structures 963—Drainage Pipe – Special Project Spec. Section 963.09 Plastic Arch Pipe Culvert 964—Geosynthetics Construction

912.03 Excavation and Embankment. Perform excavation and embankment in accordance with Section 912.

921.04 Placement. Place culverts to provide for unobstructed inlet and outlet flow. Remove logs, debris, soil, rock, and other obstructions above and below the culvert that would impede flow into the culvert or away from the trailway. Minimize disturbance to streambeds.

Construct a catch basin to facilitate flow from trail ditches into the culvert when

DESIGNATED ON THE GROUND BY THE COR.

921.05 Arch Pipe Culverts. Install arch pipe culverts at the locations SHOWN ON THE DRAWINGS or as DESIGNATED ON THE GROUND BY THE COR.

(a) Placing. Place culverts at stream crossings on the natural stream banks or as DESIGNATED ON THE GROUND BY THE COR.

(b) Foundation. Excavate and remove all unsuitable material and rocks over 3 inches for the arch pipe culvert footings.

Firmly embed lower arch pipe culvert footings on stable foundation of undisturbed or compacted soil.

921.06 Backfilling Culverts. Backfill and compact in lifts around the arch culvert’s exterior chamber footing with suitable material that is free of rocks over 3 inches. Provide for the cover height as SHOWN ON THE DRAWINGS.

921.07 Headwalls. Install headwalls and nonwoven geotextile fabric between the backfill material and the rock headwall at the locations SHOWN ON THE DRAWINGS or as

DESIGNATED ON THE GROUND BY THE COR.

Provide a compacted bench a minimum of 6 inches below the existing ground for the foundation of the headwall.

Select rocks that have a general rectangular shape with flat top and bottom faces. Place the largest rocks on the bottom. Lay each rock stable on the course that supports it, interlocking with surrounding rocks. Do not break, jar, or displace rocks already set. Place the exposed face of each rock parallel to the face of the wall. Stagger vertical joints a minimum of 4 inches horizontally from vertical joints in adjoining courses.

91116 Obliteration of abandoned/unauthorized trail by removing existing trail and trail structures and also backfilling any resulting trenches, holes or pits 91217 Hazard tree removal for dead or snagged trees posing a safety issue for riders as identified by the COR 98101 Seeding and mulching disturbed sites to ensure protection of the soil resource within 14 days of disturbance 98202 Installation of 36” staked silt fencing or staked straw bale sediment structures to collect sediment 98202-1 Riprap R-3 98202-2 Riprap R-4 98202-3 Riprap R-5 98901 Government furnished surfacing aggregate, Loading, unloading and transportation of government furnished materials to a trail location determined by the COR

2.0 Reserved

3.0 Requirements

3.1 Work Outside Regular Hours

Except as may otherwise be specified, all work must be performed during regular hours. If the Contractor desires to carry on work on Saturday, Sunday, holidays, or outside regular hours, he/she may submit application to the ACO for approval.

3.2 Management

The Contractor must manage the total work effort associated with the grounds maintenance services required herein to assure fully adequate and timely completion of these services. Included in this function will be a full range of management duties including, but not limited to, planning, scheduling, report preparation, and quality control. The Contractor must provide an adequate staff of personnel with the necessary management expertise to assure the performance of the work in accordance with sound and efficient management practices.

3.2.1 Work Control

The Contractor must implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking of work in progress. The Contractor must plan and schedule work to assure labor, equipment, and material are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and status reports must be provided when requested by the Government Representative.

3.3 Continuity of Services.

To ensure continuity of essential services, the successful bidder must be prepared to fully commence work on the start date of this contract, and should not assume that Government or previous Contractor employees will be available to guide, direct, or specifically orientate each Contractor employee.

3.4 Maintenance Level I (Administrative Areas)

The Contractor must provide trails maintenance services in maintenance level I areas at the times and frequencies specified in Attachment [INSERT ATTACHMENT NUMBER]. Attachment [INSERT ATTACHMENT NUMBER] provides information of the size, location, and layout of the land parcels which make up maintenance level I areas.

3.8 Indefinite Quantity Work Items

All indefinite quantity work items will be ordered using SF 1442, as specified in the "ORDERING OF WORK" clause, Section G. Details of the work required will accompany the SF 1442, giving exact location and type work to be accomplished. The Contractor must be required to complete the required services within the timeframes specified in Attachment [INSERT ATTACHMENT NUMBER].

4.1 Government Furnished Facilities

(2) The Government will not provide office space operational facilities, or lay down areas to the Contractor. The Contractor must secure and maintain the necessary office space, facilities, and equipment storage areas required for the performance of this contract at his/her own expense.

4.2 Government Furnished Equipment

1. The Contractor must furnish all tools and equipment required for the performance of this contract. The Government will not provide tools or equipment to the Contractor.

4.3 Government Furnished Material

1. The Government will not provide any materials to the Contractor.

4.4 Availability of Utilities

The Government will furnish the following utility services at existing outlets for use in those facilities provided by the Government and as may be required for the work to be performed under the contract: electricity, steam, natural gas, fresh water, and sewage service. Information concerning the location of existing outlets may be obtained from the Government Representative. The Contractor must provide and maintain, at his/her expense, the necessary service lines from existing Government outlets to the site of work.

1. Utilities specified above will be furnished at no cost to the Contractor.

2. The Contractor must be responsible for instructing employees in utilities conservation practices. Water faucets or valves must be turned off after the required usage has been accomplished. To conserve water, only the minimum quantity of water needed for the required usage must be expended.

4.5 Contractor Furnished Items

Except for the items listed in the "GOVERNMENT FURNISHED PROPERTY AND SERVICES" clause, the Contractor must provide all equipment, materials, and services to perform the requirements of this contract. The Contractor must ensure that all items furnished exclusively for use in support of government contracts are:

· Less toxic or non-toxic.

Examples include:

· Environmental Protection Agency’s Design for the Environment (DfE) label (http://www.epa.gov/dfe)

· Green Seal certified (http://www.greenseal.org)

· CRI Green Label (http://www.carpet-rug.org/commercial-customers/green-building-and-the-environment/green-label-plus)

· Products that meet/exceed DfE, Green Seal, CRI Green Label, and/or SCAQMD specifications;

· Environmental Protection Agency designated recycled content items (http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm);

· Designated as BioPreferred by the U.S. Department of Agriculture (http://www.biopreferred.gov);

· WaterSense certified (http://www.epa.gov/WaterSense) or meets/exceeds WaterSense specifications.

· Non-ozone depleting chemical substitutes identified by the Environmental Protection Agency’s Significant New Alternatives Policy (SNAP) (http://www.epa.gov/ozone/snap/index.html)

These program elements are described on the Office of the Federal Environment Executive website (http://www.ofee.gov).

5.0 Definitions

As used throughout this sow, the following terms must have the meaning set forth below. Additional definitions are in the "DEFINITIONS" clause, Section I.

a. Where "as shown", "as indicated", "as detailed", or words of similar import are used, it must be understood that reference is made to this specification and the drawings accompanying this specification unless stated otherwise.

b. Where "as directed", "as required", "as permitted", "approval", "acceptance", or words of similar import are used, it must be understood that direction, requirement, permission, approval, or acceptance of the ACO is intended unless stated otherwise.

c. Administrative Contracting Officer (ACO). The individual designated by the Contracting Officer to administer the contract. Throughout this contract, the term ACO will be used to refer to the individual designated to administer the contract or his/her designated representative. See the "DEFINITIONS" clause, Section I.

d. Contractor. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor must ensure that his/her subcontractors comply with the provisions of this contract.

e. Contractor Representative. A foreman, superintendent, or manager assigned in accordance with the "CONTRACTOR EMPLOYEES" clause, Section H.

f. Contract Discrepancy Report (CDR). A report issued by the ACO to the Contractor when performance is unsatisfactory. The Contract Discrepancy Report requires the Contractor to explain, in writing, why performance is unsatisfactory, how performance will be returned to satisfactory levels, and how reoccurrence of the problem will be prevented in the future.

g. Debris. Debris includes, but is not limited to, paper, cans, bottles, limbs, pine straw and pine cones, leaves, rocks, and other similar items.

h. Diameter at Breast Height (DBH). Diameter at Breast Height, as measured 4.5 feet above ground level.

i. Engineered Performance Standards (EPS). Engineered Performance Standards is a Department of Defense standard for determining man-hour requirements to perform various types of maintenance, repair, and housekeeping tasks.

j. Environmental Protection Agency (EPA). The Federal agency delegated with authority to enforce the Federal laws which are concerned with pollution of the environment.

k. Fertilization. Fertilization is the process of applying nutrient elements to the soil where the soil has become deficient in nutrients essential for proper plant growth.

l. Government Representative. The person(s) whom the ACO will designate by name and/or position title to conduct liaison between the Contractor and the ACO on matters pertinent to this contract and be his/her authorized representative.

m. Grass Cutting. Grass cutting must include cutting and trimming, within the designated area, all grasses, weeds, and other vegetation which is one inch or less in diameter (at ground level).

n. Maintenance Level. A designation used to specify the frequency of services and type of grounds maintenance required on a land parcel.

o. Parcel. A given area of land. Each area shown on maps accompanying this specification is divided into various parcels.

p. Pruning. Pruning is selectively removing unwanted growth to make a plant or tree grow or respond in a desired manner. Pruning differs from "shearing". Pruning involves selection and judgment. "Shearing" means clipping all growth on a plant at a uniform distance and shape.

q. Quality Assurance Program. A program implemented by the Government to provide some measure and control over the quality of services received. It is emphasized that the Government's quality assurance program is not a substitute for the quality control program implemented and administered by the Contractor.

r. Quality Assurance Evaluator (QAE). The Government employee responsible for the daily monitoring of Contractor performance.

s. Quality Control (QC). A method used by the Contractor to control quality of goods and/or services provided.

t. Regular Hours. The Government's regular (normal) hours are from 7am to 4pm, Mondays through Fridays, except (a) Federal Holidays and (b) other days specifically designated by the ACO.