Schedule of Items Template.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Allegheny National Forest ATV Trail Maintenance Federal contract opportunity
Solicitation number
1090204
Issued by
Department of Agriculture Forest Service R9-Eastern Region

View the file

Other files for this federal contract opportunity

Other files attached to Allegheny National Forest ATV Trail Maintenance, newest first.
File Type Posted
2023 Timberline B Loop..jpeg JPEG file
solicitation updated.pdf PDF
2023 Timberline B Loop.jpeg JPEG file
Statement of work.docx DOCX document
Timberline C Loop Site 4.jpg JPG image
Timberline C Loop Site 3.jpg JPG image
Schedule of Items Timberline C Loop ATV 2023.docx DOCX document
Timberline C Loop Site 5.jpg JPG image
Timberline C Loop Site 2.jpg JPG image
Timberline C Loop Site 1.jpg JPG image
Schedule of Items 1-20-2023 (Timberline OHV B loop Trail).docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

INSTRUCTIONS: HOW TO USE THIS FORM

Independent Government Estimate (IGE)
No specific format is required for an IGE; however this must be an independent estimate and not a reiteration of a contractor quote. The selected format should generally be in the same level of detail and manner that the Schedule of Items pricing we request from contractors. The estimate should state any underlying assumptions or rationale used in formulating the estimate. Initially the CO will use the IGE to determine the estimated value of the procurement and to identify the appropriate procurement thresholds applicable to the solicitation. Later the IGE is compared to prices received to evaluate an offeror’s understanding of the government requirements and in supporting a price reasonableness determination.

EXPLANATION OF TABS

Stand Alone IGE:Use if the below do not apply to your requirement.
Stand Alone IGE w/options:Use if you have a requirement where you know you have an ongoing/recurring need year after year.
IDIQ:Use if you have a need that is reoccurring or multi-year requirement.
Task Order:Use if you want to issue a order against an existing contract or agreement.

CONTRACT (NO OPTIONS)

FILL OUT THE AREAS IN RED BELOW
SCHEDULE OF ITEMS

(Justin Woldt) Marienville/Allegheny National Forest/ATV trail maintenance PROJECT TITLE: (ATV Trail Maintenance) WORKPLAN ACQUISITION PLAN/REQUISITION NO: (acquisition ID # 612533)

Period of Performance (Required for Services and A&E)1/17/2023 - 5/25/2023
Anticipated Delivery Date (Required for Supply and Construction)Delivery Date
SCHEDULE OF ITEMS
ITEM
NUMBERDESCRIPTIONPAY UNITEST QTY
90701MobilizationMI0.21
910Trailway
91106.1Normal Tread MaintenanceMI0.21
91106.2Heavy Tread MaintenanceLF1,296
920Additional appurtenant trail structures shall be maintained with in Normal and Heavy tread trail maintenance pay item and may include in each task order the following additional requests separately prided:
920.1AASHTO #8T0
920.2AASHTO #10T0
920.3DSA LimestoneT50
920.4PA 2AT110
920.5AASHTO #3 (PA 3A)T0
920.6AASHTO #3 Limestone (PA 3A Limestone)T0
921Culverts
921.01Work consists of furnishing and installing culverts, including excavation and backfill, selecting and hauling of rock materials, and constructing catch basins and headwalls.EA6
91116Obliteration of abandoned/unauthorized trail by removing existing trail and trail structures and also backfilling any resulting trenches, holes, or pitsLF0
91217Hazard tree removal for dead or snagged trees posing a safety issues for riders as identified by the COREA0
98101Seeding and mulching disturbed sites to ensure protection of the soil resource within 14 days of disturbanceAC0
98202Installation of 36" staked silt fencing or staked straw bale sediment structures to collect sedimentLF0
98202.1Riprap Size R-3T88
98202.2Riprap Size R-4T0
98202.3Riprap Size R-5T0
98901Government furnished surfacing aggregate, Loading, unloading and transportation of government furnished materials to a trail location determined by the CORLF
EA - EACH

MO - MONTH Award anticipated to be a firm fixed price contract.

CONTRACT (WITH OPTION YRS)

FILL OUT THE AREAS IN RED BELOW

SCHEDULE OF ITEMS

(Justin Woldt) Marienville/Allegheny National Forest/ATV Trail Maintenance PROJECT TITLE: (ATV Trail Maintenance) WORKPLAN ACQUISITION PLAN/REQUISITION NO: (acquisition ID # 612533)

SCHEDULE OF ITEMS
Period of Performance Base Year: MM/DD/YR – MM/DD/YR
ITEM
NUMBERDESCRIPTIONPAY UNITEST QTY
90701MobilizationMI
910Trailway
91106.1Normal Tread MaintenanceMI
91106.2Heavy Tread MaintenanceLF
920Additional appurtenant trail structures shall be maintained with in Normal and Heavy tread trail maintenance pay item and may include in each task order the following additional requests separately prided:
920.1AASHTO #8T
920.2AASHTO #10T
920.3DSA LimestoneT
920.4PA 2AT
920.5AASHTO #3 (PA 3A)T
920.6AASHTO #3 Limestone (PA 3A Limestone)T
91116Obliteration of abandoned/unauthorized trail by removing existing trail and trail structures and also backfilling any resulting trenches, holes, or pitsLF
91217Hazard tree removal for dead or snagged trees posing a safety issues for riders as identified by the COREA
98101Seeding and mulching disturbed sites to ensure protection of the soil resource within 14 days of disturbanceAC
98202Installation of 36" staked silt fencing or staked straw bale sediment structures to collect sedimentLF
98202.1Riprap Size R-3T
98202.2Riprap Size R-4T
98202.3Riprap Size R-5T
98901Government furnished surfacing aggregate, Loading, unloading and transportation of government furnished materials to a trail location determined by the CORLF
Period of Performance Option Year 1: MM/DD/YR – MM/DD/YR
ITEM
NUMBERDESCRIPTIONPAY UNITEST QTY
90701MobilizationMI
910Trailway
91106.1Normal Tread MaintenanceMI
91106.2Heavy Tread MaintenanceLF
920Additional appurtenant trail structures shall be maintained with in Normal and Heavy tread trail maintenance pay item and may include in each task order the following additional requests separately prided:
920.1AASHTO #8T
920.2AASHTO #10T
920.3DSA LimestoneT
920.4PA 2AT
920.5AASHTO #3 (PA 3A)T
920.6AASHTO #3 Limestone (PA 3A Limestone)T
91116Obliteration of abandoned/unauthorized trail by removing existing trail and trail structures and also backfilling any resulting trenches, holes, or pitsLF
91217Hazard tree removal for dead or snagged trees posing a safety issues for riders as identified by the COREA
98101Seeding and mulching disturbed sites to ensure protection of the soil resource within 14 days of disturbanceAC
98202Installation of 36" staked silt fencing or staked straw bale sediment structures to collect sedimentLF
98202.1Riprap Size R-3T
98202.2Riprap Size R-4T
98202.3Riprap Size R-5T
98901Government furnished surfacing aggregate, Loading, unloading and transportation of government furnished materials to a trail location determined by the CORLF
Period of Performance Option Year 2: MM/DD/YR – MM/DD/YR
ITEM
NUMBERDESCRIPTIONPAY UNITEST QTY
90701MobilizationMI
910Trailway
91106.1Normal Tread MaintenanceMI
91106.2Heavy Tread MaintenanceLF
920Additional appurtenant trail structures shall be maintained with in Normal and Heavy tread trail maintenance pay item and may include in each task order the following additional requests separately prided:
920.1AASHTO #8T
920.2AASHTO #10T
920.3DSA LimestoneT
920.4PA 2AT
920.5AASHTO #3 (PA 3A)T
920.6AASHTO #3 Limestone (PA 3A Limestone)T
91116Obliteration of abandoned/unauthorized trail by removing existing trail and trail structures and also backfilling any resulting trenches, holes, or pitsLF
91217Hazard tree removal for dead or snagged trees posing a safety issues for riders as identified by the COREA
98101Seeding and mulching disturbed sites to ensure protection of the soil resource within 14 days of disturbanceAC
98202Installation of 36" staked silt fencing or staked straw bale sediment structures to collect sedimentLF
98202.1Riprap Size R-3T
98202.2Riprap Size R-4T
98202.3Riprap Size R-5T
98901Government furnished surfacing aggregate, Loading, unloading and transportation of government furnished materials to a trail location determined by the CORLF
Period of Performance Option Year 3: MM/DD/YR – MM/DD/YR
ITEM
NUMBERDESCRIPTIONPAY UNITEST QTY
3001
3002
3003
3004
3005
3006
Period of Performance Option Year 4: MM/DD/YR – MM/DD/YR
ITEM
NUMBERDESCRIPTIONPAY UNITEST QTY
4001
4002
4003
4004
4005
4006
EA - EACH

MO - MONTH Award anticipated to be a firm fixed price contract.

File details come from the government source that posted it. Updated .