Schedule of Items Template.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Allegheny National Forest ATV Trail Maintenance Federal contract opportunity
- Solicitation number
- 1090204
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2023 Timberline B Loop..jpeg | JPEG file | |
| solicitation updated.pdf | ||
| 2023 Timberline B Loop.jpeg | JPEG file | |
| Statement of work.docx | DOCX document | |
| Timberline C Loop Site 4.jpg | JPG image | |
| Timberline C Loop Site 3.jpg | JPG image | |
| Schedule of Items Timberline C Loop ATV 2023.docx | DOCX document | |
| Timberline C Loop Site 5.jpg | JPG image | |
| Timberline C Loop Site 2.jpg | JPG image | |
| Timberline C Loop Site 1.jpg | JPG image | |
| Schedule of Items 1-20-2023 (Timberline OHV B loop Trail).docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
INSTRUCTIONS: HOW TO USE THIS FORM
| Independent Government Estimate (IGE) |
| No specific format is required for an IGE; however this must be an independent estimate and not a reiteration of a contractor quote. The selected format should generally be in the same level of detail and manner that the Schedule of Items pricing we request from contractors. The estimate should state any underlying assumptions or rationale used in formulating the estimate. Initially the CO will use the IGE to determine the estimated value of the procurement and to identify the appropriate procurement thresholds applicable to the solicitation. Later the IGE is compared to prices received to evaluate an offeror’s understanding of the government requirements and in supporting a price reasonableness determination. |
EXPLANATION OF TABS
| Stand Alone IGE: | Use if the below do not apply to your requirement. |
| Stand Alone IGE w/options: | Use if you have a requirement where you know you have an ongoing/recurring need year after year. |
| IDIQ: | Use if you have a need that is reoccurring or multi-year requirement. |
| Task Order: | Use if you want to issue a order against an existing contract or agreement. |
CONTRACT (NO OPTIONS)
| FILL OUT THE AREAS IN RED BELOW |
| SCHEDULE OF ITEMS |
(Justin Woldt) Marienville/Allegheny National Forest/ATV trail maintenance PROJECT TITLE: (ATV Trail Maintenance) WORKPLAN ACQUISITION PLAN/REQUISITION NO: (acquisition ID # 612533)
| Period of Performance (Required for Services and A&E) | 1/17/2023 - 5/25/2023 | |||
| Anticipated Delivery Date (Required for Supply and Construction) | Delivery Date | |||
| SCHEDULE OF ITEMS | ||||
| ITEM | ||||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY | |
| 90701 | Mobilization | MI | 0.21 | |
| 910 | Trailway | |||
| 91106.1 | Normal Tread Maintenance | MI | 0.21 | |
| 91106.2 | Heavy Tread Maintenance | LF | 1,296 | |
| 920 | Additional appurtenant trail structures shall be maintained with in Normal and Heavy tread trail maintenance pay item and may include in each task order the following additional requests separately prided: | |||
| 920.1 | AASHTO #8 | T | 0 | |
| 920.2 | AASHTO #10 | T | 0 | |
| 920.3 | DSA Limestone | T | 50 | |
| 920.4 | PA 2A | T | 110 | |
| 920.5 | AASHTO #3 (PA 3A) | T | 0 | |
| 920.6 | AASHTO #3 Limestone (PA 3A Limestone) | T | 0 | |
| 921 | Culverts | |||
| 921.01 | Work consists of furnishing and installing culverts, including excavation and backfill, selecting and hauling of rock materials, and constructing catch basins and headwalls. | EA | 6 | |
| 91116 | Obliteration of abandoned/unauthorized trail by removing existing trail and trail structures and also backfilling any resulting trenches, holes, or pits | LF | 0 | |
| 91217 | Hazard tree removal for dead or snagged trees posing a safety issues for riders as identified by the COR | EA | 0 | |
| 98101 | Seeding and mulching disturbed sites to ensure protection of the soil resource within 14 days of disturbance | AC | 0 | |
| 98202 | Installation of 36" staked silt fencing or staked straw bale sediment structures to collect sediment | LF | 0 | |
| 98202.1 | Riprap Size R-3 | T | 88 | |
| 98202.2 | Riprap Size R-4 | T | 0 | |
| 98202.3 | Riprap Size R-5 | T | 0 | |
| 98901 | Government furnished surfacing aggregate, Loading, unloading and transportation of government furnished materials to a trail location determined by the COR | LF | ||
| EA - EACH |
MO - MONTH Award anticipated to be a firm fixed price contract.
CONTRACT (WITH OPTION YRS)
FILL OUT THE AREAS IN RED BELOW
SCHEDULE OF ITEMS
(Justin Woldt) Marienville/Allegheny National Forest/ATV Trail Maintenance PROJECT TITLE: (ATV Trail Maintenance) WORKPLAN ACQUISITION PLAN/REQUISITION NO: (acquisition ID # 612533)
| SCHEDULE OF ITEMS | |||
| Period of Performance Base Year: MM/DD/YR – MM/DD/YR | |||
| ITEM | |||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY |
| 90701 | Mobilization | MI | |
| 910 | Trailway | ||
| 91106.1 | Normal Tread Maintenance | MI | |
| 91106.2 | Heavy Tread Maintenance | LF | |
| 920 | Additional appurtenant trail structures shall be maintained with in Normal and Heavy tread trail maintenance pay item and may include in each task order the following additional requests separately prided: | ||
| 920.1 | AASHTO #8 | T | |
| 920.2 | AASHTO #10 | T | |
| 920.3 | DSA Limestone | T | |
| 920.4 | PA 2A | T | |
| 920.5 | AASHTO #3 (PA 3A) | T | |
| 920.6 | AASHTO #3 Limestone (PA 3A Limestone) | T | |
| 91116 | Obliteration of abandoned/unauthorized trail by removing existing trail and trail structures and also backfilling any resulting trenches, holes, or pits | LF | |
| 91217 | Hazard tree removal for dead or snagged trees posing a safety issues for riders as identified by the COR | EA | |
| 98101 | Seeding and mulching disturbed sites to ensure protection of the soil resource within 14 days of disturbance | AC | |
| 98202 | Installation of 36" staked silt fencing or staked straw bale sediment structures to collect sediment | LF | |
| 98202.1 | Riprap Size R-3 | T | |
| 98202.2 | Riprap Size R-4 | T | |
| 98202.3 | Riprap Size R-5 | T | |
| 98901 | Government furnished surfacing aggregate, Loading, unloading and transportation of government furnished materials to a trail location determined by the COR | LF |
| Period of Performance Option Year 1: MM/DD/YR – MM/DD/YR | |||
| ITEM | |||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY |
| 90701 | Mobilization | MI | |
| 910 | Trailway | ||
| 91106.1 | Normal Tread Maintenance | MI | |
| 91106.2 | Heavy Tread Maintenance | LF | |
| 920 | Additional appurtenant trail structures shall be maintained with in Normal and Heavy tread trail maintenance pay item and may include in each task order the following additional requests separately prided: | ||
| 920.1 | AASHTO #8 | T | |
| 920.2 | AASHTO #10 | T | |
| 920.3 | DSA Limestone | T | |
| 920.4 | PA 2A | T | |
| 920.5 | AASHTO #3 (PA 3A) | T | |
| 920.6 | AASHTO #3 Limestone (PA 3A Limestone) | T | |
| 91116 | Obliteration of abandoned/unauthorized trail by removing existing trail and trail structures and also backfilling any resulting trenches, holes, or pits | LF | |
| 91217 | Hazard tree removal for dead or snagged trees posing a safety issues for riders as identified by the COR | EA | |
| 98101 | Seeding and mulching disturbed sites to ensure protection of the soil resource within 14 days of disturbance | AC | |
| 98202 | Installation of 36" staked silt fencing or staked straw bale sediment structures to collect sediment | LF | |
| 98202.1 | Riprap Size R-3 | T | |
| 98202.2 | Riprap Size R-4 | T | |
| 98202.3 | Riprap Size R-5 | T | |
| 98901 | Government furnished surfacing aggregate, Loading, unloading and transportation of government furnished materials to a trail location determined by the COR | LF |
| Period of Performance Option Year 2: MM/DD/YR – MM/DD/YR | |||
| ITEM | |||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY |
| 90701 | Mobilization | MI | |
| 910 | Trailway | ||
| 91106.1 | Normal Tread Maintenance | MI | |
| 91106.2 | Heavy Tread Maintenance | LF | |
| 920 | Additional appurtenant trail structures shall be maintained with in Normal and Heavy tread trail maintenance pay item and may include in each task order the following additional requests separately prided: | ||
| 920.1 | AASHTO #8 | T | |
| 920.2 | AASHTO #10 | T | |
| 920.3 | DSA Limestone | T | |
| 920.4 | PA 2A | T | |
| 920.5 | AASHTO #3 (PA 3A) | T | |
| 920.6 | AASHTO #3 Limestone (PA 3A Limestone) | T | |
| 91116 | Obliteration of abandoned/unauthorized trail by removing existing trail and trail structures and also backfilling any resulting trenches, holes, or pits | LF | |
| 91217 | Hazard tree removal for dead or snagged trees posing a safety issues for riders as identified by the COR | EA | |
| 98101 | Seeding and mulching disturbed sites to ensure protection of the soil resource within 14 days of disturbance | AC | |
| 98202 | Installation of 36" staked silt fencing or staked straw bale sediment structures to collect sediment | LF | |
| 98202.1 | Riprap Size R-3 | T | |
| 98202.2 | Riprap Size R-4 | T | |
| 98202.3 | Riprap Size R-5 | T | |
| 98901 | Government furnished surfacing aggregate, Loading, unloading and transportation of government furnished materials to a trail location determined by the COR | LF |
| Period of Performance Option Year 3: MM/DD/YR – MM/DD/YR | |||
| ITEM | |||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY |
| 3001 | |||
| 3002 | |||
| 3003 | |||
| 3004 | |||
| 3005 | |||
| 3006 |
| Period of Performance Option Year 4: MM/DD/YR – MM/DD/YR | |||
| ITEM | |||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY |
| 4001 | |||
| 4002 | |||
| 4003 | |||
| 4004 | |||
| 4005 | |||
| 4006 | |||
| EA - EACH |
MO - MONTH Award anticipated to be a firm fixed price contract.