This statement of work outlines snow and ice removal services required by the United States Coast Guard Sector Lake Michigan. The contractor will be responsible for plowing, de-icing, and sanding all paved areas, entrances, walkways and sidewalks to ensure access and safety. Additional requirements include curb installation, property inspections, damage reporting and repair, as well as turf reseeding. The period of performance is from November 1, 2023 to May 31, 2024. Work hours are generally 6:00 am to 6:00 pm CST Monday through Friday, though additional hours may be required. The solicitation number for this opportunity is 37240PR230000079 and was issued by the Department of Homeland Security United States Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12a - SF 30 - AMENDMENT OF SOLICITATION 2.pdf | ||
| 12a - REVISED STATEMENT OF WORK 19OCT23.doc | DOC document | |
| 12a - RFI VENDOR QUESTION AND ANSWER 2.docx | DOCX document | |
| 12a - RFI VENDOR QUESTION AND ANSWER - EXAMPLE.docx | DOCX document | |
| 12A - SF 30 - AMENDMENT OF SOLICITATION.pdf | ||
| 12a - SITE VISIT INFORMATION.pdf | ||
| PAST PERFORMANCE EVALUATION.docx | DOCX document | |
| WAGE DETERMINATION.pdf | ||
| FAR MATRIX - SERVICE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR #:
STATEMENT OF WORK
STATEMENT OF WORK (SOW)
FOR
USCG SECTOR LAKE MICHIGAN
Snow & Ice Removal <Contracting Officer enter final date solicitation is released>
1.0 GENERAL
United States Coast Guard Sector Lake Michigan is planning to enter into negotiations with a contractor. The USCG is seeking a qualified contractor to provide snowplowing and snow removal services along with sanding and de-icing for the winter 2023/2024. Prior to submitting a quote, it is mandatory to examine the SOW and it is highly recommended to visit the facility to take field evaluations of the Sector grounds, and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Sector Lake Michigan.
1.1 Background
Sector Lake Michigan has parking lots, driveways, walkways and piers located throughout sector property. Sector Lake Michigan is looking for a contractor to provide snow/ice removal during the winter season and a spring sweeping of lots/driveways, walkways and piers at the end of the snow season.
1.2 Scope
Contractor shall preform the following:
1. Contractor shall provide all labor, materials and equipment needed to complete work
2. Contractor shall ensure all safety precautions are taken prior to and during lawn and shrub maintenance to ensure the safety of Contractor personnel and USCG Sector Lake Michigan presonnel.
3. Contractor shall plow and de-ice all paved areas, entrances, clearing/de-icing of all walkways, sidewalks to permit access and movement of staff and visitors.
4. At no time, shall there be a hazardous/life safety condition.
5. Contractor will be responsible for snow/ice removal during operating and non-operationg hours and ensuring final cleanup of all snow after each snowfall event.
6. Snow removal must include at least one de-icing application of the sector property upon the conclusion of the snowfall event.
7. After each storm, the contractor will sand and de-ice.
8. Additional de-icing applications will be applied to the sector property as needed to maintain access and safe conditions.
9. Contractor to install curb indicators before the first snowfall.
10. Contractor will inspect Property for pre-existing damage and submit a report detailing all pre-existing damage by commencement of contract award.
11. Contractor will report any property damage caused by the contractor as soon as physically possible after each storm or when visible. Damage will include, but is not limited to: curbing, shrubs, trees, turf, paving, manholes, catch basins, street shut offs, buildings, props, doors, fencing, walls, walkways, parking lot lighting, signs, vents, hydrants, etc. Contractor will repair all damage.
12. In the event the contractor damages any turf by snow plowing or ice removal the contractor will re-seed the damaged turf in the spring, no later than 15 May 2024.
13. The contractor shall not use Coast Guard dumpsters or any waste receptacles for disposal of debris.
1.3 OBJECTIVE
Annual USCG Sector Lake Michigan Snowplowing and snow/ice removal contract.
2.0 CONTRACTOR PERSONNEL
1. Contractor shall provide a list of names to the Coast Guard POC for access to the base.
2. All personnel shall present ID to the OOD/JOOD at the entrance to the base.
2.1 QUALIFIED PERSONNEL
The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
2.2 CONTINUITY OF SUPPORT
The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.
2.3 EMPLOYEE CONDUCT
Contractor’s employees shall comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees present a professional appearance at all times and that their conduct shall not reflect discredit on the United States or the Department of Homeland Security. The Project Manager shall ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.
2.4 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
3.0 Period of Performance
The period of performance for this contract shall be from 01 November 2023 thru 31 May 2024, unless otherwise approved by the contracting officer.
3.1 PLACE OF PERFORMANCE
The primary place of performance will be:
USCG Sector Lake Michigan
2420 South Lincoln Memorial Dr.
Milwaukee, WI 53207
3.2 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 6:00 am and 6:00 pm CST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.
4.0 GOVERNMENT FURNISHED RESOURCES
The Government will not furnish any resources to the Contractor in support of this contract.
5.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract.
6.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
6.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
6.2 The Contractor shall have 10 business days to make corrections and redeliver.
08/14/2023