Statement of Work - Aero Club Aircraft Painting.pdf
PDF 87 KB Posted
- Attached to
- Aircraft Painting - Two Piper Warrior Aircraft
- Solicitation number
- FA283525R0007
About this file
This Statement of Work (SOW) details the comprehensive painting and restoration services for two Piper Warrior aircraft (N8137Q and N43128) at Hanscom Air Force Base. The scope of work includes a detailed multi-step process involving chemical stripping, surface preparation, priming, painting with Matterhorn White base coat, applying trim colors, resealing windows, polishing bright work, and reinstalling flight control surfaces with manufacturer-specified balancing. The contractor will be responsible for all materials and labor, with specific requirements including using approved primers (Epoxy 23777 or equivalent) and paints (Dupont Emron or Sherman Williams Jet Glow), maintaining $1,000,000 in liability insurance, and completing the project within 45-60 working days.
The project involves aircraft transportation by an Aero Club pilot between Hanscom Field in Bedford, MA and the contractor's location, with per diem and lodging expenses determined upon contractor selection. Key contacts include Rodmen Scott Hill, Director of Maintenance (781-225-5851), and Elizabeth Settipani-Rufo for contract matters (781-225-1472). The solicitation (FA283525R0007) is issued by the Department of the Air Force Materiel Command Lifecycle Management Center at Hanscom Air Force Base, seeking a contractor to execute the comprehensive aircraft painting and restoration services as specified in the detailed Statement of Work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR AERO CLUB AIRCRAFT
N8137Q Piper Warrior
S/N PA28-8016179 and
N43128 Piper Warrior
S/N PA28-8316095
1. Scope of Work. The contractor will complete an inspection of both aircraft upon arrival for any pre-existing discrepancies and provide a written copy of discrepancies to the Contracting Office at Hanscom AFB. The aircraft will be prepared for chemical stripping by removing primary flight controls and covering all windows, composites, skin laps and any other areas not to be stripped with a protective covering of paper, plastic, and foil. A non-corrosive chemical stripper will be applied as necessary to remove existing paint. Aircraft will then be washed with fresh water; any remaining paint will be removed by hand using an alum-oxide sandpaper and Scotch-Brite or equivalent scuff pads. Aircraft will again be washed with fresh water, acid-etched; a water break test will be performed to ensure cleanliness is 100%. Aircraft will be alodined (or equivalent) and primed with a corrosion resistant primer, painted with two coats of Matterhorn White base coat. Trim colors will be applied to customer’s specifications. All exterior placards will be in accordance with the manufacturer’s (Piper) specifications and Federal Aviation
Administration regulations. The contractor will mirror paint scheme along with lettering per attached pictures. New seam seal will be applied to windows and all bright work will be polished. Flight control surfaces will be removed for the paint process and flight control surfaces will be balanced IAW manufacturer’s recommendations before all items are reinstalled. Weight and balance will be performed at no additional cost to the government. Aircraft will be inspected prior to delivery after painting.
The contractor will furnish all the material and perform all acts required to complete such work as described with the exception of any extra logos or trademarks which are to be supplied by Owner/Authorized Agent, body damage and/or additional work requested.
Owner/Authorized agent will be notified if additional work is needed.
2. Workmanship and Permits All materials will be guaranteed to be as specified and as warranted by the manufacturer. All work will be completed in a workmanlike manner according to standard industry practices. The contractor may subcontract to an authorized FAA licensed technician for all required services on the aircraft, as well as all log entries required by the FAA with respect to the work that will be performed.
3. Design. The work and services shall be performed under the direction of and in accordance with the drawings and specifications provided by the Hanscom Aero Club
Maintenance Director.
4. Time of Completion. The work to be performed under this agreement shall be started upon delivery of the aircraft and substantially completed within 45-60 working days of its inception, except that the time of completion is contingent upon strikes, accidents, performance of subcontractors, availability of material and other delays beyond the contractor’s reasonable control.
5. Change Orders. Any alteration or deviation from the drawings and specifications involving extra costs of material or labor will be undertaken only upon written order by
Contracting Officer, the owner or its authorized agent and may extend the time of completion.
6. Subcontractors. The contractor may engage subcontractors to perform work, provided the contractor will continue to be responsible.
7. Insurance. The contractor will maintain bodily injury liability and property damage insurance in an amount of not less than $1,000,000 (one million dollars) per occurrence. The contractor is responsible for any damage occurring while the aircraft is in the contractor’s possession.
8. Specifications.
Primer – Epoxy 23777 or equivalent
Paint – Dupont Emron or Sherman Williams Jet Glow or equivalent Colors to be equivalent to:
Blue, Jet Glow PN#287C
Red, Jet Glow PN#485
Matterhorn White, Jet Glow PN#G8003W
9. Transport. Aircraft will be flown from Hanscom Field Bedford MA to location of contractor by an Aero Club pilot for work to be accomplished. Aero Club Pilot will return to – Hanscom
Field from contractor location after delivery and return to the contractors’ location when the aircraft is completed and ready for pick-up. Aero Club Pilot will be flown either in an Aero
Club aircraft or by commercial flights, whichever is the most cost effective. Per diem and lodging will be allowed and determined when contractor is selected as per diem is based on location.
Contacts. Point of contact for the Hanscom Aero Club will be Rodmen Scott Hill, Director of
Maintenance at 781-225-5851. POC for any contract matters will be Elizabeth Settipani-Rufo at
781-225-1472 email: elizabeth.settipani-rufo@us.af.mil.
mailto:elizabeth.settipani-rufo@us.af.mil