Statement of Need Flow Meter.pdf
PDF 322 KB Posted
- Attached to
- Non-resettable Flow Meter
- Solicitation number
- FA460026Q0024
About this file
This is a Statement of Need issued by the Department of the Air Force, Headquarters 55th Wing (ACC) at Offutt Air Force Base, Nebraska, dated February 27, 2026.
Offutt Fire and Emergency Services requires the purchase and installation of a non-resettable flow meter at the Fire Department Training Grounds to achieve compliance with the facility's Class II Air Operating Permit. Construction Permit #CP22-020 mandates that Unit 3-8 shall not combust more than 40,000 gallons of propane per any 12 consecutive calendar months, and requires installation of a non-resettable flow meter for propane fuel on the fuel supply lines with calibration according to manufacturer specifications or at least once per calendar year. Noncompliance could result in fines to Offutt AFB and loss of use of the Fire Department Aircraft Trainer, which would severely degrade operational capabilities.
The required flow meter must be non-resettable with totalizer functionality, compatible with 2½" Schedule 40 pipe, capable of calibration, rated for liquid propane, hazardous areas, and continual outside use. The scope of work includes installation on the distribution line from the propane tank to the fire department aircraft training tower, all required electrical hookups, provision of all tools, materials, equipment, permits, and necessary items to complete installation, and a site visit if required. Two potential placement areas are identified in accompanying photographs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS, 55TH WING (ACC)
OFFUTT AIR FORCE BASE, NEBRASKA
Relentless & Ready
CUI
2/27/2026
STATEMENT OF NEED
FROM: 55 CES/CEF
SUBJECT: FLOW METER
1. Offutt Fire and Emergency Services is seeking to purchase and have installed a non-resettable flow meter, with the ability to be calibrated, at the Fire Department Training Grounds.
2. Currently Offutt Fire and Emergency Service have a deficiency for Offutt AFB’s Class II Air Operating Permit, and the deficiency is annotated and tracked in the CE Environmental EASIER Reporting System. The requirement states:
a. Unit 3-8 shall not combust more than 40,000 gal of propane per any period of twelve (12) consecutive calendar months (Construction Permit, #CP22-020, Condition III. (B)(3)(c), issued April 27, 2023).
i. A non-resettable flow meter for propane fuel shall be installed on the fuel supply lines for Unit 3-8. The flow meters shall be calibrated according to manufacturer specifications or at least once per calendar year (Construction Permit, #CP22-020, Condition III.(B)(3)(c)(i), issued April 27, 2023).
3. Noncompliance and/or movement toward compliance could result in fines for Offutt AFB and/or loss of use of the Fire Department Aircraft Trainer. Loss of use of the trainer would have dire consequences for Offutt Fire and Emergency Services and degradation of Offutt AFB’s mission.
4. Requirements:
a. Non-resettable
b. Totalizer
c. Fits on 2 ½” Schedule 40 Pipe
d. Ability to be Calibrated
e. Calibration materials (if user can calibrate)
f. Compatible with liquid propane
g. Rated for use in hazardous areas
h. Rated for continual outside use
5. Scope of Work:
a. Work shall include the installation of the flow meter on the distribution line from the propane tank to the fire department aircraft training tower.
b. All electrical hookups that are required for a fully functioning flow meter.
c. Contractor shall provide all available tools, materials, equipment, permits, and necessary, but unlisted items to perform the installation of the flow meter.
d. If necessary, perform a site visit.
6. Pictures of Area: Shows 2 potential areas of placement