STATEMENT OF BID ITEMS.pdf
PDF 82 KB Posted
- Solicitation number
- 36C25026B0023_A00004
About this file
Statement of Bid Item(s) Summary
This document is a Statement of Bid Items for a federal construction contract. The base bid (Bid Item I) encompasses general construction, alterations, roads, walks, grading, drainage, roofing, roof patching, mechanical and electrical work, removal of existing structures, and interior finishes as shown in drawings and specifications. The total project duration is 245 calendar days after receipt of Notice to Proceed. The Government intends to award on the base bid; however, if base bid costs exceed available funds, award may be made on any one of ten deduct alternate items in descending order of priority, allowing for cost reductions if necessary.
The ten deduct alternates include: (1) removal of ceiling-mounted LED skylight fixtures and replacement with standard light fixtures; (2) removal of digital aquarium fixture; (3) removal of remote plumbing fixtures and replacement with manual plumbing fixtures; (4) removal of streaming audio system and replacement with analog audio system; (5) removal of stone veneer and electric fireplace from room 6D-138; (6) removal of framed decorative panel system; (7) removal of tray ceilings in three specified rooms; (8) removal of resin panels and replacement with impact-resistant wall covering; (9) elimination of all work associated with constructing room 6D-155; and (10) removal of Network Video Recorder, Network Management Software, Video Display, and VSS Workstation from the Security Station. All bid items are priced on a lump sum basis with a consistent 245-calendar-day project duration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA OVER SAT - Chicago Faucets_Redacted.pdf | ||
| 36C25026B0023 A00004.pdf | ||
| Wage Determination 5.18.26.pdf | ||
| VA Dayton 6S MH Pre-Bid RFIs Response Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF BID ITEM(S)
A. BID ITEM I, BASE BID ALL WORK: Work includes general construction, alterations, roads, walks, grading, drainage, roofing, roof patching, mechanical and electrical, necessary removal of existing structures and construction and certain other items and interior finishes shown on the drawings and within specifications. It is the intent of the Government that award will be made on BID ITEM 1 (BASE BID); however, should the bids for the base bid exceed the funds available, award may be made on any one of the following deduct alternate items, in descending order of priority.
Total project duration 245 calendar days after receipt of Notice to Proceed.
Total Bid Item No. 1: $____________________(Lump Sum)
B. BID ITEM II, ALTERNATE NO. 1: All work in Item I, except remove ceiling-mounted LED sky ceiling light fixtures and provide light fixtures in place of simulated skylight fixtures as indicated on drawings.
Total project duration 245 calendar days after receipt of Notice to Proceed.
Total Bid Item No. II: $____________________(Lump Sum)
C. BID ITEM III, ALTERNATE NO. 2: All work in Item I, except remove the digital aquarium fixture and all associated items.
Total Bid Item No. III: $____________________(Lump Sum)
D. BID ITEM IV, ALTERNATE NO. 3: All work in Item I, except remove remote plumbing fixtures and controls for remote operation and replace with plumbing fixtures incapable of remote operation and local manual shutoffs as indicated on drawings.
Total Bid Item No. IV: $____________________(Lump Sum)
E. BID ITEM V, ALTERNATE NO. 4: All work in Item I, except remove the streaming audio system and replace with analog audio system as indicated on drawings.
Total Bid Item No. V: $____________________(Lump Sum)
F. BID ITEM VI, ALTERNATE NO. 5: All work in Item I, except remove stone veneer and electric fireplace from the north wall of room 6D-138. Finish gypsum board partition to match adjacent partitions.
Total Bid Item No. VI: $____________________(Lump Sum)
G. BID ITEM VII, ALTERNATE NO. 6: All work in Item I, except remove framed decorative panel system and finish gypsum board ceiling as indicated on drawings.
Total Bid Item No. VII: $____________________(Lump Sum)
H. BID ITEM VIII, ALTERNATE NO. 7: All work in Item I, except remove tray ceilings in rooms 6D- 102, 6D-116, 6D-138.
Total Bid Item No. VIII: $____________________(Lump Sum)
I. BID ITEM IX, ALTERNATE NO. 8: All work in Item I, except remove resin panels and replace with impact-resistant wall covering as shown in drawings.
Total Bid Item No. IX: $____________________(Lump Sum)
J. BID ITEM X, ALTERNATE NO. 9: All work in Item I, except remove all work associated with constructing room 6D-155. Finish both sides of the partition between from 6D-133 and the existing corridor as scheduled.
Total Bid Item No. X: $____________________(Lump Sum)
K. BID ITEM XI, ALTERNATE NO. 10: Remove the Network Video Recorder, Network Management Software and the Video Display and VSS Workstation associated with the Security Station.
Total Bid Item No. XI: $____________________(Lump Sum)
STATEMENT OF BID ITEM(S)