This is a State Buy America Requirements document issued by the Oregon Department of Transportation (ODOT) for the I-5 MP 189.5-192.2 NB & SB Pave Patching On-Call Region 2 Paving project. The document establishes mandatory domestic preference requirements under Oregon Revised Statutes (ORS) 279C.303, stipulating that all steel, iron, coatings for steel and iron, and manufactured products incorporated into the project must be produced in the United States. For iron and steel products, all manufacturing processes from initial melting through coating application must occur within the United States. For manufactured products, manufacture must occur domestically and U.S.-mined, produced, or manufactured components must comprise more than 55 percent of the total component cost. No de minimis exceptions are permitted, and strict compliance is required for all materials permanently incorporated into the project.
Contractors are required to submit a Certificate of Materials Origin on an ODOT-approved form prior to incorporating applicable materials into the project; materials without such certification will be deemed of foreign origin. The contractor bears full responsibility for compliance with ORS 279C.303 requirements, including compliance by all first-tier subcontractors, lower-tier subcontractors, service providers, and materials suppliers. This provision must be included in all subcontracts. The contract document does not specify pricing terms, funding sources, award dates, or contract duration, as these requirements apply to the broader paving project referenced in the work order title.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5899-0~1.pdf | ||
| Attachment D Amenities Proposal.docx | DOCX document | |
| Attachment C Cost Sheet.docx | DOCX document | |
| Attachment A Sample PO~2.pdf | ||
| Attachment B Offeror Information and Certification Sheet~3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I-5 MP 189.5-192.2 NB& SB Pave Patching On-Call Region 2 Paving PA Series
STATE BUY AMERICA REQUIREMENTS
This Work Order is subject to the domestic preference requirements provided under ORS 279C.303.
Pursuant to ORS 279C.303(2)(a), steel, iron, coatings for steel and iron and “Manufactured Products” purchased for or used in the project, and that become part of a permanent structure must be “Produced in the United States.”
As defined under ORS 279C.303(1)(a), “Manufactured Product” means a preassembled item that is made of iron or steel and that a contractor brings to a construction project for incorporation into a public improvement or public works or a preassembled item that is made of iron or steel and that the Oregon Department of Administrative Services or the Department of Transportation acquires for a public use.
As defined under ORS 279C.303(1)(b), “Produced in the United States” means:
· For iron and steel products, other than Manufactured Products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred within the United States; and
· For Manufactured Products, that:
· The manufacture of the product occurred within the United States; and
· The cost of the components that are mined, produced or manufactured in the United States is more than 55 percent of the total cost of all components of the product.
Before incorporating any applicable materials into the project, Contractor shall submit to Owner a Certificate of Materials Origin, on a form acceptable by ODOT. Unless a Certificate of Materials Origin has been provided to the Owner, the products and materials shall be considered of foreign origin.
No “de minimis” amount has been established for applicable materials permanently incorporated into the project. Strict compliance is required.
Contractor shall include this provision in all subcontracts. Contractor shall be responsible for full compliance with the ORS 279C.303 requirements, including such compliance by any first-tier subcontractor, lower-tier sub-contractor, service provider and materials supplier.