STA Tawas SOW_Heating.docx
DOCX document 43 KB Posted
- Attached to
- Sole Source; Station Tawas Fan Coil Units
- Solicitation number
- 37220PR260000227
About this file
This is a Statement of Work (SOW) for the fabrication and delivery of twenty (20) Enviro Tech VFS-C size 02 fan coil units to U.S. Coast Guard Station Tawas in East Tawas, Michigan. The units serve as direct replacements for existing fan coil units in the facility's hydronic heating and cooling system. Seventeen units must measure 41 inches in length, while three units must measure 51 inches in length; all units shall be 28.75 inches in height and 10.5 inches in depth. The contractor must fabricate vertical, floor-mounted, exposed cabinet units with sloped tops finished in Pearl White Satin color and equipped with closed cell foam insulation, leveling legs, stainless steel coil casings and drain pans with float switches, plastic auxiliary drip pans, stamped louver discharge and return air grills, three-speed switches with off positions, right-handed control enclosures with left-positioned coils, 40-amp non-fused door-interlock disconnects, OC015 main fusing, BC02 24V control packages, one-inch disposable filters with spares, type 01 PSC motors rated at 115/1/60 volts with 1/50 horsepower and 190 CFM airflow, manual air vents, and factory-installed piping packages including two-way valves, PT ports, unions, and Y-strainers.
The contractor must commence fabrication within five days of award and complete delivery within sixty days of award. This is a sole source procurement awarded to Griffin International LLC without competitive bidding under FAR 13.106-1(b)(1) and simplified acquisition procedures, with a firm-fixed price structure. The procurement falls under NAICS code 33341 and PSC 4120, with the Department of Homeland Security U.S. Coast Guard serving as the procuring agency. The Contracting Officer is Kara Davis (kara.a.davis@uscg.mil), and questions regarding the procurement must be submitted via email by July 17, 2026. Installation, system redesign, and facility modifications are not included in this SOW.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JOTFOC STA TAWAS FAN COILS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
STATEMENT OF WORK (SOW)
FOR
U.S Coast Guard Station Tawas Fan Coil Unit Replacement
1.0 GENERAL
1.1 BACKGROUND
The U.S. Coast Guard Station (STA) Tawas operates a facility equipped with an extensive hydronic heating and cooling system, which relies on fan coil units (FCUs) to maintain appropriate environmental conditions throughout the building. The existing FCUs have reached the end of their service life and require replacement to ensure continued operational efficiency and occupant comfort.
To address this need, the project seeks to procure Enviro Tech VFS-C size 02 fan coil units, which are direct replacements for the current units. These units meet the original design specifications and can be integrated into the existing system without requiring modifications to piping, wiring, or electrical services. This approach minimizes disruption to facility operations and avoids the significant costs and complexity associated with redesigning the hydronic system, which would be necessary if alternate coil units were used. Such redesigns would involve changes to wall structures, piping sizes, and electrical interfaces, potentially impacting installation timelines and increasing project risk.
The purpose of this project is to ensure reliable, efficient heating and cooling at STA Tawas by replacing aging FCUs with units that match the facility’s established requirements. This replacement supports ongoing facility maintenance and aligns with the Coast Guard’s broader objectives of maintaining safe, functional, and energy-efficient infrastructure. By selecting direct replacement units, the project leverages past practices and current policies that prioritize compatibility and operational continuity, thereby facilitating a smooth transition and minimizing impacts on station operations.
1.2 SCOPE
This Statement of Work (SOW) covers the fabrication and delivery of twenty (20) vertical, floor-mounted, exposed cabinet fan coil units (Enviro Tech VFS-C size 02) to the U.S. Coast Guard Station Tawas. Seventeen (17) units shall be 41” in length, and three (3) units shall be 51” in length, with all units meeting specified design and material requirements. The contractor is responsible for providing fan coil units that are direct replacements for the existing units, ensuring compatibility with the facility’s current hydronic heating and cooling system, and avoiding the need for modifications to piping, wiring, or electrical services.
The scope of work is limited to the fabrication and delivery of the specified fan coil units to STA Tawas. Installation, system redesign, or any modifications to the facility’s infrastructure are not included in this SOW. The contractor shall not provide alternate coil units or undertake any work beyond the supply and delivery of the specified units.
1.3 OBJECTIVE
The objective of this project is to procure and deliver twenty (20) Enviro Tech VFS-C size 02 fan coil units that serve as direct replacements for the existing units at U.S. Coast Guard Station Tawas. The goal is to ensure continued, reliable, and efficient heating and cooling within the facility by providing fan coil units that fully align with established design specifications and operational requirements. The delivered units will be used to maintain optimal environmental conditions, support ongoing facility maintenance, and uphold the Coast Guard’s standards for safe and functional infrastructure, without requiring modifications to the existing hydronic system.
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 Fan Coil Unit Fabrication
2.1.1 The contractor must provide twenty (20) vertical, floor-mounted, exposed cabinet fan coil units with sloped tops to replace existing units at U.S. Coast Guard Station Tawas.
· Seventeen (17) units must be 41 inches in length, 28.75 inches in height, and 10.5 inches in depth.
· Three (3) units must be 51 inches in length, 28.75 inches in height, and 10.5 inches in depth.
2.1.2 The contractor must fabricate fan coil unit (FCU) cabinets with a sloped top.
2.1.3 The contractor must finish FCU cabinets in Pearl White Satin color.
2.1.4 The contractor must use closed cell foam insulation for FCU cabinets.
2.1.5 The contractor must equip each FCU with leveling legs.
2.1.6 The contractor must provide a 16-gauge front panel for each FCU.
2.1.7 The contractor must include latches for FCU access panels.
2.1.8 The contractor must use stainless steel for FCU coil casing material.
2.1.9 The contractor must use stainless steel for FCU drain pan material and must include a float switch.
2.1.10 The contractor must provide a plastic auxiliary drip pan for each FCU.
2.1.11 The contractor must provide stamped louver type discharge and return air grills for each FCU.
2.1.12 The contractor must provide a unit-mounted, three-speed switch with an off position for each FCU.
2.1.13 The contractor must provide a right-handed control enclosure and position coils on the left for each FCU.
2.1.14 The contractor must provide a disconnect-switch, non-fused, door-interlock disconnect rated at 40 amps for each FCU.
2.1.15 The contractor must provide OC015 main fusing (0 to 30 amps) for each FCU.
2.1.16 The contractor must provide a control package including BC02 24V, unit S/S relay, and fan relay for each FCU.
2.1.17 The contractor must provide a one-inch disposable filter with a spare for each FCU.
2.1.18 The contractor must provide a type 01 PSC motor for each FCU.
· Voltage must be 115/1/60 PSC.
· Horsepower must be 1/50.
· Airflow must be 190 CFM.
2.1.19 The contractor must provide a manual air vent for each FCU.
2.1.20 The contractor must provide a factory-installed piping package for each FCU, including a two-way valve, PT ports, unions, and Y-strainer.
2.2 Delivery
2.2.1 The contractor must deliver all fan coil units to the following address:
U.S. Coast Guard Station Tawas 600 Lighthouse Rd.
East Tawas, MI 48730
3.0 CONTRACTOR PERSONNEL
3.1 QUALIFIED PERSONNEL
The Contractor must provide qualified personnel to perform all requirements specified in this SOW.
3.2 CONTINUITY OF SUPPORT
The Contractor must ensure that the contractually required level of support for this requirement is maintained at all times.
3.3 KEY PERSONNEL
Before replacing any individual designated as Key by the Government, the Contractor must notify the Contracting Officer no less than 5 business days in advance. The following Contractor personnel are designated as Key for this requirement.
3.3.1 US Coast Guard Key Personnel
The following positions will be assigned by the US Coast Guard and are considered Key Personnel for this requirement:
· Contracting Officer Kara Davis, SKC Kara.A.Davis@uscg.mil Subject to change
· STA Tawas Officer in Charge (OIC) Dalton D. Smith, BMC Dalton.D.Smith@uscg.mil Subject to change
· STA Tawas Engineering Petty Officer (EPO) William S. Schackmuth, MK1 William.S.Schackmuth@uscg.mil Subject to change
3.3.2 Contractor Key Personnel
The following positions must be assigned by the Contractor and are considered Key Personnel for this requirement:
· Contracting Officer
· Billing Point of Contact (if different from the Contracting Officer)
3.4 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (via the Contracting Officer), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
4.0 OTHER APPLICABLE CONDITIONS
4.1 SECURITY
Contractor access to classified information is not currently required under this SOW.
4.2 PERIOD OF PERFORMANCE
The contractor shall commence fabrication of goods under this SOW within 5 days of award, and delivery shall not exceed 60 days from date of award.
4.3 PLACE OF PERFORMANCE
The primary place of performance will be the Contractor’s facilities.
4.4 TRAVEL
Contractor travel must not be required for this requirement.
4.11 GENERAL REPORT REQUIREMENTS
The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).
5.0 GOVERNMENT FURNISHED RESOURCES
The Government will not furnish any resources to the Contractor in support of this contract.
LAST UPDATED: 07/09/2026 PAGE 8/17