SSN Capabilities Response Sheet VENDOR.pdf
PDF 78 KB Posted
- Solicitation number
- HQ0034MMF042420200942
- Issued by
-
DOD Washington Headquarters Service
About this file
This sources sought notice seeks capabilities statements from contractors interested in providing FACILITY INTEGRITY & LIFE SAFETY (FILS - PHASE 3) services at a SITE R location. The services include asbestos clean-up, encapsulation, infrastructure repairs to roofing and siding, rock bolting inspection, classification and mapping, drilling repair and replacement of rock bolts, geo grid placement, safety guard rails, lighting, temporary water control and drain pan replacement. Respondents must describe experience with asbestos abatement and specialized construction expertise as well as staffing capabilities for positions including Program Manager, Project Manager, Design Project Manager, Quality Control Manager, Site Safety Health Officer and Site Superintendent. The notice also includes questions regarding project planning, scheduling, oversight, quality assurance and control, and mitigation of delays on similar past projects. The Department of Defense Washington Headquarters Service issued this sources sought as market research to determine the availability of qualified contractors for a potential requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SSN-Notice- RRMC FILS PHASE III 4-23-20.pdf | ||
| RRMC FILS III - DRAFT STATEMENT OF WORK 4-10-20.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT RESPONSE - VENDOR FORM: HQ0034MMF042420200942
RRMC FACILITY INTEGRITY & LIFE SAFETY (FILS – PHASE 3)
Company Identification:
Company Name:
CAGE Code:
System for Award Management (SAM) Registration (Fill in Registered or Not Registered):
Business size under NAICS code 562910 (Fill in Small or Large):
GSA Number # (If applicable)
If a Small Business under NAICS 562910, please fill out the following table:
1.) QUESTION: Describe the contractor’s current capabilities to provide staffing IAW the Performance
Work statement (SOW) section C.2.6.1, Staffing Plan. If the contractor has the capability to provide staffing IAW with the SOW, the contractor should provide evidence that the following contractor personnel meet the minimum qualifications and knowledge listed in the SOW.
Program Manager
Project Manager
Design Project Manager
Quality Control Manager
Site Safety Health Officer
Site Superintendent
Category Mark (x) as applicable
Small Disadvantaged 8(a) Woman-Owned Service-Disabled Veteran- Owned
HUBZone Minority-Owned Fill-in below for others
Contractor’s Scheduler
ANSWER:
2.) QUESTION: Described the contractor’s current capabilities to provide staffing IAW SOW section
C.2.6.4, specialized expertise for asbestos abatement and rock bolts. If the contractor has the capability to provide staffing IAW with the SOW, the contractor should provide evidence that the following contractor personnel meet the minimum qualifications and knowledge listed in the SOW.
Program Manager
Project Manager
Design Project Manager
Quality Control Manager
Site Safety Health Officer
Site Superintendent
Contractor’s Scheduler
ANSWER:
3) QUESTION: Describe the contractors experience with asbestos clean-up services, encapsulation, needed infrastructure repairs of roofing/siding, rock bolting inspection, classification and mapping, drill/repair/replace rock bolts, geo grid placement, safety guard rails, lighting, temporary water control and drain pan replacement.
ANSWER:
4) QUESTION: Provide a description of how the Site Safety Health Officer will work with other key personnel (Quality Control Manager, Project Manager, Superintendent) to keep the schedule from being impacted while verifying asbestos abatement and safety requirements are meeting all regulations when the QCM is present on the SITE while construction or demolition activities are occurring.
ANSWER:
5) QUESTION: Describe the contractors experience with planning to keep this type of project as described in the SOW on schedule while taking into account Security access requirements for contractor personnel and materials, limited storage inside near the construction area, and minimizing delays to customers as materials and personnel are passing through the building from the construction on the roof and back to the contractors storage/laydown area.
ANSWER:
6) QUESTION: Describe how the contractor’s staff will keep the project on schedule and avoid delays while demolition of asbestos is planned, occurring, and verification of successful abatement per the
SOW. Include a short description of how the contractor will be interacting with the Site Environmental, Safety and Health Directorate and Contracting Officer Representative and Contracting Officers Representative per the SOW.
ANSWER:
7) QUESTION: The contractor shall provide an example of how the site superintendent interacted with on-site company personnel for abatement/construction for a contract of a similar size, scope, and complexity.
ANSWER:
8) QUESTION: Provide an example of how QA/QC would occur for a prior project of a similar size, scope, and complexity.
ANSWER:
9) QUESTION: Provide an example of how Project Planning, Tracking, and Oversight Processes would occur for a prior project of a similar size, scope, and complexity.
ANSWER:
10) QUESTION: Describe how schedule slippage or delay was mitigated, by the contractor on previous similar projects, to ensure that the contract completion dates were met.
ANSWER: