SSAttch2-Exp Questionnaire.pdf
PDF 163 KB Posted
- Solicitation number
- N62742MPATTINDAL
About this file
This is an Experience Questionnaire form used to document contractor past performance on relevant projects for federal contract evaluation purposes. The form requires offerors to provide detailed information about one of three identified contract opportunities (CON #1, CON #2, or CON #3).
The questionnaire requests comprehensive project details including the performing entity's name, address, SAM UEI, and points of contact. Offerors must specify their role (prime contractor, subcontractor, joint venture member, or other), the percentage of work performed, and relevant contract information such as contract number, award date, and completion date. The form requires documentation of contract type (firm-fixed price, cost/time and material, or other arrangements) and project classification (new construction, renovation, repair, or alteration). For construction projects specifically, offerors must provide total construction award amounts, final construction prices, and delivery method (design-build, design-bid-build, IDIQ, or other). The form includes specialized sections for airfield construction experience, requiring detailed specifications for Portland Cement Concrete (PCC) and Asphalt Concrete (AC) pavement work, including area measurements in square meters, minimum thickness specifications in millimeters, and whether work involved aircraft runways, taxiways, or aprons. Offerors must provide a detailed narrative description of each project demonstrating relevance to RFP requirements, including unique features, construction methods, problems encountered, and resolution approaches. The form also addresses acquisition scenarios, requiring explanation when a performing entity has been acquired by another firm.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SSAttch1-Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
EXPERIENCE QUESTIONNAIRE
Project No. (check one): CON #1 CON #2 CON #3
1. Name of Entity that Performed Project: _________________________________________________________
Address: ____________________________________________________________________________________
Phone Number: __________________________________ SAM UEI: ________________________________
Point of Contact: _________________________________ Contact Phone Number: _____________________
a. If the Entity (named above) that performed the project has been acquired and is no longer a separate legal entity, provide the name of the Acquiring Firm and an explanation of the acquisition sufficient to demonstrate 1) that the
Entity is now part of the Acquiring Firm, and 2) that the Acquiring Firm currently possesses assets and personnel from the Entity sufficient for the Entity’s experience and past performance to be reasonably predictive of the
Acquiring Firm’s performance on this contract.
Name of Acquiring Firm: ____________________________________ UEI of Acquiring Firm: ______________
Acquisition Terms:
b. Name of Entity that Performed Work that Experience is Claimed for (i.e.; if the project was performed by a Joint
Venture (JV) and Offeror is claiming experience of one of the J/V members that performed work on the project, state the exact legal name of the JV member the Offeror claims experience for):
Address: ____________________________________________________________________________________
Phone Number: ___________________________________ SAM UEI: ________________________________
Point of Contact: __________________________________ Contact Phone Number: _____________________
2. Work Performed as*: Prime Contractor Sub Contractor Joint Venture Other
(Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
If not complete, % physically complete as of the date of issuance of this RFP:
5. Type of work: New Construction Renovation Repair Alteration Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
Firm-Fixed Price Cost/Time and Material Other (explain):
7. Construction Project:
Total Construction Award Amount: $__________________ Final Construction Price: $_________________
Type of Contract/Task Order: (Check ALL that apply)
Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):
8. Construction Project Details: Offerors shall complete the following information for each relevant individual feature: (For each item checked, provide a detailed description of the work in Block 9).
• New construction of Airfield Portland Cement Concrete (PCC) Pavement: Yes No o Area of Airfield PCC Pavement constructed:
_________ square meters with a minimum concrete thickness of ________mm.
o Was Airfield PCC Pavement for an aircraft runway, taxiway, or apron? Yes No
• New construction of Airfield Asphalt Concrete (AC) Pavement: Yes No o Area of Airfield PCC Pavement constructed:
_________ square meters with a minimum asphalt concrete thickness of ________mm.
o Was Airfield PCC Pavement for an aircraft runway, taxiway, or apron? Yes No
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP. (e.g.:
unique features, square footage, construction methods, any problems encountered and how it was resolved).
File details come from the government source that posted it. Updated .