This is a Sources Sought Questionnaire from NAVFAC Pacific for contract opportunity N62742DBBP722 related to aircraft hydrant fueling system construction services under NAICS Code 237120.

Respondents must provide firm information including name, address, phone number, and CAGE/SAM Unique Entity Identifier, and identify their small business status (Section 8(a), HUBZone, Woman-Owned, Service Disabled Veteran-Owned, or Small Business). Firms must submit documentation of up to three relevant projects demonstrating experience with new construction of pressurized aircraft hydrant fueling systems containing a minimum of 5,000 feet of piping and six hydrant outlet pits. Each project must include all three of the following features: at least one emergency fuel shutoff station or emergency power down station at a hydrant outlet, a cathodic protection system for underground fuel piping, and testing, pigging, and commissioning of hydrant fueling systems. Projects must have been completed or substantially completed (at least 75% physically complete) within the past fifteen years and performed by the specific entity proposed for the work. For multiple award and indefinite delivery/indefinite quantity contracts, respondents must submit work performed under individual task orders rather than the contract as a whole. Firms must also provide a letter from their Corporate Surety documenting single contract bonding capacity. The questionnaire distinguishes between experience (types and amounts of projects accomplished) and past performance (quality of contractor performance).

View the file

Other files

File Type Posted
SSAttch2-Exp Questionnaire.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC PACIFIC CON33

SOURCES SOUGHT QUESTIONNAIRE

FOR N62742DBBP722

Attachment 1

Firm Name: _______________________________________________________________

Firm Address: _______________________________________________________________

Phone Number: _______________________________________________________________

CAGE / SAM Unique Entity Identifier: _____________________________________________

Name/Title of Person Completing Questionnaire: _____________________________________

1. Type of small business concern for NAICS Code 237120 (check all that applies):

___ Section 8(a) (Submit a copy of the letter from the Small Business Administration certifying as a Section 8(a) concern); Geographic Area _________________

___ HUBZone Small Business (Submit a copy of the letter from the Small Business Administration certifying as a HUBZone SBC)

___ Woman-Owned Small Business

___ Service Disabled Veteran Owned Small Business

___ Small Business

2. Submit information on a maximum of three (3) relevant projects using Attachment 2. A relevant project is defined as:

New construction of a pressurized aircraft hydrant fueling system with a minimum of 5,000 feet of piping, six (6) hydrant outlet pits, and includes all three (3) of the following individual features within a single project scope:

(1) At minimum one (1) emergency fuel shutoff station or emergency power down station at a hydrant outlet.

(2) Cathodic protection system for underground fuel piping.

(3) Testing, pigging and commissioning of hydrant fueling systems.

Notes:

a. Projects submitted to demonstrate hydrant fueling systems will only be considered if the work was performed by the specific entity proposed for hydrant fueling systems.

Construction shall be completed or substantially completed within the last fifteen (15) years. Substantially complete means at least 75% physically complete.

Attachment 1

b. A relevant construction project is further defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

c. There is a clear distinction between “experience” and “past performance”. Experience is related to the types and amounts of projects previously accomplished. Past performance relates to how well a contractor has performed.

3. Provide a letter from your Corporate Surety indicating your firm’s single contract bonding capacity.