This document contains specifications for a wastewater utility pumping station control panel and sequence of operation. The control panel must operate two pumps in parallel or alternately to maintain well wastewater levels between high and low setpoints. It must include magnetic motor controllers, undervoltage and overload protection, alternator, programmable logic controller, weatherproof NEMA 3R enclosure, and a secondary main disconnect panel. Related to this is a Sources Sought notice from the Indian Health Service seeking potential vendors for construction of quarters at Polacca, Arizona. The notice is a pre-solicitation to identify capable vendors for the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SS Attachment 1d - Hopi QTRS FF-E Specification Sheets.pdf | ||
| SS Attachment 1e - Hopi Quarters FFE BOD Cut Sheets.pdf | ||
| SS Attachment 1b - Hopi Quarters Specifications.pdf | ||
| SS SOW HHCC Quarters Construction.pdf | ||
| SS Attachment 4 Sources Sought IEE Self-Performance Worksheet.docx | DOCX document | |
| SS Attachment 1c Hopi Quarters 100-percent FFE List.pdf | ||
| SS Attachment 1a - Hopi Quarters_FINAL CD.pdf | ||
| SS Attachment 3 IHS IEE Representation Form.pdf | ||
| SS Attachment 2 NEPA HHCC Quarters.pdf | ||
| A10 Sources Sought HHC Qtrs Construction.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
521 DUNN CIRCLE
SPARKS, NV 89431
(855) 468 - 5600
WASTEWATER UTILITY PUMPING STATION SPECIFICATIONS
1.1 PUMPING STATION CONTROLS
A. Control Sequence of Operation: Cycle each pump on and off automatically to maintain well wastewater level. Automatic control operates both pumps in parallel if well level rises to starting point of lag pump, until shutoff level is reached. Automatic alternator, with manual disconnect switch, changes sequence of lead‐lag sewage pumps at completion of each pumping cycle. High and low level set points will activate audible and visual alarms at control panel. Low level float to also work as redundant off float should primary level sensing equipment malfunction. High water alarm float shall activate both pumps at 60hz should primary level sensing device malfunction.
B. Motor Controllers: Magnetic, full voltage, non‐reversing. Include under‐voltage release, thermal‐overload heaters in each phase, manual reset buttons, and hand‐automatic selector switches. Include circuit breakers to provide branch‐circuit protection for each controller.
C. Install labels to identify switches and controls.
D. Control Panel: Complying with UL 508A, with weatherproof enclosure, covered compartments sized to accommodate controllers, circuit breakers, transformers, alternators, and programmable logic controller.
1. Basis of Design Product: Provide California Motor Control Systems, Inc., Duplex Control
Panels, or a comparable product approved by Engineer prior to bid.
2. Enclosure: NEMA 250, Type 3R powder‐coated sheet steel
3. Control panel must be supplied with a dead front panel door.
4. Secondary Main Disconnect: A secondary main disconnect panel must be installed in the immediate vicinity of the primary control panel. This main disconnect must have the ability to be locked out/tagged out during control panel maintenance.