This Scope of Work document outlines interchange improvement specifications for the Tennessee Department of Transportation (TDOT) project on State Route 29 (US 27) in Hamilton County, Tennessee, specifically addressing widening of the exit ramp from SR29 NB to SR153 at Lane Mile 10.87. The project involves expanding the exit ramp from one 16-foot lane with a 10-foot left-right shoulder to two 12-foot lanes with a 10-foot right-left shoulder. The scope of work encompasses traffic control plan submission and implementation to TDOT standards with barrier rail installation, excavation and pavement removal, base stone preparation and compaction, median improvements on SR153 including replacement of pavement markings and installation of 85 feet of Tuff Curb with thermoplastic striping, and exit ramp improvements on SR29 NB including eight feet of concrete widening with anti-skid aggregate, full-depth left shoulder replacement, installation of directional arrows and channelization, and comprehensive sign and striping replacement throughout the work area. One lane of traffic must remain open on the exit ramp at all times during construction, and all work must comply with TDOT's Standard Specifications for Road and Bridge Construction (January 1, 2021).

The document requires that contractors submit competitive bids and acknowledge their familiarity with site conditions, local circumstances, and project plans prior to bid submission. All contractor labor, equipment, traffic control devices, and materials necessary for project completion are the contractor's responsibility. The project requires seed and straw application to disturbed areas, Snow plowable Raised Pavement Markers installation per standard drawing T-M-1, and site demobilization with removal of all trash and debris. No specific contract award date, pricing information, funding source, set-asides, site visit requirements, or bidder's conference details are provided within this scope of work document.

View the file

Other files

File Type Posted
40100_-_SR29_Road_Modifications.pdf PDF
T_C_40100_13937_Final.pdf PDF
SR29%20Scope%20of%20Work%20final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hamilton County Interchange Improvements

SR29 (US 27) L.M. 10.87 and SR153 Hamilton County, TN

Specifications

The Tennessee Department of Transportation (TDOT) would like to widen the exit ramp from

State Route 29 NB to State Route 153 from one 16’ lane and a 10’ leftright shoulder to two 12’ lanes and a 10’ right left shoulder in Hamilton County on SR 29, at Lane Mile 10.87. One contractor will be selected to perform the full scope of services described in this document.

Please note the attached drawings.

1. Scope of Work

Contractor will submit traffic control plans to be approved by TDOT. Contractor will provide all traffic control to TDOT standards. Barrier Rails will need to be utilized. The contractor shall provide all labor, equipment, traffic control, and material and perform all services necessary to complete the following tasks, using the attached drawings and images for guidance.

A. Traffic Control

• Provide all necessary traffic control devices, signage, and personnel required to safely perform work on an active state route.

• One lane of traffic will need to be open at all times on the exit ramp.

B. Excavation

• One lane of traffic will need to be open at all times on the exit ramp.

• Sawcut a clean joint of full depth of pavement along the entire length of the exit ramp, to include the rectangular section where the turn lane meets SR153.

• Remove and dispose of pavement that is beyond the sawcut

• Remove and dispose of all rock and organic matter such that the constructed exit ramp is built on solid engineered fill (pug road base)

• Contractor will assume the following layers for the travel lane:

- 8" Concrete

- 4” TPB

- 4” Base Stone

• Ensure that the base stone is properly compacted with a vibratory roller (at proper moisture content).

• The total width of the graded area shall be 18 feet (as shown in the attached drawings)

• Ensure the road base matches the cross-slope that the asphalt above it will have (please note the attached images)

• Demobilize and remove all trash and debris from the work site

• Seed and straw any disturbed areas

• Add Snow plowable Raised Pavement Markers according to standard drawing T-M-1

By submitting bids for this work, the bidder represents that it has:

• Carefully examined the site of the work described herein

• Has become familiar with local conditions and the character and extent of the work.

• Has carefully examined the Plan images and the Standard Specifications for Road and Bridge Construction (January 1, 2021) adopted by the State of Tennessee, Department of Transportation and recognizes and attests that all work will be conducted in accordance with these plans and standards.

C. Median Improvements (S.R. 153)

• Replace pavement markings for the left turn lane, acceleration lane, white island, and yellow median channelization.

• Add 85' of Tuff Curb to the median with 10' of space between the end of the curb and the median nose.

• All striping shall be thermoplastic.

D. Exit Ramp Improvements (S.R. 29) NB

• Widen the exit ramp from SR29 NB to SR 153 from one 16' lane to two 12' lanes.

• Widen 8' of concrete type A mix with anti-skid aggregate on the left side to widen to the left.

• Use Standard Drawing RD18-TS-8 for the typical section (attached).

• Do a full depth replacement on the left shoulder pavement as it will become travel lane pavement.

• Add Type B Wrong Way arrows and left and right turn arrows.

• Adjust the right left turn lane to turn less sharply than the existing condition. It should be at a

60-degree angle to SR153.

• Channelize the right left shoulder and replace island channelization as shown.

• Remove existing signs on the ramp except for guide signs.

• Replace and upsize yield sign to 60"x60"x60" with reflective red strips on the posts.

• Replace the two 36"x36" stop signs and four 54"x18" one-way arrows

• Replace three 36"x36" "DO NOT ENTER" signs. Two will now be on separate posts.

• Place two new 36"x36" movement restriction symbol signs.

• Place four new 42"x30" "WRONG WAY" signs.

• Place four new 36" tall Advance Intersection Lane Control signs.

• Replace the striping as shown on these drawings.

• All striping shall be thermoplastic.

https://www.tn.gov/tdot/tdot-construction-division/transportation-construction-division-resources/2021-standard-specifications.html https://www.tn.gov/tdot/tdot-construction-division/transportation-construction-division-resources/2021-standard-specifications.html