SR1 Mtrl Sbmtl 19B - As-Builts 5.pdf
PDF 816 KB Posted
- Solicitation number
- 12305B21Q0015
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SR1 Greenhouse power and lighting layout.pdf | ||
| SR1 Mtrl Sbmtl 19B - As-Builts 4.pdf | ||
| sSTATEMENT OF WORK Apple Rootstock.docx | DOCX document | |
| s20200715 Secondary Panels.jpg | JPG image | |
| SR1 BARCGeneva Electrical.doc | DOC document | |
| SR1a BARCGeneva Electrical.doc | DOC document | |
| SR1 Answers to Questions.docx | DOCX document | |
| SR1 Mtrl Sbmtl 19B - As-Builts 3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOP VIEW
SIDE VIEW
CONCRETE EQUIPMENT PAD DETAIL
6" x 6" 10/10 WIRE MESH
FINISH GRADE
NO SCALE
PAD SHOULD BE A
MINIMUM OF 6" LARGER
THAN THE EQUIPMENT
ENCLOSURE ON ALL
SIDES
6" x 6" 10/10
WELDED WIRE MESH
PROVIDE 1", 45 DEGREE
CHAMFER ON ALL SIDES
3000 PSI CONCRETE
EQUIPMENT PAD
4" 6"
REFER TO GENERATOR SHOP
DRAWINGS FOR CONDUIT STUB-UP
LOCATIONS IN THE GENERATOR PAD.
WP GFI
PROVIDE RECEPTACLE AT GENERATOR
4-#10, 1-#10EG, 1" C
40 38 42
TO EP1
100A/3P
(3) 20A/1P
NO SCALE
EMERGENCY GENERATOR SCHEMATIC WIRING DIAGRAM
JJ
DIGITAL CONTROL
PANEL (FURNISHED
WITH GENERATOR)
CONNECT BATTERY
CHARGER
2-#12, 1-#12EG, 1/2"C
2-#12, 1-#12EG, 1/2"C
(10) #18 SHIELDED TWISTED PAIR IN 1"C
OR AS REQUIRED BY MANUFACTURER
EP1/38 (20A/1P C.B., BLOCK HEATER)
EP1/40 (20A/1P C.B., BATTERY CHARGER)
EP1/42 (20A/1P C.B., GFI RECEPTACLE)
INSTALL ANNUNCIATOR PANEL
FURNISHED WITH GENERATOR.
ATS
208Y/120V 100A/3P
CONNECT BLOCK HEATER
4-#2, 1-#8EG, 4" PVC-80,
DB
(1) #18 SHIELDED TWISTED
PAIR IN 1/2 "C FOR
GENERATOR START SIGNAL
(1) ENCLOSED CIRCUIT BREAKERS
IN GENERATOR ENCLOSURE
EMERGENCY GENERATOR
25KW/31.25KVA
208Y/120V
NATURAL GAS
LOCATED OUTSIDE
PROVIDE EMERGENCY STOP BREAK-
GLASS PUSHBUTTON. INSTALL OUTSIDE
OF GENERATOR ROOM OR EXTERNAL
TO THE WEATHERPROOF ENCLOSURE
2-#14, 1/2"C
NO SCALE
DIRECT BURIED CONDUIT DETAIL
TWO DUCTS
40"
MIN.
7 1/2"
GRASS AREAS
BACKFILL WITH NATIVE
MATERIAL IN 6" LIFTS.
COMPACT AFTER EACH
LIFT.
PAVEMENT AREAS
BACKFILL WITH #2
CRUSHED STONE IN 6"
LIFTS. COMPACT AFTER
EACH LIFT.
3" SCREENED TOP SOIL
AROUND CONDUIT
4" SCREENED TOP SOIL
FOR GRASS AREAS.
PAVEMENT AS REQUIRED6" WIDE, RED PLASTIC
TAPE WITH WORDING
"CAUTION BURIED ELECTRIC
LINE BELOW." TAPE SHALL
BE LOCATED 6" BELOW
FINISHED GRADE
FINISH GRADE
PVC CONDUIT
THREADED CAP ON ALL SPARES
TO COUPLING, PULLBOX, PANEL ECT.
PVC TO RIGID ADAPTER
PROVIDE ENGRAVED NAMEPLATE
ON CONDUITFINISHED
FLOOR
WRAP ALL JOINTS 100%
WATERTIGHT
SEAL VAPOR
BARRIER TO
CONDUIT
RIGID HOT DIPPED
GALVANIZED CONDUIT
BACKFILL WITH NATIVE
MATERIAL IN 6" LIFTS.
COMPACT AFTER
EACH LIFT
SAND BED ENVELOPE AS
CALLED FOR ON PLANS.
WHERE CONDUIT STUBS UP UNDER FLOOR MOUNTED EQUIPMENT SUCH
AS SWITCHGEAR, PROVIDE PVC ELBOWS IN LIEU OF RIGID SHOWN.
AT EACH CONDUIT STUB-UP, AFFIX ENGRAVED PLASTIC NAMEPLATE
INDICATING CONDUIT NO. OR CIRCUIT IDENTIFICATION. ATTACH WITH
NYLON CABLE TIE.
NOTES:
NO SCALE
CONDUIT STUB-UP INSIDE BUILDING DETAIL
1.
2.
FT
P A N E L B
O A R
D
D
IS
C O
N N E C T
T H E R
M O
S T A T
L
IG
H T S
W
IT
C H
C A R
D A
C C E S S
V O
IC
E /D
A T A O
U T L E T
D U P L E X R
E C E P T A C L E
6'-8" 6'-0" 5'-0"
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0"
2'-10"
1'-6" 1'-6" 1'-6"
4'-0" 4'-0"
7'-8"7'-6"
NO SCALE
TYPICAL DEVICE MOUNTING ELEVATIONS
NOTES:
F
IR
E A
L A R
M A U D
IO
/V
IS
U A L
A N D
V
IS
U A L
D E V
IC
E
N U R
S E C
A L L
P R
E /P
O S T
P .A
.C .U
N U R
S E C
A L L
O .R
N U R
S E C
A L L
T Y P
IC
A L
IN LOCATIONS WHERE SIMILAR DEVICES ARE MOUNTED AT THE SAME HEIGHT, DEVICES SHALL BE PROPERLY "GANGED" AND SHALL
HAVE A SINGLE COVER PLATE.
IN LOCATIONS WHERE DIFFERENT DEVICES ARE MOUNTED AT DIFFERENT HEIGHTS WITHIN FOUR FEET OF ONE ANOTHER, DEVICES SHALL BE MOUNTED SUCH THAT THEY HAVE A COMMON CENTERLINE. IF THERE ARE THREE OR MORE DEVICES, THE CONTRACTOR
SHALL REQUEST A DETAIL FROM THE ARCHITECT.
1.
2.
F
IR
E A
L A R
M P U L L S
T A T
IO
N
W A L L M
O U N T E D
T E L E P H O
N E
D U P L E X R
E C E P T A C L E
M E C H R
O O
M G
A R
A G
E S
N U R
S E C
A L L E
M E R
G E N C Y
B A T H R
O O
M
C L O
C K
O U T L E T
D E S K T
O P T
E L E P H O
N E
C A T V
O U T L E T
FINISHED
FLOOR
D O
M E
L
IG
H T
4'-0"
A P A R
T M
E N T L
O A D
C E N T E R
NO SCALE
POWER ONE-LINE RISER DIAGRAM
400A/3P
LVP1
G
200A/3P 100A/3P
EP1
100A/3P
EG-1
25KW/31.25KVA
208Y/120V 3Ø, 4W
NATURAL GAS
ATS-1
250V 100A/3P
(E)MDP
208Y/120V 3Ø, 4W
400A/3P MLO
4-#2, 1-#8EG IN 1¼"C
4-#2, 1-#8EG IN 1¼"C
4-#2, 1-#8EG IN 4" PVC-80, DB
(E)PAD MOUNTED TRANSFORMER
100KVA
208Y/120V SECONDARY
DEMOLITION NOTES:
NO SCALE
NATURAL GAS SERVICE - DEMOLITION SCHEMATIC DETAIL
COORDINATE UPGRADE OF (E) NG METER WITH NYSEG.1
(E) METER
(E) NG SERVICE
(E) NG PIPING
(E) PRESSURE
REGULATOR
DRAWING NOTES:
NO SCALE
NATURAL GAS SERVICE - NEW WORK SCHEMATIC DETAIL
COORDINATE UPGRADE OF (E) NG METER WITH NYSEG.
CONNECT (N) 1½" NG BRANCH TO (E) NG PIPING.
PROVIDE ISOLATION VALVE AND TRANSITION TO PE
GAS PIPING BELOW GRADE. UNDERGROUND NG PIPING
SHALL HAVE 24" OF COVER.
(N) METER
(E) NG SERVICE
(E) NG PIPING
(E) PRESSURE
REGULATOR
(N) 1½" NG PIPING
(E) NG PIPING
TURNER
E N G I N E E R I N G , P C
One Woodbury Boulevard Rochester, NY 14604
585.381.3360 Tel
Project No.
IT IS A VIOLATION OF LAW FOR ANY PERSONS,
UNLESS ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER
ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY
LICENSEE WHO ALTERS THIS DOCUMENT IS
REQUIRED BY LAW TO AFFIX HIS OR HER SEAL
AND THE NOTATION "ALTERED BY", FOLLOWED
BY HIS OR HER SIGNATURE AND A SPECIFIC
DESCRIPTION OF THE ALTERATIONS.
Client
Project
Drawing
Issue Date:
Proj. No.
Sheet
Proj. Status:
EP200
ELECTRICAL AND
PLUMBING DETAILS
19223
CORNELL USDA
GENERATOR
CORNELL COOPERATIVE
EXTENSION
19223
01/02/2020
ISSUED FOR BID
Revision Schedule
NO. DESC. DATE
1 PANEL SCHEDULE 2/4/2020
2 EP1 SCHEDULE 2/6/2020
3 OWNER REQUESTED
CHANGES
2/24/2020
4 UTILITY ADDITIONS 8/20/2020
TOTAL EST. DEMAND: 30 A
Receptacle 180 VA 100.00% 180 VA TOTAL CONN.: 40 A
Other 4 VA 100.00% 4 VA TOTAL EST. DEMAND: 10837 VA
Motor 14136 VA 75.00% 10602 VA TOTAL CONN. LOAD: 14376 VA
Lighting 56 VA 90.00% 50 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL AMPS: 34 A 42 A 46 A
TOTAL LOAD: 4064 VA 4924 VA 5388 VA
41 SPACE -- -- 0.00 0.18 1 20 A GEN RECEPTACLE 42
39 SPACE -- -- 0.00 0.50 1 20 A GEN BATTERY CHARGER 40
37 SPACE -- -- 0.00 0.50 1 20 A BLOCK HEATER 38
35 SPACE -- -- 0.00 0.00 -- -- SPACE 36
33 SPACE -- -- 0.00 0.00 -- -- SPACE 34
31 SPACE -- -- 0.00 0.00 -- -- SPACE 32
29 SPACE -- -- 0.00 0.00 -- -- SPACE 30
27 SPACE -- -- 0.00 0.00 -- -- SPACE 28
25 SPARE 20 A 1 0.00 0.00 1 20 A SPARE 26
23 SPARE 20 A 1 0.00 0.00 1 20 A SPARE 24
21 ROOF PUMP 20 A 1 0.10 0.10 1 20 A ROOF PUMP 22
19 EAST EM AND EXIT LTG 20 A 1 0.03 0.03 1 20 A WEST EM AND EXIT LTG 20
17 ENVIROSTEP 20 A 1 0.18 0.18 1 20 A ENVIROSTEP 18
15 OVERHEAD CURTAIN 20 A 1 0.30 0.30 1 20 A OVERHEAD CURTAIN 16
13 PAD PUMP AND VENT 20 A 1 0.68 0.68 1 20 A PAD PUMP AND VENT 14
11 EXHAUST FAN 2-SPD 20 A 1 1.51 1.51 1 20 A EXHAUST FAN 2-SPD 12
9 EXHAUST FAN 1-SPD 20 A 1 0.82 0.82 1 20 A EXHAUST FAN 1-SPD 10
7 GABLE SHUTTER AND... 20 A 1 0.11 0.11 1 20 A GABLE SHUTTER AND... 8
5 HAF FANS 20 A 1 0.91 0.91 1 20 A HAF FANS 6
3 JET FAN AND SHUTTER 20 A 1 1.00 1.00 1 20 A JET FAN AND SHUTTER 4
1 UNIT HEATERS - MODINE... 20 A 1 0.96 0.96 1 20 A UNIT HEATERS - MODINE... 2
CKT CIRCUIT DESCRIPTION TRIP POLES A (kVA) B (kVA) C (kVA) POLES TRIP CIRCUIT DESCRIPTION CKT
NOTES:
EP1 EAST GREENHOUSE 1 100 A 3Ø, 4W 120/208 WYE SURFACE 10kA TYPE 1
MCB MLO
NAME LOCATION SOURCE
RATING (AMPS)
PHASE/WIRE VOLTAGE MOUNTING KAIC DESIGN MAKE NEMA TYPE
HINGED TRIM X 200% NEUTRAL SUB-FEED LUGS SPD SIZE:PANELBOARD SCHEDULE SE RATED SUB-FEED BREAKER FEED-THRU LUGS INTEGRAL SPD
KM2
Text Box
AS-BUILTS
ChrisM.Wilson Polygon
ChrisM.Wilson Polygon
ChrisM.Wilson Typewritten Text 5 USDA Notes on As-Builts 09/24/2020 (CMW/EPM)
ChrisM.Wilson Typewritten Text
ChrisM.Wilson Polygonal Line
ChrisM.Wilson Polygonal Line
ChrisM.Wilson Typewritten Text
ChrisM.Wilson Typewritten Text Secondary Pressure Regulator/Governor Installed (11" WC)
ChrisM.Wilson Typewritten Text Site Photo (09/24/2020) - Location of Secondary Pressure Regulator/Governor
ChrisM.Wilson Cross-Out
ChrisM.Wilson Line
ChrisM.Wilson Line
ChrisM.Wilson Polygon
ChrisM.Wilson Typewritten Text
DIGITAL CONTROL PANEL IS CONNECTED DIRECTLY TO ATS AS-BUILT
ChrisM.Wilson Polygonal Line
ChrisM.Wilson Typewritten Text
File details come from the government source that posted it. Updated .