SR1 Answers to Questions.docx

DOCX document 13 KB Posted

Attached to
Install power and lighting circuits in East and West Greenhouses.
Solicitation number
12305B21Q0015
Issued by

View the file

Other files

File Type Posted
SR1 Greenhouse power and lighting layout.pdf PDF
SR1 Mtrl Sbmtl 19B - As-Builts 4.pdf PDF
sSTATEMENT OF WORK Apple Rootstock.docx DOCX document
s20200715 Secondary Panels.jpg JPG image
SR1 Mtrl Sbmtl 19B - As-Builts 5.pdf PDF
SR1 BARCGeneva Electrical.doc DOC document
SR1a BARCGeneva Electrical.doc DOC document
SR1 Mtrl Sbmtl 19B - As-Builts 3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12305B21Q0009 - Answers to Questions 04/12/2021

1-Are there any additional drawings that show existing panel locations and ratings? [Mtrl Sbmtl 19B – As Builts.pdf shows capacity of and current loads at MDP ‘EAST GREENHOUSE 1’ going to subpanel ‘LVP1’ on EP001 with its rating of 200A. The location of ‘LVP1’ is depicted on the As-Builts on EP100 and on Detail #5 on EP200 that shows its rating and relationship to ‘ATS-1’ and ‘EP1’.] 2-Is there room in your existing panel to do the mentioned scopes? [Yes. ‘LVP1’ in currently unloaded and completely available.] 3-Is/are the panel/s in the room/s where the area of work is? [Yes. Look at EP001 and EP200 of the As-Builts] 4-Can you provide pictures of the area of work and the existing panels we are getting our feeds from? [See picture attachment in attached outlook item ‘Secondary Pandels.jpg’]

5- For the equipment/pumps/chillers etc. are they onsite? [Equipment is being procured and installed by the Research Location. Coordinate/confirm outlet locations and power sources (standby vs. lighting panel) with Location.] 6-Is installing any of this equipment in our scope? [See above]