This is an irrigation layout and technical specification document prepared for Walton County, Florida, in support of the SR 83 (US 331) Landscaping Improvements project, a joint collaboration between Walton County and the Florida Department of Transportation (FDOT). The project involves the installation of a comprehensive irrigation system along the SR 83 (US 331) scenic corridor median spanning approximately 256,500 square feet from SR 30 (US 98) to north of Chat Holley Road. The work is divided into two phases: Phase 1 extends from Coastal Center Drive to the south side of the Clyde B. Wells Bridge, and Phase 2 extends from US Highway 98 to Coastal Center Drive. The contract duration is 60 days for substantial completion with an additional 30 days for punch list completion. A mandatory pre-bid conference is scheduled for October 27, 2025, at 10:00 am, with bid responses due on November 17, 2025, at 3:00 pm. The total project cost is estimated at approximately $670,000, structured as a lump sum bid with six line items including mobilization, maintenance of traffic, sod removal and site preparation, Zoysia sod installation, irrigation system components and installation, and a 10% owner's contingency.

The irrigation specifications require contractors to install Rain Bird pressure compensating emitters at flow rates of 3 gallons per plant and 1 gallon per day, with minimum Schedule 40 PVC piping buried at least 12 inches below grade and trenching a minimum of 12 inches from the back of curb. The system must provide 100% coverage of all planted and sod areas without overspreading onto roadways or median openings. Contractors must warranty the irrigation system for one year against defects in material and workmanship, verify all existing utilities through an 811 dig ticket prior to excavation, and notify the Beach Operations Department 48 hours prior to construction. All lane and shoulder closures must be requested in writing and approved a minimum of 48 hours prior to work, with allowance for up to 2 weeks for the approval process. Contractors are required to provide performance and payment bonds, maintain a full-time on-site superintendent, and adhere to FDOT traffic control standards per the 600 Series. The contract includes liquidated damages of $1,685 per calendar day for project delays and requires compliance with all federal, state, and local regulations and licensing requirements.

View the file

Other files

File Type Posted
Beach_Amusements_and_Activities.pdf PDF
Beach_Amusements_and_Activities.pdf PDF
Beach_Amusements_and_Activities.pdf PDF
Attachment_A.pdf PDF
Attachment_B.pdf PDF
Attachment_A.pdf PDF
Attachment_B.pdf PDF
Attachment_B.pdf PDF
Attachment_A.pdf PDF
Contract_No._25-26.pdf PDF
Contract_No._25-26.pdf PDF
Contract_No._25-26.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
Contract_No._25-26.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
SR_83_US_331_Irrigation_Layout_FINAL.pdf PDF
SR_83_US_331_Irrigation_Layout_FINAL.pdf PDF
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
SR_83_US_331_Irrigation_Layout_FINAL.pdf PDF
Public_Construction_Bond_(25).doc DOC document
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
Contract_Plans.pdf PDF
Contract_Plans.pdf PDF
Contract_Plans.pdf PDF
Contract_Plans.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

1. THE CONTRACTORS SHALL NOTIFY BEACH OPERATIONS DEPARTMENT 48 HOURS PRIOR TO

CONSTRUCTION.

2. THE CONTRACTOR IS TO USE EXTREME CAUTION WHEN WORKING IN OR AROUND AREAS OF

OVERHEAD POWER LINES AND UNDERGROUND UTILITIES.

3. THE CONTRACTOR SHALL NOTIFY THE COUNTY IN WRITING WHEN THE PROJECT IS SUBSTAN-

TIALLY COMPLETE. THE COUNTY WILL REVIEW THE PROJECT TO DETERMINE IF THE PROJECT

IS SUBSTANTIALLY COMPLETE. SUBSTANTIALLY COMPLETE IS DEFINED IN CONTRACT.

4. TRAFFIC CONTROL PLANS IMPLEMENTED WILL BE AS PER FDOT INDEX 600 SERIES .

5. LANE AND SHOULDER CLOSURES: ALL LANE AND SHOULDER CLOSURES MUST BE REQUEST-

ED IN WRITING AND APPROVED A MINIMUM OF 48 HOURS PRIOR TO WORK STARTING.

ALLOW UP TO 2 WEEKS FOR LANE CLOSURE APPROVAL PROCESS. CONTACT LOCAL PERMIT'S

OFFICE FOR MORE DETAILS AT 850- 836-5790 OR 850-836-5742.

6. ANY ROAD OR PROPERTY DAMAGED BY CONSTRUCTION OPERATIONS ARE TO BE RESTORED

OR RECONSTRUCTED AS DIRECTED BY BEACH OPERATIONS DEPARTMENT. IRRIGATION NOTES

1. CONTRACTOR SHALL WARRANTY IRRIGATION SYSTEM FOR ONE YEAR AGAINST DEFECTS IN MATERIAL AND

WORKMANSHIP

2. CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UTILITIES and SUBMITT AN 811 DIG TICKET PRIOR TO

ESCAVATION

3. PVC PIPING TO BE BURIED A MINIMUM OF 12”

4. TRENCHING TO BE A MINIMUN OF 12 “ FROM BACK OF CURB AND BACKFILLED WITH CLEAN COMPACT

MATERIAL

5. All IRRIGATION PIPE MINIMUM SCHEDULE 40 PVC

6. IRRIGATION COMPONENTS SHALL NOT OVERSPRAY ONTO ROADWAY OR MEDIAN OPENING

7. VALVE BOXES SHALL BE INSTALLED FLUSH WITH GRADE

8. IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% COVERAGE OF ALL PLANTED AND SOD AREAS

9. CONTRACTOR TO INSTALL RAIN BIRD PRESSURE COMPENSATING EMMITERS TO ESTABLISH THE FOLLOWIN

FLOW RATES

3 GAL Plant / 1 GAL Per Day

PHASE PLAN

1. PHASE 1: FROM COASTAL CENTER DRIVE TO SOUTH SIDE OF THE CLYDE B WELLS BRIDGE.

2. PHASE 2: FROM US HWY 98 TO COASTAL CENTER DRIVE.

IRRIGATION LAYOUT

SR 83 (US 331) MEDIAN

FROM SR 30 (US 98) TO SOUTH OF CLYDE B. WELLS BRIDGE

PHASE 2

BEGIN

PHASE 2 PHASE 1

END BEGIN

PHASE 1

END