SR_83_US_331_Irrigation_Layout_FINAL.pdf

PDF 2 MB Posted

Attached to
Beach Amusements and Activities
Solicitation number
25-26
Issued by
Walton County, Florida

About this file

This document is an irrigation layout plan for the Florida Department of Transportation (FDOT) for the SR 83 (US 331) median from SR 30 (US 98) to south of the Clyde B. Wells Bridge. The project is divided into two phases: Phase 1 covers the area from Coastal Center Drive to the south side of the Clyde B. Wells Bridge, and Phase 2 extends from US Highway 98 to Coastal Center Drive. The irrigation system design includes specific requirements such as using Rain Bird pressure compensating emitters, setting a flow rate of 3 gallons per plant at 1 gallon per day, and ensuring 100% coverage of planted and sod areas.

The detailed irrigation plan specifies technical requirements including PVC piping buried at least 12 inches deep, valve boxes installed flush with grade, and a one-year warranty on the irrigation system against material and workmanship defects. The irrigation controllers will be Hunter ACC 2-wire decoders with 99 station capacity, with detailed zone assignments for control valves covering spray and bubbler irrigation for various areas. The contractor must submit an 811 dig ticket prior to excavation, use Schedule 40 PVC piping, and ensure irrigation components do not overspray onto roadways or median openings. Additional notes emphasize the need for careful utility location, extreme caution around overhead power lines, and proper restoration of any road or property damaged during construction.

View the file

Other files

File Type Posted
Beach_Amusements_and_Activities.pdf PDF
Beach_Amusements_and_Activities.pdf PDF
Beach_Amusements_and_Activities.pdf PDF
Attachment_B.pdf PDF
Attachment_A.pdf PDF
Attachment_A.pdf PDF
Attachment_B.pdf PDF
Attachment_A.pdf PDF
Attachment_B.pdf PDF
Contract_No._25-26.pdf PDF
Contract_No._25-26.pdf PDF
Contract_No._25-26.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
Contract_No._25-26.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
Public_Construction_Bond_(25).doc DOC document
SR_83_US_331_Irrigation_Layout_FINAL.pdf PDF
Public_Construction_Bond_(25).doc DOC document
SR_83_US_331_Irrigation_Layout_FINAL.pdf PDF
SR_83_US_331_Irrigation_Layout_FINAL.pdf PDF
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
Contract_Plans.pdf PDF
Contract_Plans.pdf PDF
Contract_Plans.pdf PDF
Contract_Plans.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

1. THE CONTRACTORS SHALL NOTIFY BEACH OPERATIONS DEPARTMENT 48 HOURS PRIOR TO

CONSTRUCTION.

2. THE CONTRACTOR IS TO USE EXTREME CAUTION WHEN WORKING IN OR AROUND AREAS OF

OVERHEAD POWER LINES AND UNDERGROUND UTILITIES.

3. THE CONTRACTOR SHALL NOTIFY THE COUNTY IN WRITING WHEN THE PROJECT IS SUBSTAN-

TIALLY COMPLETE. THE COUNTY WILL REVIEW THE PROJECT TO DETERMINE IF THE PROJECT

IS SUBSTANTIALLY COMPLETE. SUBSTANTIALLY COMPLETE IS DEFINED IN CONTRACT.

4. TRAFFIC CONTROL PLANS IMPLEMENTED WILL BE AS PER FDOT INDEX 600 SERIES .

5. LANE AND SHOULDER CLOSURES: ALL LANE AND SHOULDER CLOSURES MUST BE REQUEST-

ED IN WRITING AND APPROVED A MINIMUM OF 48 HOURS PRIOR TO WORK STARTING.

ALLOW UP TO 2 WEEKS FOR LANE CLOSURE APPROVAL PROCESS. CONTACT LOCAL PERMIT'S

OFFICE FOR MORE DETAILS AT 850- 836-5790 OR 850-836-5742.

6. ANY ROAD OR PROPERTY DAMAGED BY CONSTRUCTION OPERATIONS ARE TO BE RESTORED

OR RECONSTRUCTED AS DIRECTED BY BEACH OPERATIONS DEPARTMENT. IRRIGATION NOTES

1. CONTRACTOR SHALL WARRANTY IRRIGATION SYSTEM FOR ONE YEAR AGAINST DEFECTS IN MATERIAL AND

WORKMANSHIP

2. CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UTILITIES and SUBMITT AN 811 DIG TICKET PRIOR TO

ESCAVATION

3. PVC PIPING TO BE BURIED A MINIMUM OF 12”

4. TRENCHING TO BE A MINIMUN OF 12 “ FROM BACK OF CURB AND BACKFILLED WITH CLEAN COMPACT

MATERIAL

5. All IRRIGATION PIPE MINIMUM SCHEDULE 40 PVC

6. IRRIGATION COMPONENTS SHALL NOT OVERSPRAY ONTO ROADWAY OR MEDIAN OPENING

7. VALVE BOXES SHALL BE INSTALLED FLUSH WITH GRADE

8. IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% COVERAGE OF ALL PLANTED AND SOD AREAS

9. CONTRACTOR TO INSTALL RAIN BIRD PRESSURE COMPENSATING EMMITERS TO ESTABLISH THE FOLLOWIN

FLOW RATES

3 GAL Plant / 1 GAL Per Day

PHASE PLAN

1. PHASE 1: FROM COASTAL CENTER DRIVE TO SOUTH SIDE OF THE CLYDE B WELLS BRIDGE.

2. PHASE 2: FROM US HWY 98 TO COASTAL CENTER DRIVE.

IRRIGATION LAYOUT

SR 83 (US 331) MEDIAN

FROM SR 30 (US 98) TO SOUTH OF CLYDE B. WELLS BRIDGE

PHASE 2

BEGIN

PHASE 2 PHASE 1

END BEGIN

PHASE 1

END

File details come from the government source that posted it. Updated .