SR_83_US_331_Irrigation_Layout_FINAL.pdf

PDF 2 MB Posted

Attached to
Beach Amusements and Activities
Solicitation number
25-26
Issued by
Walton County, Florida

About this file

This is an irrigation layout plan for the SR 83 (US 331) Landscaping Improvements project in Walton County, Florida, in collaboration with the Florida Department of Transportation (FDOT). The project encompasses sod replacement and irrigation system installation along the scenic corridor median from SR 30 (US 98) to north of Chat Holley Road, spanning approximately 256,500 square feet. The work is divided into two phases: Phase 1 extends from Coastal Center Drive to the south side of the Clyde B. Wells Bridge, and Phase 2 runs from US Highway 98 to Coastal Center Drive. A mandatory pre-bid conference is scheduled for October 27, 2025, at 10:00 am, with bid responses due on November 17, 2025, at 3:00 pm. The contract duration is 60 days for substantial completion, with an additional 30 days allocated for punch list completion.

The irrigation system specifications require contractors to install Rain Bird pressure compensating emitters with flow rates of 3 gallons per plant per day and 1 gallon per day for maintenance, using minimum Schedule 40 PVC piping buried at least 12 inches deep and trenched a minimum of 12 inches from the back of curb. Contractors must provide a one-year warranty on the irrigation system against defects in material and workmanship, verify the location of all existing utilities with an 811 dig ticket prior to excavation, and ensure 100% coverage of all planted and sod areas. Additional requirements include 48-hour advance notification to the Beach Operations Department prior to construction, compliance with FDOT Index 600 Series traffic control plans, written approval for all lane and shoulder closures (minimum 48 hours prior), and restoration of any road or property damaged during construction. The total project cost is estimated at approximately $670,000, structured as a lump sum bid with six line items including mobilization, maintenance of traffic, removal of existing sod and site preparation, Zoysia sod installation, irrigation system components and installation, and a 10% owner's contingency. Contractors are required to provide performance and payment bonds, maintain a full-time on-site superintendent, and adhere to liquidated damages of $1,685 per calendar day for project delays.

View the file

Other files

File Type Posted
Beach_Amusements_and_Activities.pdf PDF
Beach_Amusements_and_Activities.pdf PDF
Beach_Amusements_and_Activities.pdf PDF
Attachment_A.pdf PDF
Attachment_B.pdf PDF
Attachment_B.pdf PDF
Attachment_A.pdf PDF
Attachment_A.pdf PDF
Attachment_B.pdf PDF
Contract_No._25-26.pdf PDF
Contract_No._25-26.pdf PDF
Contract_No._25-26.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
Contract_No._25-26.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
SR_83_US_331_Irrigation_Layout_FINAL.pdf PDF
Public_Construction_Bond_(25).doc DOC document
SR_83_US_331_Irrigation_Layout_FINAL.pdf PDF
SR_83_US_331_Irrigation_Layout_FINAL.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
Contract_Plans.pdf PDF
Contract_Plans.pdf PDF
Contract_Plans.pdf PDF
Contract_Plans.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

1. THE CONTRACTORS SHALL NOTIFY BEACH OPERATIONS DEPARTMENT 48 HOURS PRIOR TO

CONSTRUCTION.

2. THE CONTRACTOR IS TO USE EXTREME CAUTION WHEN WORKING IN OR AROUND AREAS OF

OVERHEAD POWER LINES AND UNDERGROUND UTILITIES.

3. THE CONTRACTOR SHALL NOTIFY THE COUNTY IN WRITING WHEN THE PROJECT IS SUBSTAN-

TIALLY COMPLETE. THE COUNTY WILL REVIEW THE PROJECT TO DETERMINE IF THE PROJECT

IS SUBSTANTIALLY COMPLETE. SUBSTANTIALLY COMPLETE IS DEFINED IN CONTRACT.

4. TRAFFIC CONTROL PLANS IMPLEMENTED WILL BE AS PER FDOT INDEX 600 SERIES .

5. LANE AND SHOULDER CLOSURES: ALL LANE AND SHOULDER CLOSURES MUST BE REQUEST-

ED IN WRITING AND APPROVED A MINIMUM OF 48 HOURS PRIOR TO WORK STARTING.

ALLOW UP TO 2 WEEKS FOR LANE CLOSURE APPROVAL PROCESS. CONTACT LOCAL PERMIT'S

OFFICE FOR MORE DETAILS AT 850- 836-5790 OR 850-836-5742.

6. ANY ROAD OR PROPERTY DAMAGED BY CONSTRUCTION OPERATIONS ARE TO BE RESTORED

OR RECONSTRUCTED AS DIRECTED BY BEACH OPERATIONS DEPARTMENT. IRRIGATION NOTES

1. CONTRACTOR SHALL WARRANTY IRRIGATION SYSTEM FOR ONE YEAR AGAINST DEFECTS IN MATERIAL AND

WORKMANSHIP

2. CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UTILITIES and SUBMITT AN 811 DIG TICKET PRIOR TO

ESCAVATION

3. PVC PIPING TO BE BURIED A MINIMUM OF 12”

4. TRENCHING TO BE A MINIMUN OF 12 “ FROM BACK OF CURB AND BACKFILLED WITH CLEAN COMPACT

MATERIAL

5. All IRRIGATION PIPE MINIMUM SCHEDULE 40 PVC

6. IRRIGATION COMPONENTS SHALL NOT OVERSPRAY ONTO ROADWAY OR MEDIAN OPENING

7. VALVE BOXES SHALL BE INSTALLED FLUSH WITH GRADE

8. IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% COVERAGE OF ALL PLANTED AND SOD AREAS

9. CONTRACTOR TO INSTALL RAIN BIRD PRESSURE COMPENSATING EMMITERS TO ESTABLISH THE FOLLOWIN

FLOW RATES

3 GAL Plant / 1 GAL Per Day

PHASE PLAN

1. PHASE 1: FROM COASTAL CENTER DRIVE TO SOUTH SIDE OF THE CLYDE B WELLS BRIDGE.

2. PHASE 2: FROM US HWY 98 TO COASTAL CENTER DRIVE.

IRRIGATION LAYOUT

SR 83 (US 331) MEDIAN

FROM SR 30 (US 98) TO SOUTH OF CLYDE B. WELLS BRIDGE

PHASE 2

BEGIN

PHASE 2 PHASE 1

END BEGIN

PHASE 1

END

File details come from the government source that posted it. Updated .