This is a Justification for Qualification Requirements document for repair and overhaul services for a Trigger Pulse Amplifier component. The item is identified as National Stock Number (NSN) 5996-01-454-4605ZA with part numbers DB060685-2 or 9477861-01, used in the AN/FPS-85 Space Control Sensor system located at Eglin Air Force Base. The engineering support activity 415 SCMS/GUEA manages the qualification requirements under FAR 9.202(a) policy and DoD 4120.24-M Defense Standardization Program procedures, classified as RMSC Category C under the Air Force Maintenance Contract Maintenance Program for Depot Maintenance Activity Group (AFMCI 21-113).
Potential repair sources must satisfy comprehensive qualification requirements prior to contract award, with an estimated completion timeline of 60 days and estimated qualification cost of $0.00 for testing and evaluation. Key qualification requirements include: submitting a prequalification notice to the appropriate contracting officer; certifying possession of required facilities and equipment for repair, inspection, testing, packaging, and storage; verifying a complete engineering data package including Comtech PST Corp. (CAGE 31196) drawings and related documentation; demonstrating repair process compliance with ESA-approved technical specifications and Unique Identification (UID) requirements per DFARS 211.274; and preparing and submitting a qualification test plan detailing verification methods for all performance, environmental, mechanical, and quality assurance requirements at the offeror's expense. Sources meeting specific Source Qualification Waiver Criteria (QWC1 through QWC6) may apply for partial or full waiver of requirements, including prior supply certifications, qualified right-hand or left-hand articles, qualified assembly or subassembly providers, earlier dash number qualifications, similar items with equivalent complexity, or previously qualified companies undergoing corporate changes. Full qualification must be demonstrated before contract award, though qualification approval does not guarantee subsequent contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS.pdf | ||
| SOW.pdf | ||
| PKGRQMT_REPORT.pdf | ||
| UIIEC_REPORT.pdf | ||
| TRNSPDATA_REPORT.pdf | ||
| RDL_REPORT.pdf | ||
| CDRLS.pdf | ||
| ITMDESC_REPORT.pdf | ||
| FA825026Q0012.pdf | ||
| CAVAF.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JUSTIFICATION FOR QUALIFICATION REQUIREMENTS
FAR 9.202(a) Policy and DoD 4120.24-M Defense Standardization Program, Policy and Procedures
29 Dec 2025 Section A & Section B & Section D
RMSC: C (AFMCI 21-113, Contract Maintenance Program for Depot Maintenance Activity Group)
SECTION A: ITEM IDENTIFICATION
1. National Stock Number (NSN): 5996-01-454-4605ZA
2. Part Number (P/N): DB060685-2 or 9477861-01
3. Noun: Trigger Pulse Amplifier
4. Application: AN/FPS-85, Eglin, Space Control Sensor (SCS)
SECTION B:
1. JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT
a. Criticality: Repair/overhaul of this Trigger Pulse Amplifier requires engineering source approval by the engineering support activity 415 SCMS/GUEA in order to maintain the quality of the part.
Failure to procure this Trigger Pulse Amplifier from a fully qualified repair source could negatively affect the mission of the AN/FPS-85.
b. Complexity, Repair Processes, and/or Material Considerations: Inadequate control of characteristics associated with machining, repair, and processing of this Trigger Pulse Amplifier can result in product structural or durability degradation. Close tolerance matching of components is required. Special care and attention is required for surface finish, assembly, and sealing of this Trigger Pulse Amplifier to assure compliance with specified acceptance test requirements.
c. Form, Fit, Function, and Interface: The qualification requirements specified herein are necessary to verify the structural and/or functional integrity and/or fit, form, and interface of the Trigger Pulse Amplifier being procured.
2. REASON WHY QUALIFICATION REQUIREMENT MUST BE DEMONSTRATED PRIOR TO ANY CONTRACT
AWARD
a. Completion of the specified pre-contract award qualification requirements are necessary to assure the government that the offeror is capable of repairing the Trigger Pulse Amplifier in compliance with the applicable technical specification/data within the schedule and economic constraints of our contracts. There are significant technical and schedule risks which can only be minimized by a completion of the requirements prior to contract award.
b. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified are $0.00.
c. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 60 days. This is based on complexity of the Trigger Pulse Amplifier and other factors.
SECTION D: SIGNATURES
JUSTIFICATION FOR QUALIFICATION REQUIREMENTS
29 Dec 2025 Section A & Section B & Section D
X Chief of Contracting Office (COCO)
X 415 SCMS/GUEA Lead Engineer
Engineer Support Activity (ESA)
X 415 SCMS/GUEA Engineer
Engineer Support Activity (ESA)
REPAIR QUALIFICATION REQUIREMENTS
NSN: 5996-01-454-4605ZA
P/N: DB060685-2 or 9477861-01 Noun: Trigger Pulse Amplifier
Application: AN/FPS-85
29 Dec 2025 Supporting Information
Qualification Requirement Cost Estimate
Estimate the likely cost for testing and evaluation which will be incurred by the potential offeror to become qualified. This is a requirement of FAR 9.202(a)(1)(ii) and 10USC2319(b)(3) (The following categories may not apply in all cases. The product engineer should identify the costs applicable to the project and indicate N/A on all sections that do not apply.)
Total cost is $ 0.00
Section A. Shipping, if required, use DD Form 1654, Evaluation of Transportation Cost Factors to develop the information. Refer any questions to the Procurement Contracting Officer for cost estimation.
Section B. Dimensional/Electronic Verification. Contact the science/engineering laboratory to obtain cost estimates (bids) for tests such as:
$ 0.00
a. Chemical
b. Metallurgical $ 0.00
(1) Destructive
(2) Non-Destructive
c. Dimensional
d. Electronic
e. Mechanical
f. Non-Destructive Inspection
Section C. Nuclear Hardness [This includes cost of shock, vibration, and Electro-Magnetic Pulse
(EMP)]. Contact Systems Engineering Integration and Test Division for hourly rate.
Section D. Form, Fit, Function and Interface. Contact your organizational Production Management Specialist (PMS) to obtain information on the same or similar item where work has been accomplished in the past using AFMC Form 206, Temporary Work Request.
Section E. Original Equipment Manufacturer (OEM) Qualification Testing (If required) $ 0.00
a. Laboratory Costs (Costs are directly dependent on the type of testing to be accomplished and the location and duration of the testing. For example, landing gear laboratory testing is normally accomplished on a dynamometer and costs vary from $25,000 to $500,000 depending on the depth of testing. Aircraft and missile testing will vary as the requirement dictates and the cost will have to be identified by the source of testing).
b. Flight/Data Reduction & Analysis Costs.
Section F. Travel by Contractor to Test Site (if required) $ 0.00
a. Lodging
b. Per Diem
c. Rental Cars
d. Incidentals (Verified)
Section G. SAR Package Development/Evaluation Cost: A potential new source’s development of a Source Approval (SAR) package may cost as much as:
$10,000
In addition, the cost incurred for Government evaluation of their SAR may be as much as: $3,000
Evaluation cost may be born by the government if it is in the best interest of the Government to qualify alternate sources.
P/N: DB060685-2 or 9477861-01
29 Dec 2025 Supporting Information
29 Dec 2025 C
5996-01-454-4605ZA
DB060685-2 or 9477861-01
Trigger Pulse Amplifier
AN/FPS-85
415 SCMS/GUEA
$0.00 (cost estimate) 60 (time completion estimate)
P/N: DB060685-2 or 9477861-01
29 Dec 2025 Section C 1/3
SECTION C:
1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE
a. Prequalification Notice: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Trigger Pulse Amplifier.
b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to repair, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
c. Data Verification: The offeror must verify that they have a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum
d. Comtech Pst Corp. (CAGE 31196) drawings 9477861-01 (CAGE 98749) 9477860 and related drawings. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
e. Repair Process Verification: The offeror must repair this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 415 SCMS/GUEA. The offeror shall also identify its sources for materials and its standards for internally used processes.
f. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 415 SCMS/GUEA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by the ESA-approved engineering data package.
g. Qualification Article Verification: N/A
h. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified are $0.00.
i. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 60 days. This is based on complexity of the Trigger Pulse Amplifier and other factors.
P/N: DB060685-2 or 9477861-01
29 Dec 2025 Section C 2/3
j. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.
k. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved repair source for this item. Approval, however, does not guarantee subsequent contract award.
P/N: DB060685-2 or 9477861-01
29 Dec 2025 Section C 3/3
2. SOURCE QUALIFICATION WAIVER REQUIREMENTS
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:
a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).
b. QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.
c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.
d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.
e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.
f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the repair process.
g. QWC7: N/A
| Estimate the likely cost for testing and evaluation which will be incurred by the potential offeror to become qualified This is a requirement of FAR 9202a1ii and 10USC2319b3 The following categories may not apply in all cases The product engineer should identify the costs applicable to the project and indicate NA on all sections that do not apply: | |
| Total cost is: | |
| 000Section A Shipping if required use DD Form 1654 Evaluation of Transportation Cost Factors to develop the information Refer any questions to the Procurement Contracting Officer for cost estimation: | |
| 000a Chemical: | |
| b Metallurgical: | |
| 0001 Destructive: | |
| 0002 NonDestructive: | |
| 000c Dimensional: | |
| 000d Electronic: | |
| 000e Mechanical: | |
| 000f NonDestructive Inspection: | |
| 000Section C Nuclear Hardness This includes cost of shock vibration and ElectroMagnetic Pulse EMP Contact Systems Engineering Integration and Test Division for hourly rate: | |
| 000Section D Form Fit Function and Interface Contact your organizational Production Management Specialist PMS to obtain information on the same or similar item where work has been accomplished in the past using AFMC Form 206 Temporary Work Request: | |
| 000a Laboratory Costs Costs are directly dependent on the type of testing to be accomplished and the location and duration of the testing For example landing gear laboratory testing is normally accomplished on a dynamometer and costs vary from 25000 to 500000 depending o n the depth of testing Aircraft and missile testing will vary as the requirement dictates and the cost will have to be identified by the source of testing: | |
| 000b FlightData Reduction Analysis Costs: | |
| Section F Travel by Contractor to Test Site if required: | |
| 000a Lodging: | |
| 000b Per Diem: | |
| 000c Rental Cars: | |
| 000d Incidentals Verified: | |
| 10000: | |
| 3000Evaluation cost may be born by the government if it is in the best interest of the Government to qualify alternate sources: | |
| 2025-12-29T11:42:18-0700 | |
| DAM.NGHIA.TRUNG.1466333596 |
| 2025-12-29T12:09:58-0700 | |
| KLEMM.VAL.REID.1286909821 |
| 2026-01-07T06:46:48-0700 | |
| STARK.DAVID.J.1254575271 |
File details come from the government source that posted it. Updated .