Letter RFP (CAGE 04939) SME HMD Transition Support_Amendment 0002_12 JUL 2022.pdf
PDF 193 KB Posted
- Attached to
- SME HMD Hellfire Transition Support
- Solicitation number
- SPRRA2-22-R-0021
- Issued by
-
Defense Logistics Agency Aviation
About this file
This letter request for proposal (RFP) solicits offers to provide subject matter expert and informal training services to assist with the transition of the Hellfire Missile Depot capability from a government owned contractor operated facility to a government owned government operated facility at Letterkenny Army Depot. Offerors are requested to provide pricing for technical expertise and training on specified Hellfire missile maintenance and repair tasks for fiscal years 2022 through 2023, with an option for 2023 through 2024. Responses are due by July 20, 2022. The Defense Logistics Agency Aviation issued the RFP pursuant to Lockheed Martin's Captains of Industry contract, and prospective offerors are advised that another supplier's interest could result in a formal solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEFENSE LOGISTICS AGENCY
Aviation
5201 MARTIN ROAD
Redstone Arsenal, Alabama 35898
IN REPLY REFER DLA AHCA
July 12, 2022
Lockheed Martin Corporation
5600 W Sand Lake Rd
MP 125
Orlando, FL 32819-8907
RE: Letter Request for Proposal SPRRA2-22-R-0021 AMD 0002.
This purpose of this amendment is to change the following requirements:
FROM:
a. The Contractor shall assist in development of the HELLFIRE Missile Repair training procedures and provide hands-on depot level support to the U.S. Government (USG) workforce.
b. The Contractor shall monitor HMD facilities and equipment on-site.
c. The Contractor shall provide on-site support for equipment turn, documentation, inventory reconciliation and assist in any way needed for packaging and shipment of equipment and parts.
d. The Contractor shall assist with base access to the HMD facility at Anniston, AL. The Contractor shall travel to
Chambersburg, PA up to six (6) times to provide on-site support to LEAD.
TO:
a. The Contractor shall provide only the following Technical Expertise and Informal Training for the maintenance and support of the HELLFIRE missile:
• HFII Guidance Section Test/Repair - MSALSTS, METS GS Troubleshooting, METS ESS GS Testing
• HFII Sub-assy Repair (Sensor Group) S/G
• HFII Sub-Assy Repair (Control Interface Group) CIG
b. The Contractor shall travel to Chambersburg, PA up to three (3) times to provide on-site support to LEAD.
c. The Contractor shall provide remote IPT support when transition to LEAD is complete.
Ms. Borica Joksimovic, The Defense Logistics Agency (DLA) wishes to procure services from Lockheed Martin (CAGE 04939) to assist with the transition of the HELLFIRE Missile Depot (HMD) capability. This requirement will become a new Subsumable contract which will fall under the Lockheed Martin Captains of Industry (COI) contract, SPE4AX-22-D-9000. The requirements listed above fall within the general timeline located in the Performance Work Statement (PWS) previously submitted.
DLA Contracting Team Identification:
Jennifer Triolo, DLA Aviation- Huntsville Contracting Officer, E-mail: jennifer.triolo@dla.mil, Phone: (256) 303-3127
Kiaunna Blevins, DLA Aviation- Huntsville Contract Specialist, E-mail:
kiaunna.blevins@dla.mil, Phone: (256) 214-9518
A. Introduction and Scope:
This Letter RFP identifies the tasks to be performed by Lockheed Martin to assist with the transition of the
HMD capability from a Government Owned Contractor Operated (GOCO) facility located in Anniston, AL to a mailto:jennifer.triolo@dla.mil mailto:jennifer.triolo@dla.mil mailto:kiaunna.blevins@dla.mil, Government Owned Government Operated (GOGO) facility, Letterkenny Army Depot (LEAD), located in
Chambersburg, PA.
The goal of the tasks is to leverage original equipment manufacturer (OEM) expertise and over twenty years’ experience operating the HMD as the capability transitions to the organic industrial base (OIB). This will streamline the training of the OIB workforce, physical movement of the HMD property/equipment, turn in of the
GOCO facilities, OIB workflow processes, and OIB spare parts sourcing.
B. Please adhere to the following timelines:
1. Indicate your intention to provide a responsive add-on proposal to this RFP in writing within five (5) business days. It is requested that a negative response be accompanied by an explanation. Responses shall be provided to the contracting team identified above.
2. Your response is requested as soon as possible. If you choose to submit an add-on proposal, it shall be submitted before 4:00 p.m. Central Standard Time (CST), July 20, 2022.
C. Instructions:
1. The Captains of Industry (COI) contract (SPE4AX-22-D-9000) shall govern the Contractor’s and Government’s rights and obligations.
2. Contract clauses are governed by the COI contract, SPE4AX-22-D-9000. However, the COI contract allows for clauses to be removed at the subsumable level. If Lockheed Martin takes exception to any clauses within the COI, both parties will discuss and reach an agreement to remove any non-applicable clauses prior to award.
3. This RFP is not an authorization to start work.
4. Please ensure that you read the entire RFP, prior to submitting your proposal. Your proposal shall be in full compliance with the instructions of this RFP.
5. Your proposal shall remain valid for a minimum of one hundred and eighty (180) days from receipt by the government.
D. Proposal Content/Cost/Price Supporting Documentation. At a minimum, your proposal shall include the following:
1. The Government contemplates Firm-Fixed-Pricing for this add-on item in accordance with the overarching basic contract, and requests pricing for one (1) year with the possible option of a second year. This is an
RFP for support requirements generated by the U.S. Army Aviation and Missile Command (AMCOM) and the AMCOM Logistics Center (ALC) in support of the HELLFIRE Missile Depot (HMD).
2. The offeror shall prepare one summary schedule. Along with the summary schedule, the offeror shall provide fully supportable cost data which substantiates the offeror’s summary schedule for the requirement. Submission must include working excel formulas, if applicable. Submission shall be in accordance with FAR 15.408, Table 15-2, Instructions for Submitting Cost/Price Proposals When
Certified Cost or Pricing Data are required. Back up documentation shall detail the labor categories to be used, labor hours proposed by category, material and equipment cost, and a total cost breakdown. The offeror shall also provide supporting cost/price documentation for all proposed subcontractors, to include the proposed type of subcontract.
a. To comply with this solicitation, the offeror is required to price the following Fiscal Years: Fiscal
Year 2022 (FY22) through Fiscal Year 2023 (FY23) with an option for FY23-24.
b. Per FAR 15.408 Table 15-2, cost analyses must be performed by the offeror for subcontracts identified in the Consolidated Bill of Materials as having total proposed pricing that exceeds the regulatory threshold indicated in FAR Part 15.403-4. Fair and reasonable subcontractor analysis in accordance with FAR 15.404-3(b) Subcontract Pricing Considerations shall be provided.
c. An un-sanitized cost break-down (all cost information, rates/dollars) shall also be provided in a
Microsoft Excel File.
d. In support of the proposed Indirect Expense Rates, IOTs and its subcontractor(s) shall provide documentation of the most recent Indirect Expense Rates, to include, at least one of the following (A, B, or C):
A. Forward Pricing Rate Agreements (FPRAs) with DCAA or DCMA
B. Forward Pricing Rate Recommendations (FPRR) from DCAA or DCMA
C. Forward Pricing Rate Proposal (FPRP), Approved Provisional Rates Proposal or other statement of current rates including three (3) years of Incurred Cost Submissions to DCAA detailing pools and bases (by expense accounts) information which validates the calculations or Three (3) years historical actual detailing pools and bases (by expense accounts) information which validates the calculations.
Note: The rates reflected in the FPRA, FPRR, FPRP, Approved Provisional Rates Proposal or other statement of current rates shall directly match the proposed rates as detailed in the proposal. If the rates do not match, the offeror shall provide sufficient detail explaining how the proposed rates are realistic.
e. Identify key business unit personnel related to contracting, technical and pricing questions and known DCMA or DCAA business unit points of contact (POC’s) to expedite the question/review process.
f. In accordance with FAR clause 52.215-22, Limitation on Pass-Through Charges, if Lockheed
Martin intends to subcontract more than 70 percent of the total cost of work to be performed under the resulting add-on, Lockheed Martin shall identify in its proposal a description of the value-added provided by Lockheed Martin as related to the work to be performed by the subcontractor(s) as defined by FAR clause 52.215-22.
g. Lockheed Martin shall identify and address in its proposal all actual or potential Organizational
Conflicts of Interests (OCIs), per FAR 9.5, or state that there are no known potential OCIs. If any actual or potential OCIs are identified, then Lockheed Martin shall submit a mitigation plan.
h. All communications SHALL be submitted in writing ONLY AND directly to the individual(s)’s email address identified on the first page of this RFP. Lockheed Martin shall not contact any other
Government personnel other than the person(s) identified above. Contacting any Government personnel other than the individual(s) identified above could result in an organizational conflict of interest (OCI).
i. Assumptions, terms, conditions, caveats or exceptions submitted within your proposal, in response to this RFP, may or may not be accepted or incorporated into the subsumable contract. Both parties will discuss prior to award if the need arises.
j. Lockheed shall submit their Small Business Plan with their proposal as a separate document
SBxxxx.doc. This attachment will be used to ensure Lockheed Martin is on track to meet the goals established in the base contract.
E. Requirements:
a. The Contractor shall provide only the following Technical Expertise and Informal Training for the maintenance and support of the HELLFIRE missile:
• HFII Guidance Section Test/Repair - MSALSTS, METS GS Troubleshooting, METS ESS GS
Testing
• HFII Sub-assy Repair (Sensor Group) S/G
• HFII Sub-Assy Repair (Control Interface Group) CIG
b. The Contractor shall travel to Chambersburg, PA up to three (3) times to provide on-site support to
LEAD.
c. The Contractor shall provide remote IPT support when transition to LEAD is complete.
Be advised; however, that this requirement has been advertised in beta.SAM.gov website for viewing by the general public. In the event another supplier indicates interest in responding to the requirement as a result of viewing the synopsis, a formal solicitation will be issued to accommodate that supplier.
If you have any questions, feel free to contact Kiaunna Blevins at Kiaunna.blevins@dla.mil; phone number
(256) 214-9518.
Sincerely, Jennifer Triolo
Contracting Officer, DLA Huntsville
Jennifer.Triolo@dla.mil mailto:Kiaunna.blevins@dla.mil mailto:Jennifer.Triolo@dla.mil
256-303-3127
| 2022-07-12T16:08:19-0500 | |
| TRIOLO.JENNIFER.LYNN.1008374402 |
File details come from the government source that posted it. Updated .