Technical-Requirements - PVS-14 Battery Compartment.pdf
PDF 539 KB Posted
- Solicitation number
- SPRBL1-25-R-0007
About this file
This Technical Requirements Document outlines specifications for the AN/PVS-14 Battery Compartment (NSN 5855-01-523-4058, Part Number A3297309), a critical component for the Monocular Night Vision Device (MNVD). The document details extensive quality management, testing, and configuration baseline requirements, including a comprehensive Failure Reporting, Analysis, and Corrective Action System (FRACAS), Counterfeit Risk Management (CRM) Program, and Obsolescence Management process.
Key technical requirements include compliance with multiple military standards and specifications, such as MIL-STD-129R, MIL-STD-2073-1D, and MIL-PRF-49324. The document mandates strict quality control measures, including a higher-level quality management system (ANSI/ASQ 9001:2015), detailed first article testing protocols, and specific reporting requirements for any product failures or variations. Contractors must prepare multiple deliverables, including Engineering Change Proposals, Variance Requests, First Article Test Reports, and Failure Analysis Reports, all subject to rigorous government review and approval processes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRBL125R0007_FV.pdf | ||
| Technical-Requirements - PVS-14 Battery Compartment - July 2025 - Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A SPRBL1-25-R-0007 Page 1 of 17 Issue: 18-JUN-2025
TECHNICAL REQUIREMENTS DOCUMENT
AN/PVS-14 Battery Compartment (5855-01-523-4058)
Prepared By:
X Brandon Hepner
Reviewed By:
X Tim Langan
TABLE OF CONTENTS
CONFIGURATION BASELINE
Quality Management Systems - Requirements
PACKAGING
Wood Packing Material Military Packaging
SPECIALIZED TESTING
Failure Reporting, Analysis, and Corrective Action System (FRACAS) Counterfeit Risk Management (CRM) Program Obsolescence Management Reporting Counterfeit or Suspect Counterfeit parts
CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1
CDRL List Individual CDRLs Test/Inspection Report
DI-NDTI-80809B
Military and Federal Standards MIL-STD-129R with Change 2 Military Marking for Shipment and Storage MIL-STD-2073-1D with Change 4 Standard Practice for Military Packaging
Military and Federal Specifications
MIL-PRF-49324 Performance Specification, Monocular Night Vision Device, AN/PVS-14
Other Documents
Commercial Documents ISPM Number 15 Regulation of Wood Packaging in International Trade ANSI/ISO/ASQ(E) Q9001-2015 American National Standard, Quality Management Systems
Requirements EIA-649-1 Configuration Management Requirements for Defense Contracts IPC J-STD-001 Requirements for Soldered Electrical and Electronic Assemblies
CONFIGURATION BASELINE
The applicable Configuration Baselines (CB), for the listed Configuration Item (CI) and/or Computer Software Configuration Item (CSCI), are as listed in the table below.
NSN Nomenclature Part Numbers/Drawings 5855-01-523-4058 Battery Compartment A3297309
Each CI/CSCI, as developed/built and delivered, shall conform to the cited CB and (if applicable) all subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO). The Contractor shall establish a Configuration Management Program in accordance with EIA-649-1.
No changes or departures from the CB are acceptable except for changes or departures which are submitted in accordance with EIA-649-1, CDRL A001, CDRL B001, and CDRL C001, and are approved by the Government Configuration Manager (C Mgr.) or Configuration Management Officer (CMO) and which are made applicable to the contract by the PCO.
An Engineering Change Proposal (ECP) describes the changes to be made to the CI/CSCI and all associated Government documents and data that are affected by the proposed engineering change. ECP should be prepared in accordance with EIA-649-1, CDRL A001, and DI-SESS-80639.
A Request For Variance (RFV) is a specific written authorization to depart from a particular requirement(s) of an item’s approved configuration documentation for a specific number of units or a specified period of time, either as an advance request or after the fact. The contractor shall identify the impact of the RFV on performance, operational readiness and logistics support of the affected CIs. The Government may require consideration for any RFV. RFV should be prepared in accordance with EIA-649-1, CDRL B001, and DI-
SESS-80640.
A Notice of Revision (NOR) shows the detailed changes that must be made to technical documentation, except specifications, following approval of an ECP. A NOR shall be submitted for each document affected by an ECP. NOR should be prepared in accordance with EIA-649-1, CDRL C001, and DI-SESS-80642.
ECPs and RFVs shall include all necessary information for the government to review and make an informed decision and all testing shall be performed on a statistically representative sample. NORs shall include the complete original drawings for the affected parts (highlighted to show items/areas to be changed) and the complete proposed change drawings. The ECPS and RFVs shall be numbered sequentially with a separate and unique numbering system for this contract.
Quality Management Systems - Requirements The Contractor shall comply with a higher-level quality management system such as the ANSI/ASQ 9001:2015, Quality Management Systems - Requirements, or equivalent in all production facilities involved in this contract.
The Contractor shall provide and maintain a comprehensive quality management system within its facilities which addresses Hardware and Software/Firmware Quality. The Contractor shall flow down all quality requirements to sub-Contractors as they apply to procured material and services.
The Contractor shall maintain a quality/inspection system acceptable to the Government covering supplies under this contract and shall for acceptance, present only those supplies to the Government, found by the Contractor to be in conformity with all contractual requirements. As part of the system, the Contractor shall maintain all inspections/testing records and these shall be made available to the Government upon request. The Government reserves the right to make in process reviews and/or witness testing as reasonably required. The Government has the right either to reject or to require correction of nonconforming supplies and may reject nonconforming supplies with or without disposition instructions.
PACKAGING
Wood Packing Material Wood packing material includes pallets. See DLAD T/Q Requirement RP001 DLA Packaging Requirements for Procurement, which includes requirements for treatment of wood packaging material.
Military Packaging DS7029 and/or DS7033 Preservation, Packing and Marking Instructions
DS7029 - DS7033 LEGEND
Qty Quantity Prot Req Protection Required PKG-REF Packaging Reference (Military/Federal Specification or Standard) SPI Special Packaging Instruction LPK Level of Packing QUP Quantity per Unit Pack ICQ Intermediate Container Quantity Pkg Reqmt Codes Packaging Requirement Codes when PKG-REF cites MIL-STD-2073 The below codes are for special markings:
PC Project Code WG Warranty/Guarantee SL Shelf Life BC Bar Code FMS Foreign Military Sales
DS7029 - DS7033
NSN Prot Req PKG-REF or SPI LPK QUP ICQ Special Markings
Pkg J. J J J J J J J J J Reqmt I. II. III. IV. V. VI. VII. VII.a IX X Codes (MP) (CD) (PM) (WM) (CD) (CT) (UC) (IC) (PK) (SM) 5855-01-523-4058
Military MIL-STD-2073-1E chg 4 B 001 - 10 1 00 00 NA A ED 00 N 00 BC
SPECIALIZED TESTING
The Contractor shall perform Quality Conformance Inspection IAW QAP A3297309 and the Technical Data Package.
The Contractor shall prepare and submit a Quality Validation Plan in accordance with CDRL D001. In addition to the information required by DI-NDTI-81307A, this submission shall contain:
a. The delineation and allocation of tests to be performed on each of the First Article units and the order of such tests.
b. The delineation and allocation of tests to be performed as Conformance Inspection on subsequent production lots, to include the order of tests and the sampling plan.
c. Step-by-tep test procedures for each test and the data sheets to be employed to document the results of testing.
d. Identification of required test facilities, equipment and personnel.
e. Test milestones, schedules and the contractor’s test readiness posture.
f. A table which cross references the paragraph number of the specification requirement (including a brief description of the requirement) and the associated paragraph number of the Quality Validation Plan.
A FAT Report shall be prepared and submitted in accordance with FAR 52.209-3 and CDRL E001. The FAT Report shall be complete, accurate, and readable and shall provide sufficient data to determine that the hardware item meets all the requirements delineated in the contract. The report will include the following.
1) General Data.
a. Contractor's name and address.
b. Contract number.
c. Nomenclature, type number and (if assigned) stock number of item represented by the First Article.
d. Name and address of plant where First Article was fabricated and assembled.
e. Place and date of performance of tests.
f. Identification (including date) of applicable equipment specifications and associated amendments.
g. Sample size or quantity submitted for test or inspection.
2) Cross Reference. A table which cross-references the paragraph numbers of the specification, the test procedures, and data sheet entry.
3) Test Results. Complete test results showing actual or quantitative observations and all required calculations.
‘GO/NOGO’ data is allowable (under certain circumstances) only with prior Government approval. Allowable tolerances for each parameter shall be presented. Test data should also include the date that the test was performed, name and signature of tester, name and signature of the Government verifier/witness and serial number of the equipment. Test results shall cite detailed qualitative and quantitative data results such as test categories, test conditions, test methods employed, and types of inspection and test equipment used during the test or inspection.
4) FAT Failures. FAT failures shall list all requirements not complied with during FAT. If none, this should be explicitly stated. For each requirement not met, a corrective action to remove the noncompliance will be proposed. This corrective action must include retest or other verification that the corrective action does remedy the problem/failure. The corrective action will address changes in design or manufacturing process which will preclude this deficiency in subsequent production units. Verified corrective action must be implemented prior to contractor entering production.
5) FAT/Production Discrepancies. Any Government approved difference between the parts, materials and processes used to manufacture FAT samples and production units shall be documented in the FAT report.
The contractor shall report each conformance test failure verbally to the Government Quality Assurance Representative (QAR) and the Technical Activity (see Block 16 of DD Form 1423 for CDRL F001) within one working day. Within fifteen working days of failure occurrence, the contractor shall submit a written failure report through the cognizant QAR to the Technical Activity as required by CDRL F001. In addition to the information required by DI-RELI-81315, the report shall include:
a) Contractor's name, address and applicable contract number.
b) Number of units in sample and number of failed units subjected to test.
c) Root cause of failure.
d) Environmental re-inspection plan to validate the corrective action, consisting of all applicable environmental test and examinations. The plan shall include identification of previous functional, environmental and reliability tests, if any, invalidated by the corrective action changes and recommendations of those tests which should be repeated to prove the corrective action.
e) Proposed disposition of items in the inspection lot at time of failure of any and all inspections during environmental test and of items manufactured under the same conditions and which the Government considers subject to the same failure mechanism.
The contractor shall implement the proposed corrective action on all units in the lot, select new samples and conduct environmental re-tests and other required re-testing in accordance with the retest plan in the Governement approved Failure Analysis and Corrective Action Report. Results of the environmental re-tests shall be submitted in accordance with DI-NDTI-80809B as implemented by CDRL G001.
Final acceptance and shipment approval will be withheld until results of the environmental retests substantiate that the corrective action was effective, as authorized by the PCO.
6) Additional FAT Information. The Government may require that FAT be repeated over the life of this contract to requalify the product; should the contractor fail to deliver any of these items for a period of one year, make changes to products and/or processes, change a supplier of a component, or move the production line.
The Government reserves the right to waive FAT for contractors that have been previously qualified and have completed FAT. The contractor shall be required to provide evidence that their product has been previously qualified by the Government and has maintained production, with deliveries to the Government, prior to the Government approving a waiver. The Government also reserves the right to require an FAT if the contractor fails to deliver for a year or there are design changes which require requalification.
Failure Reporting, Analysis, and Corrective Action System (FRACAS) The Contractor shall establish and utilize a closed-loop FRACAS as its mechanism for monitoring and communicating (throughout the organization) descriptions of: test and field failures, analyses of failure modes and root cause failure mechanisms, the status of design and/or process corrective actions, risk-mitigation decisions, the effectiveness of corrective actions, and lessons learned. The Contractor shall address all failure modes found on assemblies and subassemblies, to include, but not limited to, COTS, NDI, GFE, and software as applicable. The FRACAS shall include all failure modes, from initial modeling and analysis through the fielding of the system. The Contractor shall aggressively address and mitigate failure modes in a timely manner, consistent with their impact on safety, reliability, performance, and total life cycle cost. The Contractor shall mitigate failure modes to ensure that reliability requirements are met, and reliability does not degrade during production or in the field. The Contractor shall provide the Government with failure analysis and corrective action reports.
Counterfeit Risk Management (CRM) Program The Contractor shall implement a Counterfeit Risk Management Program on this contract which identifies processes used for risk assessment, risk mitigation, detection, avoidance, reporting, and disposition of suspect counterfeit and counterfeit items. The CRM Program shall be integrated into the requirements of the higher level Quality Management System (QMS) in effect on this contract (e.g., AS9100, ISO9001). The CRM Program shall be consistent with SAE AS6174, Counterfeit Materiel: Assuring Acquisition of Authentic & Conforming Materiel, and SAE AS5553, Counterfeit Electrical, Electronic, and Electromechanical (EEE) Parts;
Avoidance, Detection, Mitigation, and Disposition for Electronic, Electrical and Electromechanical (EEE) parts.
An existing government approved “Contractor Counterfeit Electronic Part Detection and Avoidance System” per DFARS 252.246-7007, is consistent with SAE AS5553.
Obsolescence Management The Contractor shall integrate its DMSMS or Obolescence Management processes with its Counterfeit Risk Management processes to ensure that counterfeit risk decisions properly consider obsolescence issues and vice versa.
Reporting Counterfeit or Suspect Counterfeit parts Reporting Counterfeit or Suspect Counterfeit parts. The Contractor shall report all counterfeit or suspect counterfeit parts to the PCO within 5 business days. The Contractor shall also report all counterfeit parts and suspect counterfeit parts to GIDEP within 60 days of making that determination. In reporting this to the PCO, the Contractor shall also address the impact of this determination on current contract requirements.
CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1
CDRL List
CDRL
Data Line No. DID Identification Title A001 DI-SESS- 80639 Engineering Change Proposal B001 DI-SESS- 80640 Request for Variance C001 DI-SESS- 80642 Notice of Revision D001 DI-NDTI- 81307A First Article Qualification Test Plan – Quality Validation Plan E001 DI-NDTI- 80809B Test/Inspection Report – First Article Test Report F001 DI-RELI- 81315 Failure Analysis and Corrective Action Report G001 DI-NDTI- 80809B Test/Inspection Report – Environmental Retest
Individual CDRLs
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Original Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9000 A TDP X TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Battery Compartment TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A001 Engineering Change Proposal
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-80639 AMSEL-LCE-INV INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT ASREQ SEE ITEM 16 b. COPIES
SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
SEE ITEM 16
Reg
Repro
16. REMARKS:
The contractor shall prepare and submit Engineering Change Proposal in accordance with EIA-649-1 and this DID when a change to a contractual baseline document is deemed necessary.
The Government will have 30 days to review, accept, and/or comment on the draft submission. The contractor shall incorporate changes into the electronic deliverable within 30 days after receipt of Government comments. The Government will have 30 days to review, accept, and/or comment on the final submission.
Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.
E-mail notification is required with any electronic submission.
AMSEL-LCE-INV
FCDD-ISE-HDD
QAR
PCO
ACO
15. TOTAL 0 5 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Brandon Hepner
FCDD-ISE-HDD
Mechanical Engineer
Timothy Langan
FCDD-ISE-HDD
Branch Chief
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9000 A TDP X TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Battery Compartment TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
B001 Request For Variance
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-80640 AMSEL-LCE-INV INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT ASREQ SEE ITEM 16 b. COPIES
SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
16. REMARKS: The contractor shall prepare and submit Request For Variance in accordance with EIA-649-1 and this DID when a departure from a contractual baseline document is deemed necessary.
The Government will have 30 days to review, accept, and/or comment on the draft submission. The contractor shall incorporate changes into the electronic deliverable within 30 days after receipt of Government comments. The Government will have 30 days to review, accept, and/or comment on the final submission.
Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.
E-mail notification is required with any electronic submission.
AMSEL-LCE-INV
FCDD-ISE-HDD
QAR
Brandon Hepnet
FCDD-ISE-HDD
Mechanical Engineer
Timothy Langan
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
009000 A TDP X TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Battery Compartment TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
C001 Notice of Revision
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-80642 AMSEL-LCE-INV INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT ASREQ SEE ITEM 16 b. COPIES
SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
16. REMARKS: The contractor shall prepare and submit Notice of Revision in accordance with EIA-649-1 and this DID when a change to a contractual baseline document is deemed necessary.
The Government will have 30 days to review, accept, and/or comment on the draft submission. The contractor shall incorporate changes into the electronic deliverable within 30 days after receipt of Government comments. The Government will have 30 days to review, accept, and/or comment on the final submission.
Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.
E-mail notification is required with any electronic submission.
AMSEL-LCE-INV
FCDD-ISE-HDD
QAR
Brandon Hepner
FCDD-ISE-HDD
Mechanical Engineer
Timothy Langan
ONTRACT DATA REQUIREMENTS LIST
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9000 A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Battery Compartment TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
D001 First Article Qualification Test Plan Quality Validation Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-NDTI-81307A AMSEL-LCE-INV INSER
T
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
DD ONE/P 30 DAC b. COPIES
SECT.
B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
A SEE ITEM 16
16. REMARKS: Submit draft via LT. Government requires 30 days for review/comments. Submit final within 30 days of receipt of Government comments, via DD 250.
Each draft and the final submissions shall be delivered in a format, compatible with Microsoft Office software delivered by e-mail.
Alternative delivery media may be discussed with the Contracting Officer prior to delivery. E-mail notification is required with any electronic submission.
AMSEL-LCE-INV
15. TOTAL 4 4 0
Brandon Hepner
FCDD-ISE-HDD
Mechanical Engineer
Timothy Langan
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9000 A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Battery Compartment TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
E001 1BTest/Inspection Report
First Article Test Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
0BDI-NDTI-80809B
AMSEL-LCE-INV INSER
T
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
DD OTIME 90 DAC b. COPIES
SECT.
B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
16. REMARKS: Submit report of First Article Test results via DD 250.
Government requires 14 days to provide comments/approval.
Submit revised report within 7 days after receipt of government comments. Government requires 7 days to provide comments/approval.
All deliveries shall be delivered in a format, compatible with Microsoft Office software delivered by e-mail. Alternative delivery media may be discussed with the Contracting Officer prior to delivery. E-mail notification is required with any electronic submission.
AMSEL-LCE-INV
15. TOTAL 4 4 0
Brandon Hepner
FCDD-ISE-HDD
Mechanical Engineer
Timothy Langan
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9000 A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Battery Compartment TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
F001 Failure Analysis and Corrective Action Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-81315B AMSEL-LCE-INV INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
LT ASREQ SEE ITEM 16 b. COPIES SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
16. REMARKS: Data Item Description (DID) reference to MIL specs/stds is for guidance only.
Failure reports shall be submitted within 10 days of failure occurrence.
Technical Activity Representative is Brandon Hepner.
Each draft and the final submissions shall be delivered in a format, compatible with Microsoft Office software delivered by e-mail.
Alternative delivery methods may be discussed and agreed upon with the Contracting Officer prior to delivery. E-mail notification is required with any electronic submission.
AMSEL-LCE-INV
FCDD-ISE-HDD
PCO
ACO
QAR
15. TOTAL 5 5 0
Brandon Hepner
FCDD-ISE-HDD
Mechanical Engineer
Timothy Langan
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9000 A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Battery Compartment TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
G001 Test/ Inspection Report Environmental Retest
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-NDTI-80809B AMSEL-LCE-I INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
LT ASREQ SEE ITEM 16 b. COPIES SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
16. REMARKS: Submit results of Environmental retest(s) NLT 15 days after completion of retest(s).
All deliveries shall be delivered in a format, compatible with Microsoft Office software delivered by e-mail.
Alternative delivery media may be discussed with the Contracting Officer prior to delivery.
E-mail notification is required with any electronic submission.
AMSEL-LCE-I
ACO
QAR
15. TOTAL 0 5 5
Brandon Hepner
FCDD-ISE-HDD
Mechanical Engineer
Timothy Langan
| Test/Inspection Report |
| DI-NDTI-80809B |
| CONFIGURATION BASELINE |
| Quality Management Systems - Requirements |
| PACKAGING |
| Wood Packing Material |
| Military Packaging |
| SPECIALIZED TESTING |
| Failure Reporting, Analysis, and Corrective Action System (FRACAS) |
| Counterfeit Risk Management (CRM) Program |
| Obsolescence Management |
| Reporting Counterfeit or Suspect Counterfeit parts |
| CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1 |
| CDRL List |
| Individual CDRLs |
| 2025-07-10T09:36:45-0400 | |
| HEPNER.BRANDON.T.1298292730 |
| 2025-07-11T08:42:58-0400 | |
| LANGAN.TIMOTHY.L.1291041295 |
File details come from the government source that posted it. Updated .