SPM1C1-10-R-0045 Amendment 05 Clarifications and Closing Date Extended to 07 May 2010 3 00pm EST

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE F PAGES

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

O

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE

DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. VE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES ( such as changes in paying office, appropriation date, etc .) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. REEMENT IS ENTERED INTO

PURSUANT TO AUTHORITY OF:

D. HER (Specify type of modification and authority)

THIS CHANGE ORDER IS ISSUED PURSUANT TO:

THE ABO

THIS SUPPLEMENTAL AG

OT

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF SIGNER (Type or print)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

BY

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

1 3

05 29 April 2010

SPM1C1

DEFENSE SUPPLY CENTER PHILADELPHIA

700 ROBBINS AVENUE, BLDG 3-A

PHILADELPHIA, PA 19111-5096

BUYER: JENNIFER TRUESDALE; Work (215) 737-3815

✔ SPM1C1-10-R-0045

19 March 2010 one

See Page 2 for Details.

SPM1C1‐10‐R‐0045 Page 2 of 3 Amendment 05

A. The closing date under SPM1C1‐10‐R‐0045 is extended from 03 May 2010 to 07 May 2010 3:00 pm EST.

B. Reference subject solicitation, Interim changes to Attachment 1A MIL‐S‐3649G:

Page 4 of 10, item number 24, delete: “Page 14, Table I, delete operations 9a and 9c in their entirety and after operation 9c, delete “Classes 2 and 3”.

and substitute the following:

“Page 14, Table I, delete operations 9b and 9c in their entirety and after operation 9c, delete

“Classes 2 and 3”.

Page 5 of 10, after item number 34, add the following:

“35. Page 16, Table I, operation 12, delete operation in its entirety and substitute the following operation:

12. Make permanent crease in fronts.

a. Hard press and crease each front from the top to the bottom with a straight vertical crease in accordance with the marks on the pattern.

b. Apply an even continuous 1/16 inch silicone bead to the center of the pre‐pressed crease in each front on the back side of the basic material.”

Page 5 of 10, after the above change, add the following:

“36. Page 16, Table I, operation 13 title, delete “(Classes 2 and 3)”. (Re‐number all subsequent items, i.e., item number 35 is now re‐numbered as item 37, and ending with item number 55, since item number 48 is deleted below).

Page 7 of 10, item number 48, delete the following: “Page 24, Table I, operation 22f, re‐letter operation “22f” to “22b”.

C. The following packaging information is added to SPM1C1‐10‐R‐0045:

PRES/PACK LEVELS A/B TO MIL-S-3649; POLY

BAG - USE REVERSE/FLAP, TUCK-IN CLOSURE;

MARKING IAW MIL-STD-129 & MIL-HDBK-129;

GOV'T ASSIGNED UPC MUST BE PLACED ON ALL

SHIPPING CARTONS ON WHICH THE NSN APPEARS

SIGNIFICANT NOTE - "PALLETIZATION IS REQUIRED FOR THESE SUPPLIES".

NOTE: THE FOLLOWING APPLIES TO ALL NON-MANUFACTURED WOOD PACKAGING MATERIALS:

"All Wood Packaging Material (WPM) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures (ISPM) 15, "Guidelines for

SPM1C1‐10‐R‐0045 Page 3 of 3 Amendment 05

Regulating Wood Packaging Materials in International Trade." DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo, or when wood is being acquired by DLA for future use as packaging material. WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD). All WPM shall comply with one of the following official quality control programs:

Heat Treatment (HT) or Kiln Dried Heat Treatment (KD HT) in accordance with American Lumber Standard Committee, Incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/; or

All WPM shall include certification/quality markings in accordance with the ALSC or NWPCA standards, as applicable. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible.

All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government."

PALLET SHALL BE 4 WAY ENTRY, WINGED TYPE. PALLETIZED LOAD DIMENSIONS SHALL NOT

EXCEED 43 INCHES IN LENGTH, 52 INCHES IN WIDTH, AND 54 INCHES IN HEIGHT

(INCLUDING THE PALLET).

THE PALLETIZED LOAD SHALL BE BONDED USING APPROVED COMMERCIAL BONDING

MATERIALS. THE USE OF METAL BANDING, IN SECURING BOXES TO PALLETS,

IS DISCOURAGED.

PALLET LOADS SHALL CONTAIN THE SAME NUMBER OF CARTONS, OF

IDENTICAL QUANTITIES, OF ONE NSN, TO THE MAXIMUM EXTENT POSSIBLE.

PALLET LOADS CONTAINING MORE THAN ONE NSN SHALL BE CLEARLY MARKED TO LIST ALL

THE NSN'S CONTAINED IN THE LOAD. NO CARTON SHALL HAVE MORE THAN ONE NSN. AT

THE END OF A SIZE RUN, NO MORE THAN ONE CARTON PER NSN MAY BE SHORT OR OVER THE

SPECIFIED QUANTITY. SAID CARTON SHALL BE CLEARLY MARKED "SHORT" OR "OVER".

MIL-STD-147 IS REFERENCED FOR PALLETIZED LOADS.

IN ADDITION TO REQUIREMENTS SPECIFIED ABOVE THE FOLLOWING CLAUSE ALSO

APPLIES:

52.247-9012 - REQUIREMENTS FOR TREATEMENT OF WOOD PACKAGING MATERIALS

(WPM) - (JULY 2006)