Text version

GAOA Rainbow Pool Day Use Area Improvements / Sweetwater Campground Rehabilitation Stanislaus National Forest February 19, 2021

GAOA RAINBOW POOL DAY USE AREA IMPROVEMENTS FOR

RECREATIONAL USE AND SWEETWATER CAMPGROUND REHABILITIATION

CONSTRUCTION SPECIFICATION INDEX

DIVISION 01 - GENERAL

01 10 00 - SUMMARY OF WORK

01 10 10 - APPLICABLE CODES AND STANDARDS

01 10 20 - ABBREVIATIONS

01 10 30 - DEFINITIONS

01 20 00 - MEASUREMENT AND PAYMENT

01 30 00 – WORK SCHEDULE

01 40 00 - SHOP DRAWINGS AND SUBMITTALS

01 50 00 – QUALITY CONTROL AND QUANTITY MEASUREMENT

01 60 00 - TEMPORARY FACILITIES AND UTILITIES

01 70 00 - MOBILIZATION

01 80 00 - CONTRACT CLOSEOUT AND CLEANUP

DIVISION 10 – SPECIALTIES

10 14 00 - SIGNAGE

DIVISION 31 - EARTHWORK

31 31 19 - WEED AND DISEASE PREVENTION

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 12 17 – PAVEMENT MARKING AND ACCESSORIES

32 33 10 BOULDER BARRIERS

32 33 20 STEEL FEE DEPOSIT BOXES

32 33 30 FLEXIBLE FIBERGLASS DELINEATORS

DIVISION 01 - GENERAL

01 10 00 - Summary of Work

PART 1 - GENERAL

1.1 LOCATION

This project is located within the Groveland Ranger District of the Stanislaus National Forest in Tuolumne County, California. Rainbow Pool Day Use Area and Sweetwater Campground are located along State Highway 120, approximately 14 miles East of Groveland, CA. A map of the sites is in the Drawings.

1.2 SITE WORK

This contract is for the construction of boulder barriers, installation of dual sided fiberglass markers, and restriping at Rainbow Pool Day Use Area and Sweetwater Campground. The work shall also include cleanup and disposal of all removed building material from Forest Service lands.

All work will be completed in accordance with Project Specifications and Drawings. The work includes: all labor, material, and equipment necessary to perform all the operations for the work specified unless noted as Government Furnished.

1.3 OPTIONAL WORK ITEMS

There is a potential for optional work to be performed along with this Contract. These items are optional and listed below.

(A) Install two (2) 2-panel sign kiosks

(B) Install two (2) welded steel fee collection tubes

(C) Restripe emergency vehicle parking with 4” solid red lines

(D) Install emergency parking signage

1.3 CONSTRUCTION PHASING

The sites will be open to the public during construction. The Contractor will take precautions to protect Government, public and private property during construction. Work will be restricted to 7 AM to 5 PM Monday thru Friday.

1.4 GOVERNMENT FURNISHED FACILITIES

(A) All temporary services use areas, and storage areas will be completely removed and the areas restored to pre-construction conditions upon completion of use.

(B) Water for construction purposes is available at Sweetwater Campground.

(C) Transportation to and from the work site for the Contractor's personnel and materials will be provided at the Contractor's expense.

1.5 MATERIAL SOURCES

All materials will be obtained from a commercial source, unless noted otherwise.

1.6 STORAGE AREAS

Materials and equipment storage area will be confined to the areas identified by the Contracting Officer.

1.7 CLEAN-UP AND DISPOSAL

Disposal of waste material will be off National Forest Land and in compliance with local laws regarding disposal of construction waste.

1.8 TRAFFIC

Warning devices and barricades will be maintained in the construction area at all times and will be in conformance with the Manual on Uniform Traffic Control Devices. Safety precautions will be in accordance with the latest edition of the State of California Construction Safety orders. The Contractor will keep the project area open for administrative and emergency traffic at all times.

Road closures shall not exceed more than 10 minutes at a time.

1.9 PRECAUTIONARY MEASURES

Protection of Work: The Contractor will take precautions to protect all work during the construction period and will provide and maintain adequate protection during severe weather conditions to prevent damage to the work and the materials.

Safety: The Contractor is responsible for safeguarding employees, public, existing facilities, and forest resources from these operations. The Contractor will erect signs and chain-link fencing barricades as necessary to make unguarded operations safe. Signs and barricades will be maintained at night and on weekends. Precautions such as lowering tractor blades and safely storing materials will be practiced to prevent injury to others in the area.

Security: No security will be provided by the Government. The Contractor will take all precautions deemed necessary to secure the worksite, improvements and equipment. This may include security fencing.

1.10 MEASUREMENT AND PAYMENT

No separate measurement and payment will be made for the work of this section.

This work will be considered incidental to other Sections.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

***END OF SPECIFICATION 01 10 00***

01 10 10 - Applicable Codes and Standards

1.1 SCOPE

This section describes the codes and standards which apply to the work in this contract.

1.2 CODES AND STANDARDS

The following codes and standards will apply to the work in this contract. Where no date is specified, the applicable edition will be the one in effect on the date of solicitation.

A. International Building Code (IBC) 2006 B. Uniform Plumbing Code 2006 C. NFPA 101 Life Safety Code D. Uniform Mechanical Code 2006 E. Americans with Disabilities Act (A.D.A) / Architectural Barriers Act (A.B.A) F. American Society for Testing Materials G. International Conference of Building Officials H. Underwriters’ Laboratories I. Woodwork Institute of California’s Manual of Millwork J. Architectural Sheet Metal Manual A.I.A File No. 12-L K. Manufacturers’ Instructions L. As required by the applicable listing or testing agency M. As noted in the specifications

1.3 DEFINITIONS

Administrative Authority as used in the Uniform Plumbing Code, Uniform Mechanical Code and the National Electrical Code will be the Contracting Officer.

Building Official as used in the International Building Code will be the Contracting Officer.

1.4 MEASUREMENT AND PAYMENT

PART 2 - PRODUCTS

2.1 GENERAL

All products and materials used in the completion of work will meet the standards and requirements of the codes and standards referenced in Section 1.2 of this Specification, unless otherwise indicated on the Drawings or in the Specifications. When more stringent requirements are called out in these specifications or on the Drawings, the more stringent requirement will take precedence over the codes and standards.

EPA designated the following construction products under the Comprehensive Procurement Guidelines (CPG) program to promote the use of materials recovered from municipal solid waste (MSW). Recycled-content recommendations for each item are listed at the link below.

https://www.epa.gov/smm/comprehensive-procurement-guidelines-construction-products#04

PART 3 - EXECUTION

3.1 GENERAL

All work in the contract will meet the standards and requirements of the codes and standards referenced in Section 1.2 of this Specification, unless otherwise indicated on the Drawings or in the Specifications. When more stringent requirements are called out in these specifications, or on the Drawings, the more stringent requirements will take precedents over the codes and standards. This Section describes the codes and standards which apply to the work in this contract.

***END OF SPECIFICATION 01 10 10***

01 10 20 - Abbreviations

PART 1 – GENERAL

Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning will be interpreted as follows.

Reference to a specific standard of specification will mean the latest edition or amendment in effect on date of invitation to bid.

1.1 ORGANIZATIONS AND STANDARDS

• AASHTO--American Association of State Highway and Transportation Officials

• ACI--American Concrete Institute

• AISC--American Institute of Steel Construction

• AISI--American Iron and Steel Institute

• AITC--American Institute of Timber Construction

• ANSI--American National Standards Institute

• APA--American Plywood Association

• API--American Petroleum Institute

• ASME--American Society of Mechanical Engineers

• ASTM--American Society for Testing and Material

• ATCC--American Type Culture Collection

• AWPA--American Wood Preservers Association

• AWPB--American Wood Preservers Bureau

• AWS--American Welding Society

• AWWA--American Water Works Association

• CFR--Code of Federal Regulations

• CRSI--Concrete Reinforcing Steel Institute

• CS--Commercial Standard issued by U.S. Department of Commerce

• DEMA--Diesel Engine Manufacturers Association

• FAR--Federal Acquisition Regulation

• FED SPEC. or FS-- Federal Specifications

• FSS--Federal Specifications and Standards

• GSA--General Services Administration

• MIL--Military Specifications

• MSHA--Mine Safety and Health Administration

• MUTCD--Manual on Uniform Traffic Control Devices

• NBFU--National Board of Fire Underwriters

• NBS--National Bureau of Standards

• NEMA--National Electrical Manufacturers Association

• NESC--National Electrical Safety Code

• NFPA--(Fire)--National Fire Protection Association

• NFPA--(Forest)--National Forest Products Association

• NWMA--National Woodwork Manufacturers Association

• OSHA--Occupational Safety and Health Administration

• PCA--Portland Cement Association

• PCI--Prestressed Concrete Institute

• PS--Product Standard issued by the U.S. Department of Commerce

• PTI--Post-Tensioning Institute

• RIS-Redwood Inspection Service

• SAE--Society of Automotive Engineers

• SF--Standard Form

• SSPC--Steel Structures Painting Council

• UL--Underwriter's Laboratories, Inc.

• USASI--United States of America Standards Institute

• WCLIB--West Coast Lumber Inspection Bureau

• WWPA--Western Wood Products Association

1.2 PAY ITEMS & PAY UNITS

• Aluminum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . AL.

• Asphalt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASP.

• Barbed Wire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B.W.

• Bituminous Coated Corrugated Steel Pipe . . . . . . . . B.C.C.S.P.

OR

B.C.C.S. PIPE

• Bituminous Surface Treatment . . . . . . . . . . . . . . . . . BST

• Cement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CEMT.

• Cement Treated . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CEMT.-T.

• Cement Treated Base . . . . . . . . . . . . . . . . . . . . . . . . CTB

• Clearing & Grubbing . . . . . . . . . . . . . . . . . . . . . . . . CLEAR & GRUB

• Compaction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CMPCT.

• Concrete . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CONC.

• Corrugated Metal Pipe . . . . . . . . . . . . . . . . . . . . . . . CMP

• Corrugated Steel Pipe . . . . . . . . . . . . . . . . . . . . . . . . C.S.P.

• Corrugated Steel Pipe Arch . . . . . . . . . . . . . . . . . . . . C.S.P. ARCH

• Cubic Yard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C.Y.

• Cubic Yard Mile . . . . . . . . . . . . . . . . . . . . . . . . . . . . C.Y.MI.

• Diameter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DIA.

• Each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA.

• Emulsified . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EMLSFD.

• Erosion and Pollution Control . . . . . . . . . . . . . . . . . E&P CONTROL

• Fabricated . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . FABR.

• Finish Floor Elevation . . . . . . . . . . . . . . . . . . . . . . . . F.F.E.

• Foundation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . FOUND.

• Furnished . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . FURN.

• Gallon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GAL.

• Grade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GR.

• Height . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HT.

• High Strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H. STRENGTH

• Horizontal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HOR.

• Hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HR.

• Linear Foot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . L.F.

• Liquid . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LIQ.

• Loading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LD.

• Lump Sum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . L.S.

• Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MAT'L

• Maximum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MAX.

• Method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M.

• Mile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MI.

• Minimum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MIN.

• One Thousand Feet Board Measure . . . . . . . . . . . . . MFBM

• One Thousand Gallons . . . . . . . . . . . . . . . . . . . . . . . M.GALS.

• One Thousand Gallons Mile . . . . . . . . . . . . . . . . . . . M.GALS.MI.

• One Thousand Square Feet . . . . . . . . . . . . . . . . . . . . M.S.F.

• Polyvinylchloride . . . . . . . . . . . . . . . . . . . . . . . . . . . PVC

• Pounds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LBS.

• Reflectorized . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . REFLECT.

• Section . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SEC.

• Square Foot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S.F.

• Square Yard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S.Y.

• Station . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . STA.

• Station Yard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . STA. YD.

• Strand . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S.

• Structural . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . STRUCT.

• Structural Steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S. STEEL

• Stump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . STMP

• Target Value . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TV

• Thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TH.

• Ton Mile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . T.M.

• Tops and Limbs . . . . . . . . . . . . . . . . . . . . . . . . . . . . T&L

• Utilization of Timber . . . . . . . . . . . . . . . . . . . . . . . . UOT

• Vertical . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VERT.

• Welded Wire Fabric . . . . . . . . . . . . . . . . . . . . . . . . . W.W.F.

• White . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . WH.

• Width . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . W.

• With . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . W/

• Without . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . W/O

• Woven wire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . W.W.

• Yellow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . YE.

***END OF SPECIFICATION 01 10 20***

01 10 30 - Definitions

1.1 DEFINITIONS

Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning will be interpreted as follows:

Adjustment in Contract Price. "Adjustment in contract price" will mean "equitable adjustment" as used in the Federal Acquisition Regulations.

Arch Pipe. A culvert section, usually formed of bolted structural plates, that is an arc of a circle (usually one-half or less); that is, a bottomless culvert.

Base Course. The layer or layers of specified or selected material of designed thickness placed on a subbase or subgrade to support a surface course.

Bearings. The portion of a beam, girder, or truss that transmits the bridge superstructure load to the substructure.

Berm. Curb or dike constructed to control runoff water or traffic flow.

Change. "Change" means "Change Order" as used in the Federal Acquisition Regulations.

Clearing Limits. The limits of clearing as designated on the ground or on the Drawings.

Conduit. A natural or artificial channel for carrying fluids, as water pipes, canals, and aqueducts.

Construction Slash. All vegetative material not meeting utilization standards, such as tops and limbs, timber, brush, and grubbed stumps associated with construction or reconstruction of a facility.

Contracting Officer (CO). The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.

Contracting Officer's Representative (COR) The Government-authorized representative designated in writing by the CO responsible for onsite administration of the contract.

Contractor. The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through their agent, employees, or sub-Contractors.

Controlled Felling. Directing the placement of trees in felling by wedges, jacks, cable tension, or distribution of holding wood or any combinations of these which will ensure that trees are dropped into previously cleared areas, or clear of any objects that are to remain.

Culvert. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually constructed entirely below the elevation of the traveled way.

Cushion Material. Native or imported material generally placed over rocky sections of unsurfaced roads to provide a usable and maintainable traveled way.

Defect. A failure to meet a requirement with respect to a single quality characteristic.

Drawings. The documents, including plan and profile sheets, cross sections, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials showing details for construction of a facility.

Embankment. A structure of soil, aggregate, or rock material placed on the prepared ground surface and constructed to subgrade.

Equipment. All machinery and equipment, together with the necessary supplies for upkeep and maintenance, as well as tools and apparatus necessary for the proper construction and acceptable completion of the work.

Excess Excavation. Material from the excavation in excess of that needed for construction of designed roadways and facilities.

Forest Service. The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Gauge. The term "gauge" when used in connection with the measurement of plates will mean the U.S. Standard Gauge, except when reference is made to the measurement of metal sheets used in the manufacture of corrugated metal, pipe, metal plate culverts and arches, and metal cribbing, then the term means the "gauge" or "thickness" specified in AASHTO M 36, M 167, M 196, and M 219, as applicable. When the term "gauge" refers to the measurement of wire, it will mean the wire gauge specified in AASHTO M 32.

Government Land. National Forest System lands, and other lands controlled or administered by the Forest Service or by other Federal agencies.

Inspector. The Government-authorized representative designated in writing by the CO or COR responsible for detailed inspection.

Job-Mix Formula. The percentage of each material in a mixture intended for a particular use.

Laboratory. A testing laboratory of the Government or any other testing laboratory approved by the Contracting Officer.

Materials. Any substance specified for use in the construction of the project and its appurtenances.

Maximum Density. The highest density that can be obtained under stated conditions.

Measurement. Determining and expressing the quantities of work or materials.

Multi-Beam Girder. A precast, prestressed concrete member where the concrete deck is precast as an integral part of the member.

Neat Line. A line defining the proposed or specified limits of an excavation or structure.

Nominal Dimensions or Weights. The numerical values shown on the Drawings or in the specifications as measurements of material to be used in the construction.

Nominal Maximum Particle Size. The largest sieve size listed in the applicable specification upon which any material is permitted to be retained.

Overbreak. Material beyond the neat line of an excavation that is removed in the process of excavation, usually by blasting.

Pavement Structure. Subbase, base, or surface course, or combination thereof, placed on a subgrade to support the traffic load and distribute it to the roadbed.

Pipe. A culvert that is circular (round) in cross-section.

Pipe-Arch. A pipe that has been factory-deformed from a circular shape such that the width (or span) is larger than the vertical dimension (or rise).

Profile Grade. The trace of a vertical plane, as shown on the Drawings, intersecting the top surface at the centerline of the proposed facility construction.

Random Sampling. Sampling at times or locations determined in advance by the use of a table of random numbers.

Reasonably Close Conformity. Unless working tolerances are specified, all work performed and materials furnished will be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.

Roadway. The portion of the road within the limits of excavation and embankment, including slope rounding.

Schedule of Items. A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.

Second Samples. A sample taken when the initial sample indicates that the material is defective.

Sidewalk. The portion of the roadway constructed primarily for pedestrian use.

Specifications. A description of the technical requirements for a material, product, or service that includes criteria for determination whether these requirements are met.

Standard Specifications. Specifications approved for general application and repetitive use.

Subbase. The layers of specified or selected material of designed thickness placed on a subgrade to support a base course.

Subgrade. The layers of roadbed that bring it up to the top surface, upon which subbase, base, or surface course is constructed. For roads without base course or surface course, that portion of roadbed prepared as the finished wearing surface.

Tackifier. Binder for vegetative mulch.

Target Value. The percentage of each material in a mixture intended for a particular use from which allowable variations are measured.

Unit of Measurement. The unit and fractions of units shown in the Schedule of Items.

Unsuitable Material. The material excavated during roadway construction that is not usable in embankment and must be disposed of or that can be used only in certain locations or for limited purposes.

***END OF SPECIFICATION 01 10 30***

01 20 00 - Measurement and Payment

1.1 REQUIREMENTS

Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered incidental to and included in the payment of the pay items in the Schedule of Items.

1.2 PAYMENT

One (1) of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item.

(A) Designed Quantities (DQ)

These quantities denote the final number of units to be paid for under the terms of the contract.

They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, Drawings, and the presentation in the contract. Changes in the number of units of the originally contemplated work will not be made unless authorized under one (1) or more of the following conditions:

(1) As a result of changes authorized by the Contracting Officer in the originally contemplated work. Minor changes to adjust balance points, etc., will not be considered changes in quantities.

(2) As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities that cause a pay item to change by fifteen (15) percent.

(3) As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by fifteen (15) percent or more. The evidence must be verifiable and consist of calculations, Drawings, or other data that show how the designed quantity is believed to be in error.

Final payment will be made for the designed quantities at the unit price shown in the Schedule of Items, subject to the Variation in Quantities Provision.

(B) Actual Quantities (AQ)

These quantities are determined from measurements of completed work.

(C) Lump Sum Quantities (LSQ) These quantities denote one (1) complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.

1.3 UNITS OF MEASUREMENT

Payment will be by units defined and determined according to U.S. Standard measure.

***END OF SPECIFICATION 01 20 00***

01 30 00 – Work Schedule

This section includes the requirements for the submittal of the Contractor’s proposed work schedule for the project.

1.2 MEASUREMENT AND PAYMENT

No separate measurement and payments will be made for this section. This work will be considered incidental to other Sections.

PART 3 – EXECUTION

3.1 WORK SCHEDULE

(A) At the pre-work meeting, the Contractor will submit to the Contracting Officer for approval, a proposed work schedule for the project. The Contracting Officer shall be notified at least 24 hours prior to any activity which requires his inspection, acceptance, or approval. The Contractor will update approved schedule as necessary when significant changes occur during the progress of the work, or when requested by the Contracting Officer.

(B) The Contractor will be restricted from operations on holiday weekends.

3.2 SUBMITTALS

Three (3) copies of the written work schedule will be submitted for approval.

***END OF SPECIFICATION 01 30 00***

01 40 00 - Shop Drawings and Submittals

Preform all work necessary and required for the construction of the project as indicated. Such Work includes but is not limited to the following:

(A) Shop Drawings

(B) Samples

(C) Catalog Data

(D) Operation and Maintenance Manuals

(E) Certificates and Warranties

1.2 SUBMITTALS

Submittals will include all pertinent data required to understand the quality of components, dimensional relationships, integration with other materials, assembly techniques, structural aspects, color, finish, texture, and other such characteristics as may be necessary to fully describe the item and its intended use.

1.3 MEASUREMENT AND PAYMENT

No separate measurement and payments will be made for this section. This work will be

3.1 SUBMITTALS

It is the Contractor’s responsibility to submit all items with such promptness as to cause no delay in work. Approval must be obtained before starting work which involves the item. The Contractor will allow fourteen (14) days for review by the Contracting Officer.

3.2 MANUFACTURER’S LITERATURE AND SHOP DRAWINGS

Submit three (3) copies to the Contracting Officer for approval on the items required herein.

Submittal specifications are to be submitted in the following format:

(A) The specifications and salient qualities of the item specified in the contract.

(B) The specifications and salient qualities of the submittal item.

(C) A listing of the differences and a comparison between the two (2), including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.

(D) A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the Government or adequate justification for a cost increase to the Government.

(E) Shop Drawings of submitted item(s) including wiring or layout diagrams.

If there are any modifications necessary to facilitate installation, a set of drawings showing installation of specified item and a set showing how the submittal item will be installed.

If the specified item is to be ADA accessible the submittal item needs to show ADA access on submitted Drawings, not just state it is available as ADA accessible.

Submittals are required, but not limited to, the following sections:

01 30 00 – Work Schedule Project Schedule

10 14 00 – Signage Signage Schedule and Drawings Manufacturer’s Data

31 31 19 - Weed and Disease Prevention Visual Equipment Inspection Reports

32 33 20 – Boulder Barriers Material Certificates Weight or Load Slip

32 33 20 – Steel Fee Deposit Boxes Manufacturer’s Technical Data

32 33 30 – Flexible Fiberglass Delineators Manufacturer’s Technical Data

***END OF SPECIFICATION 01 40 00***

01 50 00 – Quality Control and Quantity Measurement

1.1 DESCRIPTION

This work will consist of providing quality control in conformance with the inspection of construction provisions of this contract to ensure compliance with the Drawings, Specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specification. The Contractor will provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification. The On- The-Job Superintendent will not be the Quality Control Manager without written permission from the Contracting Officer.

1.2 RELATED WORK SPECIFIED ELSEWHERE

General Provisions FAR 52.236-5, Material and Workmanship General Provisions FAR 52.236-6, Superintendence by the Contractor General Provisions FAR 52.246-12, Inspection of Construction

1.3 MEASUREMENT AND PAYMENT

3.1 SAMPLING, TESTING, INSPECTION, AND MEASUREMENT OF QUANTITIES

The Contractor will provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing, and inspection in a timely manner. Tests, measurements, and certifications will be made as required by the Drawings and specifications. The Contractor will take samples and perform inspections and tests necessary to achieve the quality of construction required by the contract and make required measurements of work under this contract performed onsite or offsite. Sampling and testing frequency for specific items will be specified in the related section.

The Contractor will maintain current records of all inspections and tests performed. The following information will be acceptable to the Government:

PROJECT NAME:_________________CONTRACT No._____________________

Pay Item No. Test Date Location Standard Results Test By (Initials)

The Contractor will protect construction exposed by or for quality control service activities and protect repaired construction. Upon completion of inspection and testing repair damaged construction and restore substrates and finishes to eliminate deficiencies. The Contractor is responsible for repair and protection of inspected work, whether inspection is performed by the Contractor or by the Government.

The Contractor will certify in writing that all inspections and tests were performed in accordance with specifications.

3.2 AS-BUILT DRAWINGS

The Contractor will maintain a set of the contract Drawings depicting as-built conditions.

These Drawings will be maintained in a current condition and will be available for review. All variations from contract Drawings will be indicated in red on the Drawings. Upon completion of the contract work, As-Built-Drawings will be submitted to the Contracting Officer.

3.3 CERTIFICATES AND MEASUREMENTS

Certification:

The Contractor will furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements Shown on the Drawings or stated in the Specifications. Incidental purchases needed to remedy minor shortages of material will be certified by the Contractor. Earth, aggregate and concrete material will be certified and accurately completed indicating weights, volumes, and batch times where appropriate.

Measurements:

The Contractor will make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (DQ). The Contractor will compute the quantities for periodic progress payments; the Contracting Officer will compute the quantities for the final payment based on measurements taken by the Contractor. All Contractor measurements are subject to verification. The Contractor will submit all field notes, calculation sheets, and other data used to determine quantities. The Contractor will certify in writing as to the accuracy of the measurements and computations submitted.

The following format or one (1) containing the following information will be acceptable to the Government:

PROJECT NAME:_______________________CONTRACT No.__________________

Quantity or Pay Item Date Measurement Test By (Initials)

***END OF SPECIFICATION 01 50 00***

01 60 00 - Temporary Facilities and Utilities

The work of this section includes providing all temporary facilities and controls needed for the project. The Contractor will furnish all equipment, labor, materials, and incidentals necessary to hook-up, install and maintain the facilities. Such facilities include but are not limited to:

1. Sanitary facilities

2. Water

3. Directional signs, safety signs, and barricades

4. Temporary utilities such as water

1.2 SAFETY ASSURANCE

OSHA Complaisance: Comply with Occupational Health and Safety Requirements for Construction (29 CFR 1926).

Hazardous Materials Compliance: For hazardous materials regulated by OSHA see 29 CFR Part 1910, Subpart Z.

1.3 MEASUREMENT AND PAYMENT

No separate payment will be made for the work specified in this section. This work will be

3.1 SANITARY FACILITIES

Contractor may use existing Government sanitary facilities after they are opened for public use. In the event that the existing Government facilities are not yet open to the public, the Contractor will provide temporary sanitary facilities for all workers and maintain the facilities in a clean and sanitary state. Temporary sanitary facilities will be provided at a rate of one seat per ten workers on site. Contractor furnished facilities will be available for Government personnel use.

3.2 WATER

Contractor may use existing Government water facilities after they are opened for public use, to the extent of available capacity. In the event that the existing Government facilities are not yet open to the public, the Contractor will provide temporary watering equipment. Watering equipment, including piping, shall be watertight. Tanks shall be of known capacity. Watering equipment used for dust control and finishing operations of subgrade and surface will provide uniform and controlled application of water from the driver’s position at all times.

3.3 OPERATIONS AND STORAGE AREAS

Operation and storage areas will be restricted to the project site, as directed by the Contracting Officer and show on the Drawings.

3.4 COSTS

All fees and costs for the hook-up, installation, use, maintenance and removal of temporary facilities and controls will be paid by the Contractor.

***END OF SPECIFICATION 01 60 00***

01 70 00 - Mobilization

This work will consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.

1.2 MEASUREMENT

Progress payments will be made as follows:

The Contractor can request payment for performance and payment bonds. The amount of the premium, including coinsurance and reinsurance agreements, will be paid upon receipt of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.

(A) When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.

(B) When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.

(C) Upon completion of all work on the project, any unpaid amount for mobilization will be paid.

Any bonding costs in excess of the total contract amount of this pay item will be paid under one

(1) or more other pay items under this contract as determined by the Contracting Officer. In no circumstance will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item. The total of all payments will not exceed the original contract amount for this item.

1.3 PAYMENT

Payment will be made under:

PAY ITEM DESCRIPTION PAY UNIT

01 70 00 Mobilization L.S.

***END OF SPECIFICATION 01 70 00***

01 80 00 - Contract Closeout and Cleanup

This section includes the requirements covering the disposal of excess materials resulting from construction operations and the cleanup work required in areas affected by the construction.

1.2 MEASUREMENT AND PAYMENT

No separate payment will be made for work specified in this section. This work will be

3.1 EXCESS MATERIALS AND REFUSE

All refuse and unused materials generated by the Contractor’s operations. This will include all vegetative materials and the like will be dispersed evenly throughout the area. Any material deemed unsuitable for dispersement by the Contracting Officer will be disposed of off of National Forest lands in accordance with Federal, State, and local regulations, or as directed by the Contracting Officer.

3.2 CLEANUP DURING CONSTRUCTION

Cleanup shall be on a daily basis at the job site. Contractor shall be responsible for hauling off and disposing of debris generated by contract work.

Cleanup will be performed by the Contractor as required to prevent accidents to personnel and protect all work in-place. Construction cleanup will consist of the removal of all dirt, trash, scrap, debris, and excess materials from any floor space or walking surface that may cause the tripping or sliding of workers, ladders or equipment.

3.3 FINAL CLEANUP

Immediately prior to the Contractor’s request for final inspection of the project, final cleanup will be performed. During the final inspection the Contractor and Contracting Officer will review the as-built drawings on site.

3.4 QUALITY OF CLEANUP

Site: Remove all trash and debris. Items that will be discarded shall be disposed of off of National Forest lands in accordance with Federal, State, and local regulations, or as directed by the Contracting Officer.

***END OF SPECIFICATION 01 80 00***

DIVISION 10 – SPECIALTIES

10 14 00 - Signage

1.1 SUMMARY

(A) Section includes exterior signage including:

(1) Emergency parking signage.

(2) Forest Service recreation site signage.

(A) Work Included:

(1) All labor, materials, tools, equipment, transportation and temporary construction of any nature necessary for a complete operational installation of all sign work shown on the Drawings and specified herein.

1.2 SUBMITTALS

(A) Submit signage schedule and drawings showing size, type, layout, text, font and graphic of all signage

(B) Submit manufacturer’s technical data and installation instructions for each type of sign required.

1.3 MEASUREMENT AND PAYMENT

Measurement is Designed Quantity. Payment of the amount bid under Optional Pay Items 10 14 00.01 and 10 14 00.02 in the Schedule of Items will be made for satisfactory completion of all work required in this specification. Such amount will constitute full compensation for all work and incidentals.

Payment will be made under:

PAY ITEM DESCRIPTION METHOD OF MEASUREMENT PAY UNIT

10 14 00.01 Forest Service Recreation Site Signage Designed Quantity E.A.

10 14 00.02 Emergency Parking Signage Designed Quantity L.S.

PART 2 – PRODUCTS

2.1 MANUFACTURERS

Provide Forest Service recreation site signage products from:

ROCKART, Inc.

3006 N. Maple, Mesa, AZ 85215

(480) 854-3400 www.rockartsigns.com http://www.rockartsigns.com/

Or approved equal.

2.2 SIGNAGE – GENERAL

(A) Emergency parking signage: See drawings for additional information.

(1) Signage shall meet the requirements of the Manual on Uniform Traffic Control Devices.

(2) All letters, numbers and/or symbols shall contrast with their background.

(3) Signs shall be 12” x 18” Aluminum unless otherwise noted, retroreflective, and shall display text as called out in the Drawings.

(B) Forest Service recreation site sign kiosk:

(1) Kiosk shall be square tube steel construction with 6” x 6” posts, 78” tall, and slotted steel sign mounts, with brown powder coat finish.

(2) Kiosk shall fit two 48” by 48” sign panels.

(C) Forest Service recreation site sign panels:

(1) Panels shall be 48” x 48”, single sided, with routed polyethylene header and footer, polycarbonate cover, and side rails.

2.3 SIGN SCHEDULE

(A) Provide all signage as listed below.

(1) Emergency parking area traffic signage: Provide 3 signs at Rainbow Pool Day Use Area as specified in Drawings.

(2) Forest Service recreation site sign kiosk: Provide and install 2-panel sign kiosk and 2 single sided sign panels at Sweetwater Campground. Install Government furnished 2-panel sign kiosk and 2 single sided sign panels at Rainbow Pool Day Use Area.

3.1 INSTALLATION - GENERAL

(A) Install miscellaneous specialties in accordance with manufacturer's instructions, in locations shown on the Drawings.

(1) Install traffic signage on proper steel U-channel sign posts. Furnish flanged, channel, galvanized steel posts conforming to ASTM A499, Grade 60 (420).

(a) Punching. Starting 1 inch (25 millimeters) from the top and extending the full length of the post, drill or punch ⅜-inch (10-millimeter) holes on 1-inch (25 millimeter) centers along the centerline of the bottom of the U. Remove burrs and sharp edges.

(b) Galvanizing after punching

(2) Install sign kiosk in concrete footing per manufacturer instructions.

(B) Install units level and plumb securely fastened to structure.

(C) Visible edges shall be straight and free from saw marks and other imperfections. Text shall be precisely aligned and correctly spaced.

3.2 CLEANING AND PROTECTION

After installation, clean soiled signs surface according to manufacturer's instructions.

Protect from damage until acceptance.

*** END OF SPECIFICATION 10 14 00***

DIVISION 31 - EARTHWORK

31 31 19 - Weed and Disease Prevention

(A) This work consist of washing and treating construction equipment to remove dirt, mud, seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest lands.

(B) Notify the Contracting Officer in writing at least five (5) days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest lands.

1.2 MEASUREMENT AND PAYMENT

No separate payment will be made for work specified in this section. This work will be considered incidental to Section 01 70 00.

2.1 HIGH PRESSURE WASHING SYSTEM

The Contractor will use a washing system that utilizes high-pressure water to dislodge dirt, debris, and seeds from the equipment.

3.1 WASHING

(A) Washing will be performed outside of the National Forest at a location pre-approved by the Contracting Officer seventy-two (72) hours in advanced that they will be washing the equipment, and provide the opportunity to monitor the washing and inspection. If the Contracting Officer is not present at the time the equipment is being washing, the Contractor will submit written verification that the work was performed and inspected.

(B) Wash the sides, tops and undercarriages of all construction equipment. Remove all soil, mud, (wet or dried), seeds, plants, plant fragments, dirt and debris that could contain seeds from the construction equipment. Light dust that does not contain sees is not of concern.

(C) Do not mix, soaps, detergents, or other chemicals, with the wash water.

3.2 INSPECTION

Contractor will inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed by the Contracting Officer.

3.1 ACCEPTANCE

Acceptance is based on visual inspection of the work for compliance with the contract and prevailing industry standards.

***END OF SPECIFICATION 31 31 19***

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 12 17 – Pavement Marking and Accessories

(1) All labor, materials, tools, equipment, transportation and temporary construction of any nature necessary for a complete operational installation of all pavement markings and accessories work shown on the Drawings and specified herein.

1.2 REFERENCES

(A) American Society for Testing and Materials (ASTM).

(B) Standard Specifications for Construction of Roads and Bridges on Federal Projects, FP-03.

1.3 PROJECT CONDITIONS

(A) Specifications, standards, tests and recommended methods cited in the above referenced specifications shall determine quantity and quality of materials and methods unless specifically designated otherwise.

(B) Reference to makers, brands, models, etc. is to establish type and quality desired;

substitution of equals will be permitted upon approval by the CO.

1.4 MEASUREMENT AND PAYMENT

Measurement is Designed Quantity. Payment of the amount bid under Pay Item 32 12

17.01 and Optional Pay Item 32 12 17.02 in the Schedule of Items will be made for satisfactory completion of all work required in this specification. Such amount will constitute full compensation for all work and incidentals.

32 12 17.01 Road Restriping Designed Quantity L.F.

32 12 17.02 Emergency Parking Restriping Designed Quantity L.S.

2.1 TRAFFIC PAINT

(A) Traffic paint shall conform to or exceed the standards set forth by the State of

California Materials and Research Department. Common brands are: Kelly Moore No. 2130, Crown Products, DeSoto and Bauer.

(B) All paint shall be thoroughly mixed prior to placing in painting equipment.

3.1 PAINTING

(A) Types of Traffic Paint:

(1) White:

(a) Solid 4-inch line: edge lines, parking stalls.

(2) Black:

(a) Painting over existing lines to be re-striped

(3) Red:

(a) Red curb: no parking lanes for fire access.

(B) Rates of Application:

(1) All new surfaces shall have the traffic paint applied in two applications.

(2) All surfaces to be painted shall be clean and dry prior to painting. There shall be a minimum drying time between paint applications of approximately 20 minutes.

(3) Rates of Application:

(a) Solid Stripe (4 inches wide):

1. New surface (first coat) 12 to 14 gallons per mile, 1 gallon per 125 to 150 square feet of line.

2. Second coat or restriping 16 to 18 gallons per mile, 1 gallon per 100 to 110 square feet of line.

(4) The Contractor shall provide sufficient evidence to the CO that the quantity of paint specified has been applied to the job. Such evidence can be invoice tickets made out to the specific job, counting empty paint cans, or a method acceptable to the CO.

(5) Striping shall not be applied at temperatures below 40 degrees F or if pavement surfaces are wet.

(6) The alignment of all striping shall be accurately laid out. Lines which do not conform to the alignment as set forth in the Drawings, or which have a wavy appearance, shall be removed and replaced by the Contractor at his expense.

3.2 REMOVAL OF STRIPES

All stripes and pavement markings not in conformance with the proposed striping plan shall be removed by sandblasting or by painting out in black paint.

*** END OF SPECIFICATION 32 12 17***

32 33 10 - Boulder Barriers

(1) All labor, tools, equipment, transportation and temporary construction of any nature necessary for a complete operational installation of all boulder barrier work shown on the Drawings and specified herein.

(2) All materials necessary for completion of work unless otherwise specified to be furnished by the Government.

1.2 REFERENCES AND REGULATORY REQUIREMENTS

(A) American Society for Testing and Materials (ASTM).

(B) Standard Specifications for Construction of Roads and Bridges on Federal Projects, FP-14.

1.3 SUBMITTALS

(A) The CO shall be provided with two (2) copies of material certificates signed by the material producer and the Contractor, certifying that each material item complies with, or exceeds specified requirements.

(B) The Contractor shall furnish the Owner a certified weight or load slip for each load of material used in the construction of boulder barriers.

1.4 MEASUREMENT AND PAYMENT

Measurement is Designed Quantity. Payment of the amount bid under Pay Items 32 33

10.01 and 32 33 10.02 in the Schedule of Items will be made for satisfactory completion of all work required in this specification. Such amount will constitute full compensation for all work and incidentals.

32 33 10.01 New Boulder Barriers Designed Quantity E.A.

32 33 10.02 Relocate Boulder Barriers Designed Quantity E.A.

2.1 BOULDERS

Furnish hard, angular, and durable rock that consists of a solid mass without open fractures, foliation, or other planes of weakness that are generally cubical, tabular, or rectangular in shape. Conform to the following:

(A) Asbestos content:…

This is the start of the file's text. The full file is on GovTribe.