AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

1 5-11-2022

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA Forest Service Construction Contracting Group 3237 Peacekeeper Way, Suite 101 McClellan, CA 95652

SAME

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

127EAW22Q0013

9B. DATED (SEE ITEM 11)

04-22-2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

RAINBOW POOL DAY USE AREA IMPROVEMENTS / SWEETWATER CAMPGROUND REHABILITATION

STANISLAUS NATIONAL FOREST

The purpose of amendment is to extend the due date & time and to provide responses to Requests to Information, as well as to update the schedule of items and plans. The updated plans document is attached separately.

The due date and time is hereby extended to May 20, 2022, at 5:00 PM Pacific.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

WENDY WHITEMAN, CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. 1 GAOA Rainbow Pool Day Use Area Improvements / Sweetwater Campground Rehabilitation Stanislaus National Forest Page 2

RESPONSES TO REQUESTS FOR INFORMATION

RFI #1 – Relocate Boulder Barriers; After a site visit to the area, there does not appear to be “free” existing boulders to be relocated. There are some being utilized in the areas identified, but it seems counter-productive to relocate these as they are existing barriers. According to the bid items, there should be 30 available. Please clarify if these are in another location, or we should plan to import additional boulders. Please revise bid items if necessary.

A: No change to quantities of additional imported boulders. “Relocate” and “New” boulder barrier quantities were calculated considering the placement of boulder barriers in all required locations. Boulder harvesting and placement locations were determined based on areas where illegal parking may provide such a constriction that emergency vehicles could not access the area. To clarify plan notes:

Note 2: These boulders (4) should be reset along with 8 additional boulders to make a row of 12 boulders that meets the specifications of Detail 1 between Sta 1+13 and Sta 2+00

Note 8: These boulders (4) should be harvested for use in any of the other new boulder barriers specified. If these boulders, after harvesting, do not meet specification requirements, an additional area on site has been identified for boulder harvest.

Note 9: These boulders (15), located on the shoulder of the existing No Parking and future Emergency Parking area, should be harvested for use in any of the other new boulder barriers specified.

Note 10: These boulders (5), located on the wider shoulder after the No Parking area, shall be relocated in the same general area to make a row of boulders that meets the specifications of Detail 1 between Sta 9+29 and Sta 9+92. The intent of this row of boulders is to prevent parking as the road constricts and the emergency parking area ends.

Note 16: These boulders (2) should be harvested and relocated to the area described in Note 17.

RFI #2 – Staging Area: Please identify a temporary staging area and stockpile location for equipment and materials. It appears that another contractor is working in the area as well.

A: FS will coordinate a staging and stockpile area. If an area can not be made available at Rainbow Pool Day Use Area, an area will be identified and available within 1 mile.

RFI #3 – Option Items, signs/posts; It appears that new signs and a fee tube have been installed already.

Please clarify number of new installations, if any, and revise bid items.

A: Option item quantities shall be adjusted accordingly:

10 14 00.01 Forest Service Recreation Site Signage 1 (Sweetwater CG only) 32 33 20 Fee Deposit Boxes 0

RFI #4 – Option Items, emergency striping; Please clarify what is to happen with the existing white striping in the no parking/emergency area. Can this be painted over in Red, or does it need to be blacked

Stanislaus National Forest Page 3 out, or removed prior to the installation of new paint?

A: It is acceptable for the existing striping to be painted over in red. Anywhere the new striping does not cover existing, the existing striping shall be removed by sandblasting or by painting out in black paint per Specification 32 12 17.

Stanislaus National Forest Page 4

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

PROJECT GAOA Rainbow Pool Day Use Area Improvements / Sweetwater Campground Rehabilitation

UNIT Stanislaus National Forest

SOL # 127EAW22Q0013

ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE

0001 01 70 00 Mobilization LS 1 $ $ 0002 32 33 10.01 New Boulder Barrier EA 39 $ $ 0003 32 33 10.02 Relocate Boulder Barrier EA 30 $ $ 0004 32 33 30 Flexible Fiberglass Delineators EA 133 $ $ 0005 32 12 17.01 Road Restriping LF 1000 $ $

SUBTOTAL $

OPTIONAL WORK A

A0001 10 14 00.01 Forest Service Recreation Site Signage EA 1 $ $ A0002 32 12 17.02 Emergency Parking Restriping LS 1 $ $ A0003 10 14 00.02 Emergency Parking Signage LS 1 $ $

TOTAL $

NOTES: 1. Responses for quantities less than those listed in the numbered items may be rejected.

2. Responses without prices for each item and sub-item may be rejected.

3. If award response is made in excess of $35,000, bonds will be required (Section I)

4. If response is greater than $150,000, include bid bond = 20% of the total price

5. Following are abbreviation definitions from FP-14, Section 109 that may appear in the "Unit" column of the Schedule of Items; AC = Acre, CQ = Contract Quantity, CY = Cubic Yard, EA = Each, GAL = Gallon, HR = Hour, LF = Linear Foot, LS = Lump Sum, MI = Mile, LB = Pound, SF = Square Foot, SY = Square Yard, ST = Station, TON = Ton, CQ and LS will be measured and paid as stated in FP-14, Section

109.02. All other units will be paid according to FAR clause 52.211-18, Variation in Estimated Quantity.

6. Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract.