Amendment No 1 Updated Plans - Rainbow Sweetwater.pdf
PDF 3 MB Posted
- Solicitation number
- 127EAW22Q0013
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EDITED
5/11/2022 by K. Baker a:
C
:1 w "'
...J ..z u :!i!
a:
�z w :. w
0.
!el
::3 w "'
...J C C0.
i
I w "'
...J ..z 0 u :!i!
a:
�z w
0.
!el w "'
...J 0 00.
i
...z 0 u
BID SCHEDULE
PAY ITEM NUMBER PAY ITEM DESCRIPTION UNIT
SHEET
QUANTITY REMARKS
NUMBER/DESCRIPTION
01 70 00 MOBILIZATION LS 1
32 33 10.01 NEW BOULDER BARRIERS EA C-01, D-01 39
32 33 10.02 RELOCATE BOULDER BARRIERS EA C-01, D-01 30
32 33 30 FLEXIBLE FIBERGLASS EA C-01, D-01 133
DELINEATORS
32 12 17.01 ROAD RESTRIPING LF D-02 1000
OPTION ITEMS
10 14 00.01 FOREST SERVICE RECREATION EA 0-01, 0-02 2 RAINBOW POOL - SIGN KIOSK
SITE SIGNAGE AND SIGNAGE TO BE PROVIDED
BY GOVERNMENT
32 33 20 FEE DEPOSIT BOXES EA 0-01, 0-02 2
32 12 17.02 EMERGENCY PARKING LS 0-01 1
RESTRIPING
10 14 00.02 EMERGENCY PARKING SIGNAGE LS 0-01 1
GENERAL NOTES: WORK NOTES:
1. SITE ACCESS TO THE PUBLIC MUST BE MAINTAINED DURING ALL CONTRACT WORK. ANY 1. ALL FOREST SERVICE ROADS OR INFRASTRUCTURE DAMAGED BY CONTRACTOR
ROAD CLOSURE SHALL NOT EXCEED 10 MINUTES AT A TIME. DURING CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR
2. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH THE 2. BORROW SOURCES, IF NEEDED, WILL BE DESIGNATED BY THE FOREST SERVICE
CONTRACT TO THE CO FOR APPROVAL PRIOR TO THE START OF WORK DURING CONSTRUCTION
3. REQUIRED WORK NOT SPECIFIED IN THE SCHEDULE OF ITEMS SHALL BE CONSIDERED 3. WASTE AREAS WILL BE DESIGNATED BY THE FOREST SERVICE DURING
SUBSIDIARY TO OTHER PAY ITEMS CONSTRUCTION
4. BEFORE ANY EXCAVATION ACTIVITIES BEGIN, THE CONTRACTOR SHALL CONTACT A 4. WATER SOURCES, IF NEEDED, SHALL BE DESIGNATED BY THE FOREST SERVICE
SERVICE TO LOCATE ANY BURIED UTILITIES. USA= 1-800-642-2444, THE NATIONAL 811 DURING CONSTRUCTION
NUMBER, OR THE WEBSITE HTTP://WWW.USANORTH811.ORG/ 5. UTILITIES: THERE ARE BURIED UTILITIES WITHIN THE PROJECT AREA. CONTACT 811
5. EQUIPMENT FOR THIS PROJECT, IF DRIVEN ON STATE OR COUNTY ROADS, SHALL BE PRIOR TO DIGGING. DO NOT BEGIN GROUND DISTURBING WORK UNTIL A MEETING IS
CURRENTLY LICENSED HELD WITH THE FOREST SERVICE TO CONVEY THE LOCATION OF FOREST SERVICE
6. ALL WORK SHALL BE IN COMPLIANCE WITH THE BEST MANAGEMENT PRACTICES UTILITIES THAT NEED TO BE PROTECTED.
DESCRIBED IN THE REGION 5 FOREST SERVICE SOIL AND WATER CONSERVATION 6. PROVIDE COPIES OF WEIGHT TICKETS FOR MATERIAL DELIVERED TO THE SITE
HANDBOOK, DATED DECEMBER 2011, AND THE NATIONAL BEST MANAGEMENT PRACTICES FROM COMMERCIAL SOURCES. AGGREGATE SHALL BE OBTAINED FROM AN
FOR WATER QUALITY MANAGEMENT ON NATIONAL FOREST SYSTEM LANDS, DATED APRIL APPROVED SOURCE, CERTIFIED WEED FREE AND CERTIFIED TO CONTAIN NO MORE
2012 THAN 0.25% ASBESTOS TO BE IN COMPLIANCE WITH CALIFORNIA HEAL TH AND
7. ALL DIMENSIONS, UNLESS OTHERWISE SPECIFIED, ARE IN U.S. FEET SAFETY CODE SECTIONS 93105 AND 93106
8. CONTRACTOR IS RESPONSIBLE FOR ALL PROJECT AND SAFETY COMPLIANCE 7. ANY DISTURBANCE (SUCH AS BORROW SITES AND STAGING AREAS) SHALL BE
RESTORED
USDA .�""'}"'�► - 'U S1
���NTOFAGR�
United states Department of Agriculture
Forest Service
(ROS}
PACIFIC SOUTHWEST REGION
PROJECT NAME
GAOA RAINBOW POOL DAY USE
AREA IMPROVEMENTS FOR
RECREATIONAL USE AND
SWEETWATER CAMPGROUND
REHAB. {D54)
STANISLAUS
NATIONAL FOREST
GROVELAND DISTRICT
DRAWING TITLE
GENERAL NOTES &
SCHEDULE OF ITEMS
DATE
12/31/2020
ARCHIVE NO.
FS090523_R102013_L 1-002.dwg
DESIGNER DWG SHEET NO.
K.BAKER
DRAWN G-02
K.BAKER
CHECKED
T. HUGHES
SHEET2 OF 6
PROJECT NO.
051654-21-02
EDITED
u w w w l;;
z ..
w U)
...J ..
z w u w z w :ii w 0..
w w
...J 0..
0 "' i..
0 ..
e.
w U)
...J ..
z so u w
�.,, )0 z w w 0..
w w .,, ...J 0..
i..
0 ..
In u z u ls z ii!
w w z z w li1 w i:'i z
:c w .,, � u i:'i z
:c
� TO YOSEMITE NATIONAL PARK
.· o1
NOTES
a
RESTRIPE
ROADWAY
z 0 200
I
I ����I��� Feet
TO GROVELAND
ALL BOULDER BARRIERS SHALL BE INSTALLED ACCORDING TO DETAIL 1, SHEET D-01
ALL DELINEATORS SHALL BE INSTALLED ACCORDING TO DETAIL 2 , SHEET D-01
AFTER BOULDERS ARE HARVESTED, ANY DEPRESSION LEFT FROM BOULDER REMOVAL SHALL BE
FILLED AND COMPACTED WITH NATIVE SOIL
WORK NOTES:
1. INSTALL BOULDER BARRIERS APPROX. FROM STA 1+13 TO STA 2+00
2. RELOCATE FOUR EXISTING BOULDERS TO LOCATION DESCRIBED IN NOTE 1
3. INSTALL 72" DELINEATORS APPROX. FROM STA 3+13 TO STA 4+26
4. INSTALL FOUR NEW BOULDER BARRIERS
5. INSTALL NEW BOULDER BARRIERS TO SPAN APPROX. STA 5+26 TO STA 6+54
6. INSTALL 72" DELINEATORS TO SPAN APPROX. STA 6+25 TO STA 6+71
7. INSTALL 72" DELINEATORS TO SPAN APPROX. STA 6+81 TO STA 7+03
8. HARVEST FOUR BOULDERS FROM APPROX. STA 8+03 TO 8+46 AT BEGINNING OF PARKING
LOT
RESTRIPE
ROADWAY
START
5 i----------..
9. HARVEST FIFTEEN BOULDERS FROM APPROX. STA 7+68 TO 9+29 ALONG EXISTING "NO
PARKING" AREA
10. RELOCATE FIVE EXISTING BOULDERS FROM APPROX. STA 9+29 TO 9+92
11. INSTALL 72" DELINEATORS TO SPAN APPROX. STA 12+55 TO STA 13+78
12. INSTALL NEW BOULDER BARRIERS FROM APPROX. STA 14+55 TO STA 15+06
13. INSTALL TWO (2) NEW BOULDER BARRIERS FROM APPROX. STA 16+00 TO STA 16+18
14. INSTALL 72" DELINEATORS TO SPAN APPROX. STA 16+18 TO STA 17+53
15. INSTALL 72" DELINEATORS TO SPAN APPROX STA 18+18 TO STA 18+61
16. RELOCATE TWO (2) EXISTING BOULDERS, SEE NOTE 17
17. INSTALL TWO (2) BOULDER BARRIERS FROM APPROX. STA 19+20 TO STA 19+37
18. INSTALL 72" DELINEATORS TO SPAN APPROX. STA 19+37 TO STA 19+72
19. INSTALL NEW BOULDER BARRIERS FROM APPROX. STA 19+72 TO STA 20+33
20. INSTALL NEW BOULDER BARRIERS FROM APPROX. STA 21+84 TO 22+75
21. INSTALL 72" DELINEATORS TO SPAN APPROX. STA 23+09 TO 24+50
United States Department of Agriculture
Forest Service
(ROS}
PACIFIC SOUTHWEST REGION
PROJECT NAME
GAOA RAINBOW POOL DAY USE
AREA IMPROVEMENTS FOR
RECREATIONAL USE AND
SWEETWATER CAMPGROUND
REHAB. (D54)
STANISLAUS
NATIONAL FOREST
GROVELAND DISTRICT
DRAWING TITLE
BARRIER PLACEMENT
PLAN
DATE
12/31/2020
ARCHIVE NO.
FS090523_R102013_L 1-002.dwg
DESIGNER DWG SHEET NO.
K.BAKER
DRAWN C-01
K.BAKER
CHECKED
T. HUGHES
SHEET3 OF 6
PROJECT NO.
051654-21-02
:iii w w w iii Q z c( w ,,, ....I c( z w u w
� z w 0 ::.
I w a.
c( w c( w ,,, Q
....I a.
m z c(
:,; e.
w ,,, ....I c( z w u w
�,,,,_ z w :E w a.
c( w c( w ,,, ....I a.
m z c( u
� ,_ z u
:ill
" z ii!
w w z a z m ii:
w
,'.i'i z :c s w ,,, u w c( m z :c s &l
I __,___,___,___,_I --'---'-----'-_J Feet
2+so
3+oo
: 3+so
:_ \+OO
INSTALL GOVERNMENT FURNISHED
2-PANEL KIOSK WITH 2 SIGN PANELS
APPROXIMATELY IN FOOTPRINT OF
EXISTING SIGN
PROVIDE AND INSTALL 8"X8" WELDED STEEL FEE --.......___
COLLECTION TUBE WITH REMOVABLE FEE BOX \. o
"HARD ROCK RANGER" OR EQUAL
"'-- TRAIL TO P
CD--K_IO_S_K_L _O_CA_ T_!,-�-�.
WORK NOTES:
1. INSTALL 12" X 18" METAL SIGNAGE, RED LETTERING
ON WHITE BACKGROUND WITH REFLECTIVE
COATING. SIGNS SHALL COMPLY WITH MUTCD
STANDARDS AND SHALL READ "EMERGENCY
VEHICLES ONLY" AND DISPLAY DIRECTIONAL
ARROWS.
E EXISTING 1-PANEL
IN BOARD
FEE COLLECTION
TUBE
CONCRETE FOOTING
WELDED REBAR
ANCHORS
WORK NOTES:
1. INSTALL 2-PANEL ANGLED
KIOSK WITH 6" DIAMETER
POSTS IN ACCORDANCE
WITH MANUFACTURER'S
INSTALLATION
GUIDELINES
2. COR TO DETERMINE AND
STAKE EXACT LOCATION
OF KIOSK AND FEE TUBE
FEE TUBE INSTALLATION
N.T.S .
WITH ARROW Q
y INSTALL SIGN
Q POINTING RIGHT
INSTALL SIGN WITH
ARROW POINTING
BOTH WAYS
INSTALL SIGN WITH
ARROW POINTING
LEFT
RESTRIPE EMERGENCY PARKING ZONE
WITH NEW 4" SOLID RED STRIPING
EMERGENCY PARKING RESTR IPING
N.T.S.
United States Department of Agriculture
Forest Service
(R05)
PACIFIC SOUTHWEST REGION
PROJECT NAME
GAOA RAINBOW POOL DAY USE
AREA IMPROVEMENTS FOR
RECREATIONAL USE AND
SWEETWATER CAMPGROUND
REHAB. (D54)
STANISLAUS
NATIONAL FOREST
GROVELAND DISTRICT
DRAWING TITLE
OPTIONAL BID ITEMS -
RAINBOW POOL
DATE
12/31/2020
ARCHIVE NO.
FS090523_R10201 J_L 1-002.dwg
DESIGNER DWG SHEET NO.
K.BAKER
DRAWN 0-01
K.BAKER
CHECKED
T. HUGHES
SHEET5 OF 6
PROJECT NO.
051654-21-02
File details come from the government source that posted it. Updated .