specs.pdf
PDF 535 KB Posted
- Attached to
- Hardscrabble Refuse Reclamation Project
- Solicitation number
- JH27-130
- Issued by
- Cache County, Utah
About this file
Summary
This is a Construction Specifications document for the Hardscrabble Refuse Reclamation Project, a coal refuse reclamation project in Carbon County, Utah, administered by the Utah Abandoned Mine Land Reclamation Program. The project encompasses coal refuse waste excavation and haul, channel construction, site grading and earthwork, runoff control, revegetation of disturbed areas, and road realignment and resurfacing at an abandoned coal refuse pile. The work is divided into major bid items including mobilization/demobilization, access improvements, temporary drainage controls, demolition and cleanup, borrow and storage area excavation and fill, channel and tributary material excavation and disposal, site drainage improvements, road improvements, and revegetation. Key quantities include 25,391 cubic yards of coal refuse excavation, 50,522 tons of imported riprap for Class A material with D50=30", 13,291 tons of imported granular filter material, 35,441 square yards of geotextile liner, 3,141 square yards of road resurfacing, and 25,500 square yards of revegetation area. Bidders must guarantee completion within 84 calendar days after receipt of Notice to Proceed. The project is identified as JH22-148 and is scheduled for Summer 2026.
Bidding is conducted via an online bid form with detailed pricing provided in a separate Excel spreadsheet containing automated calculations. Bidders must submit a Utah contractor's license with the bid and identify all first-tier subcontractors, suppliers, and vendors whose contracts exceed $5,000 (for prime bids under $250,000) or $25,000 (for prime bids of $250,000 or more). Apparent low bidders must submit completed AML Contractor Information Forms to the Division of Oil, Gas and Mining within 24 hours of bid opening for Applicant/Violator System eligibility verification through the U.S. Office of Surface Mining Reclamation and Enforcement, as required by the Surface Mining Control and Reclamation Act of 1977. All successful bidders and subcontractors must certify that reclamation fees or civil penalty assessments under SMCRA have been paid. The project is funded through Title IV of SMCRA. Detailed submittal requirements include equipment lists, borrow area locations, drainage control plans, stream protection measures, seed supplier information, riprap gradation and source, geotextile material specifications, and Davis-Bacon Act wage determination worker classifications.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION SPECIFICATIONS
Hardscrabble Refuse Reclamation Project
Reclamation Construction
Carbon County, Utah
Summer 2026
Chapter 5: BID DOCUMENTS
Supplemental Bid Information Bidder's Proposed Subcontractors, Suppliers & Vendors List Minority and Woman Business Enterprise Representation Applicant/Violator System Eligibility Check Summary Bid Schedule Bid Schedule Required Submittals
Note:
These bid documents have been formatted as a fillable PDF form. Depending on your version of Adobe Acrobat (or Reader), fields to complete will be highlighted (or click the "Highlight Fields" button). Mandatory fields are outlined in color. Text fields are open-ended; scroll bars will appear if content exceeds the size of the box.
For the Bid Schedule, use the Excel spreadsheet provided separately. It has formulas to automatically calculate subtotals and totals. These fields cannot be overwritten.
The Excel spreadsheet provides the necessary supporting bid detail. No other cost data are needed in the PDF bid documents file.
When completed, save and upload the files as instructed.
5: 1
Supplemental Bid Information
Name of Bidder:
COMPLETION TIME:
I/We guarantee to complete the WORK within 84 calendar days after receipt of Notice to Proceed, should I/we be the successful bidder.
LICENSING:
CONTRACTOR's License Number for Utah:
License Classification(s):
Expiration Date:
Copy of license must be enclosed with hard copy bid or uploaded with electronic bid.
Type of Organization:
(Corporation, Co-Partnership, Individual, etc.)
AVS CERTIFICATION:
If applicable, the CONTRACTOR shall certify that all reclamation fees or civil penalty assessments required by the provision of the Surface Mining Control and Reclamation Act of 1977, P.L. 95-87, 30 U.S.C. Sec 1201 et seq., have been paid. Provided further, this certification requirement shall also apply to all Subcontractors utilized by the successful bidders.
5: 2
Bidder's Proposed Subcontractors, Suppliers & Vendors List
We submit the following list of first-tier subcontractors, suppliers and vendors for OWNER approval.
We recognize this list as binding on us, and acknowledge OWNER'S right to reject any or all subcontractors, suppliers or vendors listed or unlisted which the OWNER feels are unqualified to do the work.
Subcontractor Contract Amount
State Contractor’s License No.
License Limit
Excavation:
Demolition:
Revegetation:
Trucking/Transport:
Other:
Other:
Other:
Riprap:
Imported Fill:
Seed Mix:
Gravel:
Other:
Other:
5: 3
By submitting a bid under this solicitation, we certify that:
1. This list includes all subcontractors, suppliers and vendors whose bids exceed $5,000 (for prime contractor bids less than $250,000) or $25,000 (for prime contractor bids of $250,000 or more).
2. Where we have listed "Self" it is our intent to perform said work and that we generally and regularly perform that type of work, and are appropriately licensed.
3. Any approved change in sub-bidders, suppliers or vendors which results in a lower contract price for sub-bid work shall accordingly reduce the total sum of the prime contract.
Note: Failure to submit this form properly completed and signed may be grounds for OWNER'S refusal to enter into a written CONTRACT with BIDDER. Action will be taken against BIDDER'S bid bond or cashier's check as deemed appropriate by OWNER. Timely notice of unacceptable subcontractors, suppliers or vendors will be given to the BIDDER. Reporting of subcontractors may be required for conformance with 63A-5-208 UCA.
5: 4
Minority and Woman Business Enterprise Representation Hardscrabble Refuse Reclamation Project
The offeror represents that it [_]is [_]is not a minority business enterprise.
A minority business enterprise is defined as a concern that:
1) is at least 51 percent owned by one or more individuals who are socially and economically disadvantaged, or a publicly owned business having at least 51 percent of its stock owned by one or more individuals who are socially and economically disadvantaged individuals; and
2) has its management and daily business controlled by one or more such individuals.
Qualified groups. The offeror shall presume that socially and economically disadvantaged individuals include Black Americans, Hispanic American, Native Americans, Asian-Pacific American, Asian-Indian Americans, and other individuals found to be qualified by the Small Business Administration under 13 CFR 124.l.
The offeror represents that it [_]is [_]is not a woman business enterprise.
A woman business enterprise is defined as a concern that:
1) is at least 51 percent owned by one or more women, or a publicly owned business having at least 51 percent of its stock owned by one or more women; and
2) has its management and daily business controlled by one or more of the women owners.
Business firms that are 51 percent owned by minorities or women, but are in fact managed and operated by non-minority individuals do not qualify as minority or woman business enterprises.
The offeror represents that the following proposed subcontractor(s) is (are) a minority or woman business enterprise:
This information is requested for Federal reporting purposes only.
Minority/woman status has no bearing on the selection of a contractor.
5: 5
Applicant/Violator System Eligibility Check
(Data to be submitted after Bid Opening)
Federal regulations (30 CFR 874.16) effective July 1, 1994, require all successful bidders on contracts funded through Title IV of the Surface Mining Control and Reclamation Act (SMCRA) of 1977 to be eligible under 30 CFR 773.15(b)(1) to receive a permit to conduct surface coal mining operations. In general, this means that the Utah Abandoned Mine Reclamation Program may not hire a contractor who is or whose company is associated with a coal mine operator with outstanding unabated violations under SMCRA. The regulations further require that contractor eligibility be confirmed by the Applicant/Violator System (AVS) at the U.S. Office of Surface Mining Reclamation and Enforcement (OSMRE). Compliance checks are also required for all subcontractors.
To comply with these rules, the apparent low bidder must provide the Division of Oil, Gas and Mining with information on the ownership and control of the firm for AVS review. A bidder must receive a recommendation of "Issue" or "Conditional Issue" from the OSM AVS office to be awarded the contract.
The apparent low bidder shall submit to DOGM within 24 hours (excluding weekends and holidays) of the bid opening a completed copy of the "AML Contractor Information Form." This form is used to provide, correct, or update your company’s ownership and control information in OSMRE’s AVS database. DOGM will provide forms for these submissions (a facsimile is provided in Chapter 2).
DOGM will submit the ownership and control information to OSMRE for AVS review. OSMRE's review will be completed within 72 hours if the ownership and control data entry is complete.
The following information is required for the "AML Contractor Information Form":
● Contractor's identity (name, address, telephone, fax, e-mail address, tax payer ID number).
● Contractor's legal structure (sole proprietorship, partnership, corporation).
● Identities (name, address, telephone, title, % ownership, dates with the company) of every officer, general partner, shareholder (≥10% voting stock), director, or other controlling entity.
● All of the above information for any subcontractors.
5: 7
Summary Bid Schedule
This bid schedule is provided in the specifications for information only. For bidding, use the Excel spreadsheet (XLSX file) provided separately with the online bid solicitation. The Excel spreadsheet provides the necessary supporting bid detail. No other cost data are needed in this PDF bid form.
Variation in Contract Bond Rate: %
TOTAL CONTRACT BID PRICE WRITTEN:
By submitting a bid under this solicitation, I/we acknowledge that I/we have examined the site conditions and have made the measurements and evaluations necessary to plan and bid the
WORK.
Notes:
The total contract bid price entered here MUST match the total bid price entered in the item section on Purchasing’s online bid form. If the amounts are different, the bid price entered in the item section of the online bid form will be considered the correct bid and will be considered the official bid to be evaluated with other bids received.
The "Variation in Quantity Unit Price" on the Bid Schedule will be used for adjustments to the CONTRACT amount where the actual WORK quantity varies by more than 15% from the estimated quantity listed in the Bid Schedule (see Supplemental General Condition No. 26: Variation in Estimated Quantities). The "Variation in Quantity Unit Price" will also be used as the basis for determining costs for tasks not currently specified in the WORK that may be added in the future by change order.
Award of CONTRACT will be based on the base "Bid Price." Contractors are cautioned to submit accurate unit prices for any variations in quantities. Verified quantities can go either up or down from the original estimated quantities. If a unit price appears high at the time of any change order, the OWNER reserves the right to negotiate that unit price down to a reasonable amount regardless of the unit prices quoted in this section.
The "Variation in Contract Bond Rate" will be used to adjust the Lump Sum Amount for bonds when the CONTRACT amount changes (see Section 0200, Part 5.01.D).
5: 8
Bid Schedule [Hardscrabble Refuse Reclamation] Project
This bid schedule is provided in the specifications for information only. For bidding, use the Excel spreadsheet (XLSX file) provided separately with the online bid solicitation. The Excel spreadsheet provides the necessary supporting bid detail. No other cost data are needed in this PDF bid form.
OWNER: Utah Abandoned Mine Land Reclamation Program PROJECT:
Hardscrabble Refuse Reclamation
PROJECT #: JH22-148
BID SCHEDULE
Bid Item
No. Item Quantity Unit Bid Price Amount Sub-Item Bid Price Amount
Variation in Quantity Unit Prices
1 Mobilization / Demobilization 1 LS $
2 Access Improvement 1 LS $
2a Construct Temporary Access Improvements 1 LS $ $
2b Reclaim Temporary Access Improvements 1 LS $ $
3 Temporary Drainage Controls 1 LS $
3a SWPPP Management & Inspections 1 LS $ $
3b Sediment Control Log 1,600 LF $ $
3c Heavy Duty Silt Fence 200 LF $ $
3d Temporary Rock Filter Dike 5 EA $ $
4 Surveying & Construction Staking 1 LS $
5: 9
No. Item Quantity Unit Bid Price Amount Sub-Item Bid
Price Amount Variation in Quantity
Unit Prices
5 Demolition & Clean Up 1 LS $
5a Demolition & Clean Up 1 LS $ $
5b Dust Control 1 LS $ $
Subtotal (to bid summary) $
Hardscrabble Canyon Coal Disposal, Channel, Drainage, and Roadway Improvements
6 Borrow & Storage Area Excavation & Fill 1 LS $
6a Excavation & Stockpile of Topsoil Material 644 CY $ $
6b Excavation & Stockpile of Native Material 4,286 CY $ $
6c Screening & Production of Riprap Material from Excavated Native Material 857 CY $ $
6d Placement of Native Material On-Site (Clean Cover Soil) 966 CY $ $
6e Place Salvaged Topsoil 644 CY $ $
7 Channel & Tributary Material Excavation & Disposal 1 LS $
7a Excavate Coal Refuse 25,391 CY $ $
7b Placement of Unsuitable Coal Refuse in Borrow / Storage Areas 5,150 CY $ $
7c Deliver Coal Refuse to Sunnyside Cogen 0 TON $ $
7d Dispose Unsuitable Coal Refuse @ ECDC Landfill 25,747 TON $ $
7e Excavation & Stockpile of Native Material 30,692 CY $ $
7f Screening & Production of Riprap Material from Excavated Native Material 5,752 CY $ $
7g Dispose Excess Native Material @ Carbon County Landfill (Daily Cover) 780 TON $ $
8 Site Drainage Improvements 1 LS $
8a Riprap (Class A, D50=30", Produced On-Site) 3,407 CY $ $
8b Riprap (Class A, D50=30", Imported) 50,522 TON $ $
8c Granular Filter Material (Imported) 13,291 TON $ $
8d Placement of Native Material On-Site (Channel, Side Slopes, Riprap Voids) 29,912 CY $ $
5: 10
No. Item Quantity Unit Bid Price Amount Sub-Item Bid
Price Amount Variation in Quantity
Unit Prices
8e Haul & Place Riprap 34,983 CY $ $
8f Haul & Place Granular Filter 8,307 CY $ $
8g Geotextile Liner 35,441 SY $ $
8h Excavation of Bedrock 2,000 SF $ $
8i Tributary #1 Channel Construction 1 LS $ $
8j Tributary #2 Channel Construction 1 LS $ $
8k Tributary #3 Channel Construction 1 LS $ $
8l Tributary #4 Channel Construction 1 LS $ $
8m Tributary #5 Channel Construction 1 LS $ $
8n Tributary #6 Channel Construction 1 LS $ $
8o Rock Check Dam & Stilling Basin (Downstream) 1 LS $ $
8p Concrete Keyway Construction (Upstream End Main Channel) 1 LS $ $
9 Road Improvements 1 LS $
9a Road Improvement: Resurface Road Section 3,141 SY $ $
9b Road Improvement: Reconstructed Road Section 634 SY $ $
9c Riprap for Ditch Construction (D50=15", Imported or Produced On-Site) 2,861 TON $ $
9d Haul and Place Riprap for Ditch Construction 1,788 CY $ $
9e New Gate (20' Wide Swing Gate) 1 EA $ $
9f Low Water Crossing #1 1 LS $ $
9g Low Water Crossing #2 1 LS $ $
Subtotal (to bid summary) $
10 Revegetation 1 LS $
10a Furnish and Place Growth Media (Topsoil) 4,254 CY $ $
10b Scarification 25,500 SY $ $
10c Pocking 25,500 SY $ $
5: 11
No. Item Quantity Unit Bid Price Amount Sub-Item Bid
Price Amount Variation in Quantity
Unit Prices
10d Straw Mulch 5.3 ACRE $ $
10e Broadcast Seed Mix (Type) 10.5 ACRE $ $
Subtotal (to bid summary) $
Subtotal (Construction) $
Non-Construction Costs
11 Non-Construction Costs
NA
11a Insurance $
11b Bonds $
$ - TOTAL CONTRACT BID PRICE
Note: If a unit price appears to be excessive based on the market, OWNER reserves the right to negotiate that unit price for any change order.
Otherwise the unit prices will be as bid.
5: 12
Required Submittals
Provide the requested information in the space provided.
Instructions to Bidders, Item 5: Contractor’s License Enter the license number, class, and expiration date in the spaces provided on the Supplemental Bid Information form. Also attach a copy of the license as instructed elsewhere in this document.
Chapter 1: Listing of Subcontractors- CONTRACTOR shall submit with the Bid a list of the names of Subcontractors to be furnished for each of the principal parts of the work and the corresponding dollar amounts. Each principial part shall mean a subcontract dollar value in excess of $5,000.
Such list shall be binding upon the CONTRACTOR; however, OWNER has a right to reject any and or all Subcontractors listed or unlisted which OWNER feels are unqualified to do the work.
Chapter 2: Davis-Bacon Act Wage Determination – Worker Classification CONTRACTOR shall submit with the Bid the worker classification of all workers, I.E.
Laborers, Operators etc. CONTRACTOR shall specify any classifications that are not listed on the wage determination.
Section 0230: Access Improvement
1.02 The CONTRACTOR shall submit with the Bid a description of access improvements to be performed at each site and shall not deviate from this plan without the written approval of the OWNER.
5: 13
Section 0240: Demolition and Clean-up
1.02 A. CONTRACTOR shall submit with the Bid demolition and removal procedures and schedule for approval.
Section 0251: Cast-In-Place Concrete
1.02 A. 1. CONTRACTOR shall submit with the Bid laboratory reports indicating that the supplier's concrete ingredients meet specified requirements.
Section 0270: Site Grading/Earthwork
1.02 A. CONTRACTOR shall submit with the Bid a list of equipment to be used to complete this section of the WORK.
1.02 B. CONTRACTOR shall submit with the Bid locations of borrow areas for fill and topsoil for the approval of the OWNER when such areas are not shown on the Drawings.
Section 0275: Material Transport
1.02 A. The CONTRACTOR shall submit with the Bid a list of equipment to be used to complete this section of the WORK.
5: 14
0280: Drainage Control & Stream Protection
1.02 A. CONTRACTOR shall submit with the Bid the schedule and plan for implementing drainage control measures and for utilizing riprap, gabion mattress, or a combination of systems in accordance with these Specifications and Drawings. If a combination of systems is planned, specific locations for each item shall be identified. Also included shall be specifications of riprap or gabion mattress fill material if supplied as import, and specifications for gabion mattress to be used.
1.02 B. The CONTRACTOR shall submit with the Bid a description of and location of stream protection measures to be used at each site.
Section 0290: Revegetation
1.02 A. CONTRACTOR shall submit with the Bid the names of one seed supplier, and alternate, to be used for the seed mixtures required by these specifications.
1.02 B. CONTRACTOR shall submit with the Bid a written description indicating equipment to be used to perform the work required in this section.
5: 15
Section 0300: Site Grading/Earthwork
3.01 E. CONTRACTOR shall submit with the Bid a list of equipment to be used and identify method(s) for rubblizing the large boulders located within the stream channel at stations 16+00 and 17+50.
Section 0310: Road Construction Aggregates
1.03 A. CONTRACTOR shall submit with the Bid a list of equipment to be used to complete this section of work.
Section 0320: Riprap
1.03 A. CONTRACTOR shall submit with the Bid the source and gradation of riprap material.
Section 0320: Riprap
1.03 B. CONTRACTOR shall submit with the Bid the source and gradation of granular filter materials.
Section 0320: Riprap
1.03 C. CONTRACTOR shall submit with the Bid the geotextile material specifications.
5: 16
Section 0320: Riprap
1.03 D. CONTRACTOR shall submit with the Bid plans for how the large boulders located in the stream channel will be removed and utilized a potential riprap source.
| Name of Bidder: |
| Type of Organization: |
| Contractor License Number: |
| License Classification: |
| Expiration Date: |
| Lic Limit OT3: |
| Subcontractor Exc: |
| Amount Exc: |
| Lic No Exc: |
| Lic Limit Exc: |
| Subcontractor Demo: |
| Amount Demo: |
| Lic No Demo: |
| Lic Limit Demo: |
| Subcontractor Reveg: |
| Amount Reveg: |
| Lic No Reveg: |
| Lic Limit Reveg: |
| Subcontractor TT: |
| Amount TT: |
| Lic No TT: |
| Lic Limit TT: |
| Subcontractor OT1: |
| Lic No OT1: |
| Lic Limit OT1: |
| Subcontractor OT2: |
| Lic No OT2: |
| Lic Limit OT2: |
| Subcontractor OT3: |
| Amount OT3: |
| Lic No OT3: |
| Supplier/Vendor Seed: |
| Product Seed: |
| Amount Seed: |
| Amount OT1: |
| Supplier/Vendor Riprap: |
| Amount Riprap: |
| Product Riprap: |
| Amount OT2: |
| Supplier/Vendor Imported Fill: |
| Amount Imported Fill: |
| Product Imported Fill: |
| Supplier/Vendor Gravel: |
| Amount Gravel: |
| Product Gravel: |
| Supplier/Vendor OT1: |
| Supplier/Vendor OT2: |
| Amount Other Supply 1: |
| Product Other Supply 1: |
| Amount Other Supply 2: |
| Product Other Supply 2: |
| Minority: Off |
| Woman: Off |
| Min/Wom Subcontractor 1: |
| Min/Wom Subcontractor 2: |
| Chapter 1 Listing of Subcontractors: |
| Chapter 2 Davis-Bacon Act Wage Determination-Worker Classification: |
| Section 0230 1: |
| 02 Submittal: |
| Section 0240 1: |
| 02: |
| A: |
| Submittal: |
| Section 0251 1: |
| 02: |
| A: |
| 1: |
| Submittal: |
| Section 0270 1: |
| 02: |
| A: |
| Submittal: |
| B: |
| Submittal: |
| Section 0275 1: |
| 02: |
| A: |
| Submittal: |
| Section 0280 1: |
| 02: |
| A: |
| Submittal: |
| B: |
| Submittal: |
| Section 0290 1: |
| 02: |
| A: |
| Submittal: |
| B: |
| Submittal: |
| Section 0300 3: |
| 01: |
| E: |
| Submittal: |
| Section 0310 1: |
| 03: |
| A: |
| Submittal: |
| Section 0320 1: |
| 03: |
| A: |
| Submittal: |
| B: |
| Submittal: |
| C: |
| Submittal: |
| D: |
| Submittal: |
File details come from the government source that posted it. Updated .