This solicitation requests proposals for Project 520-18-119 to install a photovoltaic array at the Joint Ambulatory Care Clinic in Pensacola, Florida. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 seeks proposals to design and construct a fully functioning solar PV power system, including carport structures in four parking lot sites. Proposals are due by August 29, 2022 and contract award will occur on or around September 22, 2022. The anticipated cost range is between $4-6.5 million. The selected contractor will be responsible for design, permitting, equipment, installation, and interconnection of the solar array to meet the project objectives.

View the file

Other files for this federal contract opportunity

Other files attached to 520-18-119 Install Photovoltaic Array, JACC, newest first.
File Type Posted
VOL 2 BINDER.pdf PDF
VOL 3 BINDER.pdf PDF
VOL 1 BINDER.pdf PDF
36C25623R0039 RFIs main.docx DOCX document
36C25623R0039 0002.pdf PDF
36C25623R0039 0001.docx DOCX document
JACC solar ICRA Pre_Construction.pdf PDF
Drawings.pdf PDF
DB-ATTACH ATTACHMENT I - RELEASE OF CLAIMS.docx DOCX document
36C25623R0039 Solicitation 12-29-2022.pdf PDF
36C25623R0039 EXHIBIT F.docx DOCX document
VHA Supplemental Contract Requirements for Combatting COVID-19.docx DOCX document
SOW_JACC SOLAR PV rev 10-5-22.docx DOCX document
36C25623R0039 EXHIBIT E.docx DOCX document
36C25623R0039 EXHIBIT D.docx DOCX document
36C25623R0039 EXHIBIT B.docx DOCX document
36C25623R0039 EXHIBIT A.docx DOCX document
36C25623R0039 EXHIBIT C.docx DOCX document
WD FL20220203 Mod 3 Dtd 9-01-2022.txt TXT text file
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00 11 21

REQUEST FOR PROPOSAL TO DESIGN BUILD

JACC SOLAR/PHOTOVOLTAIC PROJECT

520-22-119

PENSACOLA JACC, 790 VETERANS WAY, PENSACOLA, FL 32507

A. PART I - GENERAL

A1. Scope of Contract

Provide all labor, materials, tools and equipment, and design-build services necessary for design and construction of a project described here in other specific tasks as further defined by this request for proposal (RFP).

A. Scope of Work:

Provide the necessary labor, material, equipment, and qualified supervision to design and construct a fully functional Photovoltaic Solar System for the VA Gulf Coast Veteran’s Healthcare System - JACC, located at 790 VETERANS WAY, PENSACOLA, FL 32507. The scope of work shall include the base and option items listed below.

• Base Item, Site 1: Southeast Handicap Patient Parking

Structures (28 spaces)

• Base Item, Site 2: Southwest Handicap Patient Parking

Structures (43 spaces)

• Option Item, Site 3: 2nd Row Patient Carport Structures (64 spaces)

• Option Item, Site 4: 3rd Row Patient Carport Structures (64 spaces)

See site descriptions below for potential photovoltaic (PV) carport locations around the JACC. A detailed proposal shall be submitted for each indicated area. The proposal shall provide the calculated total DC and AC kW power output generated for each site. The optimal configuration of areas and sizes of PV power (DC & AC rating) shall be proposed by the contractor and the successful contractor shall be based on the Solar PV System which provides the best economic returns for the VA based on dollars per kW AC output.

1.1 Site Descriptions

This work involves the complete design, engineering, and construction of a fully functioning Solar PV Power system including, but not limited to the equipment selection, updated parking lot arraignment and features, parking lot resurfacing, construction of carport structures, permitting, bonding, and construction of a photovoltaic system.

The proposal shall describe how solar power is interconnected to the Pensacola, JACC campus electrical distribution system. Contractor shall assess the proposed site areas, and provide construction details and plans to ensure topographical conditions are suitable for the proposed construction. The plan shall at a minimum, identify the array plan view, possible shadow zones, inverter/transformer locations, carport spacing, number of affected parking spaces, carport structural details, mounting details and (above and below grade) wire routing. All site preparation work shall be accomplished by the contractor and schedules shall be approved by the government Project Manager and Contracting Officer’s Representative (COR) prior to commencing work.

All JACC parking lot are constructed of asphalt pavement with concrete traffic islands to control traffic movement. Most spaces are orientated East/West and may have to be changed to North/South pending design. Each traffic island has landscaping. Each lot consist of mostly 2-lane traffic between parking bays striped perpendicular to the traffic lanes. Each lot also contains handicap spaces. Each lot has trees along the perimeter and in all traffic islands. The trees located in traffic islands adjacent to the proposed canopies are to be removed and hauled off site. Tree stumps and roots are to be grinded to a minimum of 6 inches below existing grade.

Carports are to be double cantilevered steel framed structures and have a metal standing seam roof. The solar module arrays will attach to the metal standing seams using a conventional rail system. The steel frame is to be painted to match the building trim elements and the standing seam roof is to match the color of the existing metal roof.

The electric power generated by this Solar PV system may be supplied to the closest switchgear with available capacity that connects to the facility distribution system near the parking lot areas. System design and equipment specifications shall minimize maintenance requirements and be in alignment with Gulf Power’s (Florida Power and Light) expectations and requirements for net metering.

While it is expected that one of the parking lots will be used as a laydown area, the Contractor shall coordinate with the COR and the Facility Manager for proper phasing of the work in order not to hinder and aggravate traffic and parking conditions at the JACC.

Site 1: Southeast Patient Carport Handicap Parking (28 spaces)

The intent for Site 1 is to have carport structures built at the locations shown in Figure 1.

Figure 1: Southeast Patient Carport Handicap Parking (28 spaces)

Site 2: Southwest Patient Carport Handicap Parking (43 spaces)

Figure 2: Southwest Patient Carport Handicap Parking (43 spaces)

Site 3: (OPTION) 2nd Row Patient Carport Structures (64

Figure 3: (OPTION) 2nd Row Patient Carport Structures (64 spaces)

Site 4: (OPTION) 3rd Row Patient Carport Structures (64 spaces)

Figure 4: (OPTION) 3rd Row Patient Carport Structures (64 spaces)

The final system configuration shall allow automatic operation without operator intervention. It is the intention of the VA to connect this PV main metering system into a nation-wide meter data aggregation system in the future. Metering systems which facilitate interconnection with this data aggregation system will be preferred. Meters such as the ION 7650/7550 for AC or similar are recommended. The contractor will be responsible for interconnecting with the existing system for data transfer. The system shall have Main Metering capabilities for each individual site. In addition, metering shall be provided to monitor performance of the arrays within each site, with the data to be used by facility personnel. This metering shall measure the output of each combiner box, and may be located at each re-combiner box. This monitoring is for the purpose of tracking performance and alarming conditions of individual arrays that are under-performing. Performance shall be logged every 15 minutes. This monitoring shall be connected to existing VA local metering system via a wired RS485 and if necessary, a fiber connection to all re-combiner boxes. Performance shall be logged every 15 minutes. This monitoring shall be connected to existing VA local metering system via a wired RS485 and if necessary, a fiber connection to all re-combiner boxes.

The PV metering system shall be connected into the VA Corporate-Wide Advanced Utility Metering Database (proprietary Schneider System). Metering systems which interconnect with this system shall be required. Meters such as the Power Logic ION units for AC or similar are recommended. Campus has an existing metering system in place which has an interconnection with the VA National metering system. The contractor will be responsible for interconnecting with the existing system for data transfer. The system shall have Main Metering capabilities for each individual site.

1.2 System Requirements

a. Main Individual Site Metering system shall:

1. Be revenue grade (ANSI C12.20 - 0.2)

2. Comply with EN50160, EC 61000-4-30 Class A, and IEEE 1159

3. Be capable of disturbance direction detection

4. Contain at least 5MB of onboard memory with data logging and event recording capacity to account for network outages and downtime.

5. Contain a minimum of 5 digital inputs

6. Contain multiple electromechanical and solid-state outputs to allow a high level of integration with 3rd party devices and systems.

7. Include LAN (Ethernet or wireless) connectivity which allows remote monitoring and troubleshooting and for connection with the VA utility metering data aggregation system.

8. Collect and transmit system performance data to include at a minimum solar irradiance, DC power, AC real power, AC current, AC voltage, and power factor; ambient air temperature, PV cell temperature and AC energy produced (hourly, daily, monthly, yearly). Logging shall be recorded in 15-minute intervals.

9. Provide remote monitoring of real-time system performance data (as outlined above) on a web-based portal. All service fees associated with data collection, transmission, monitoring, and hosting shall be borne by the contractor for a period of five years from system startup.

10. The successful contractor will integrate new meters with the VA Campus-Wide Siemens Desigo Management System such that all meters will be displayed at all Siemens workstations for display and monitoring. Contractor will provide additional Siemens panels as required for connection.

11. Be capable of integration with the VA Corporate-Wide Advanced Utility Metering Database located at the Schneider Electric facility located in St. Louis, Mo. Contractor will be responsible of coordinating this effort with the Successful Contractor awarded the contract for integrating existing meters at all VA facilities nationwide. That successful contractor will be identified prior to installation of metering system.

b. Combiner Box Metering system shall:

1. Monitoring instantaneous and average DC current of each combiner box.

2. Capable of reporting individual, total and average of each combiner box every 15 minutes

3. Capable of setting alarming points for out-of-range performance.

4. Accuracy of +/- 1%

5. Communicate via a two wire RS485 Modbus to local VA Data Acquisition Metering

(DAS) Automatic Metering System (AMR).

6. Capable of being viewed on web-based portal

7. RS485 terminals shall be electrically isolated for safety

8. Current Transformers (CTs) capable of measuring the full output of each combiner box

9. Suitable for outdoor installation in NEMA cabinet and cooling fans provided if needed for circuitry protection.

10. Reporting of Printed Circuit Board (PCB) Temperature

11. System shall be capable of economically reporting all combiner box parameters every

15 minute and retaining information for at least 5 years.

12. Metering logging and communication may be independent from the Main Individual

Site Metering system.

1.3 Contractor Requirements

The Contractor Shall:

1. Be solely responsible for compliance to federal, state and local Safety (OSHA, etc.), International Building Codes, Life and Fire Safety (NFPA, etc.) and Environmental (EPA, etc.) rules and regulations. Contractor shall submit all required programs, plans and documents with respect to regulatory compliance (Project Specific Safety Plan, etc.).

2. Be solely responsible for the verification of existing conditions ensuring to ascertain the site conditions that may affect required equipment clearances, electrical, metering, control and mechanical requirements of the contract;

3. The contractor shall comply with, review, and incorporate any interconnection agreements, utility-required disconnects, and utility-grade meters into this project.

4. The contractor shall assist the Medical Center Energy Manager to apply for and obtain the maximum applicable state grants or incentives for a photovoltaic construction for their site from the local utility provider, Gulf Power (Florida Power and Light).

Contractor shall pay any application fee(s) for Gulf Power (Florida Power and Light) rebate(s) and will be reimbursed after completion of the project.

5. Determine the techniques, means, method, and materials of construction to meet the requirements of this contract and provide a proposal to accomplish the work described herein.

6. Provide all labor, materials, equipment, supervision, and management required to implement the proposal and to provide a fully operational system.

7. Provide all general construction work. Any structural and architectural work must be approved by the VA’s Contracting Officer’s Representative (COR) prior to construction. Also, contractor shall comply with local and V.A. building code requirements and have a Florida-licensed Structural Engineer review and stamp solar construction plans and specifications.

8. Coordinate with VA and local authorities to minimize pedestrian and traffic disruptions during delivery and construction.

9. Provide manufacturer start-up, testing and document final operation.

10. Provide as-built documentation, record drawings, Operation and Maintenance (O&M) manuals and operator training.

11. PV modules shall have minimum 20-year limited warranty that modules will generate not less than 80% of rated output under Standard Test Conditions (STC). PV modules that do not satisfy this warranty condition for any reason shall be replaced within two (2) weeks. Warranties on any replacement PV modules shall be for 20 years from date of replacement. The respective shippers shall prepay shipping costs in each direction.

Panels shall be part on the CEC list of approved modules.

12. All PV systems shall carry a five-year warranty from both the manufacturer and the installer, including parts and labor. Warranty shall start on the date of Substantial Completion.

13. Provide the VA a complete turn-key, commissioned and warranted system as outlined in this contract.

14. Design of solar PV system of sites will include that the system automatically senses any loss of utility or start-up of the generators and disconnects the Solar PV inverters during any operation of the emergency generators. The Solar PV system is required to re-connect to the power grid by manual means only.

2. Technical Requirements

The contractor is solely responsible for determining the techniques, means, methods, and materials of construction to meet the requirements of this contract. All work shall comply with OSHA, VA Specifications and local code requirements including seismic requirements. VA Specifications shall be used and can be located at the following link:

http://www.cfm.va.gov/til/spec.asp. All products that are listed, tested, identified, or labeled by Underwriters Laboratories (UL), Factory Mutual (FM), Edison Testing Laboratories (ETL), or other National Testing Organization shall be used when available. With Contracting Officer approval, non-listed products are only permitted when listing does not exist. Disconnects and switches shall be DC rated when used in DC applications.

The inverter(s) disconnects and associated electrical equipment must be located in an accessible area, weather-protected and secure. Disconnects and over-current devices shall be mounted in approved boxes, enclosures, or panel boards. Metal enclosures/boxes shall be bonded to the grounding conductor. An electrical meter with built-in modem shall be provided that is capable of recording kWh produced by the PV system and instantaneous kW of the system.

Transformers, if required, shall have an efficiency of greater than 97%. Transformers shall be housed in a NEMA 3R enclosure and have removable bollards installed around each pad in accordance with Gulf Power (Florida Power and Light) electric service standards.

Inverters shall be UL 1741 Certified. Inverters shall have a minimum 15-year warranty.

Inverters shall not be in direct sun.

Automatic reclosing circuit breakers should be provided for undervoltage protection and other events. This is to reduce erroneous trips and extended downtime where the arrays are not producing power. An annunciator panel shall also be installed in the JACC maintenance shop to alert staff in the event an array is in an alarm state.

The proposed carport structures shall be double cantilevered structures for modules located on the surface parking lot area. The proposed carport components shall be constructed of industrial /commercial grade materials properly rated, protected and suitable for the application. Structural calculations and carport design shall be submitted to VA for approval prior to final design.

The PV carports shall be positioned to maximize the effectiveness of traffic ingress and egress while also considering the optimal positioning for energy capture. These recommendations should be submitted to the VA for approval prior to final design and construction.

The Contractor will be responsible for designing and delivering a system that provides permanent video surveillance coverage of all areas where this project blocks or removes existing cameras, including areas obscured by carports. The cameras will interface with the facility’s existing video surveillance system and the contractor will work with the COR and VA Police to ensure seamless integration of cameras. Existing security cameras may need to be relocated if proposed structures interfere with coverage. Camera images must be in color, not in black and white. Cameras must have IP connectivity.

Under canopy LED lighting shall be installed to suitably illuminate the covered parking areas during nighttime hours. Signage shall be installed per the requirements of the Master Construction Specifications (PG-18-1) Division 10, Section 10 14 00 (Signage).

Minimum canopy vehicle clearance heights shall be explicitly identified in the proposal and approved by VA prior to final design and construction. The carport structures shall have a metal standing seam type roof which the module rail system shall be attached to. The standing seam type roof shall match the color of the existing metal roof at the JACC http://www.cfm.va.gov/til/spec.asp

Pensacola. The steel for the car port structures shall be painted to match the existing JACC building trim elements. The PV solar panel mounting structure shall be corrosion resistant.

NOTE: The contractor shall stage all contract work with the COR and Engineering representative to minimize system downtime (i.e. electrical shutdown). Any system downtime (i.e. electrical shutdown) shall be scheduled during weekends and/or after business hours. Downtimes shall be approved by the COR and Engineering representative at least two weeks prior to the shutdown. Coordinate all work with the COR and Engineering representative.

3. Roles and Responsibilities

a. Documentation: The Department of Veterans Affairs (VA) COR will provide the contractor with copies of existing site documents based upon availability and need.

The contractor shall request other government documentation deemed pertinent to the work accomplishment directly from the COR. The contractor shall consider the COR as the final source for needed government documentation when the contractor fails to secure the documents by other means. The contractor is expected to use common knowledge and resourcefulness in securing all other reference materials, standard industry publications, and related materials that are pertinent to the work.

b. Communications: The contractor shall maintain frequent communications with the COR and other designated Veterans Health Administration (VHA) staff and the VA Team to conduct work in progress reviews. Progress reports shall be delivered to the COR and other authorized assigned VA representative or designee on a monthly basis via electronic mail.

c. Credits/Incentives or Grants: VA will retain all REC (Renewable Energy

Credits), Incentives and/or associated with the scope of work in this solicitation.

4. Contractor Requirements, Confidentiality and Non-Disclosure

a. The contractor shall follow all Government rules and regulations regarding information security to prevent disclosure of sensitive information to unauthorized individuals or organizations.

b. Contractor staff and management may have access to some privileged and confidential materials of the United States Government such as budget and strategic plans. These printed and electronic documents are for internal use only, are not to be copied or released without permission, and remain the sole property of the United States Government. Some of these materials may be protected by the Privacy Act of 1974 (revised by PL 93-5791) and Title 18. Unauthorized disclosure of Privacy Act or Title 18 covered materials is a criminal offense.

c. Regulatory standard of conduct governs all personnel directly and indirectly involved in procurements. All personnel engaged in procurement and related activities shall conduct business in a manner above reproach and, except as authorized by statute or regulation, with complete impartiality and with preferential treatment for none. The general rule is to avoid strictly any conflict of interest or even the appearance of a conflict of interest in Government- contractor relationships.

5. Other Personnel Considerations

a. Personnel assigned by the contractor to the performance of work on this contract shall be acceptable to VA in terms of personal and professional conduct and technical knowledge.

Should the assignment to this contract of any person by the contractor be deemed to conflict with the interests of VA, or in the event performance is deemed to be unsatisfactory at any time during the life of the contract, the Contracting Officer may notify the contractor and request the person be immediately removed from the assignment. The reason for removal will be documented and a request to receive personnel replacement within three (3) business days of the notification will be made.

Replacement personnel qualifications shall be equal to or greater than those of the personnel being replaced. Employment and staffing difficulties will not be justification for failure to meet established schedules.

b. The contractor must notify Veterans Health Administration (VHA) ten (10) calendar days in advance and the Project Manager (PM) and COR will approve or reject new proposed contractor key personnel for the performance of this contract. The contractor shall submit a resume of qualifications and the Contractor Personnel Change Control form to the PM and COR and all other direct employees proposed for the project. The PM and COR will approve all contractor employees prior to bringing on duty via Contractor Personnel Change Request Form, at any time from date of award to the end of the contract, contractor personnel are no longer available, the VHA will approve the qualifications of proposed replacement personnel and will reject individuals who do not meet the qualifications set forth herein. All contractor employees are subject to immediate removal from performance of this contract when they are involved in a violation of the law, VA security, confidentiality requirements, and/or other disciplinary reasons.

6. Deliverables – Submittals – Schedules:

6.1 Contractor shall submit the following construction documentation and all catalog material to the

COR for approval before a notice to proceed is issued by the Contracting Officer. Submissions shall include:

1. Provide a schedule that demonstrates complete fulfillment of all contract requirements.

The schedule shall include milestone dates, including equipment ordering and delivery dates, activity start and end dates, man-loading estimates, and activity description. The schedule shall be submitted as part of the design and shall be approved prior to receiving the notice to proceed. An updated schedule shall be submitted prior to progress meetings as work progresses.

6.2 Contractor shall submit all permits associated with the construction project prior to receiving notice to proceed. The following submittals shall be approved prior to ordering any equipment:

1. Manufacturer’s complete technical literature for the selected panel, including net peak capacity;

2. Inverter, including required DC voltage and how the proposed PV arrays will operate within the Maximum Power Point (MPP) of the inverter at different cell temperatures using Pensacola weather data.

3. All submittals will be provided to the VA COR electronically and are to be downloaded from the contractor’s managed ftp site.

6.3 Individual panels shall be tested prior to construction on mounts. Record open-circuit voltage and short-circuit current for each panel. Submit these test results to the COR.

6.4 Provide 50% and 100% construction designs for approval. All final construction designs shall be reviewed and approved by the government COR. The drawing submissions will be CAD-based and include specific locations, routings, etc., typical of a construction submission.

6.5 After award Contractor shall submit:

1. Performance and Payment Bonds – Due to VA 10 Calendar Days after award.

2. Proof of Insurance – Due to VA 10 Calendar Days after award.

3. Submit quality control, safety, and environmental plans.

a. Contractor Quality Control Plan (CQCP): The contractor shall develop a quality control plan and shall furnish to VA for review no later than 30 calendar days after the receipt of notice to proceed. The plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be used. VA will consider an interim plan for the first 45 calendar days of operation. Construction will be permitted to begin only after acceptance of the CQCP or acceptance of an interim plan applicable to the particular feature of the work to be started. Work outside of the features of the work included in an accepted interim plan will not be permitted to begin until acceptance of a CQCP or another interim plan containing the additional features of the work to be started. After acceptance of the CQCP, the Contractor shall notify the Contracting Officer’s Representative in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer.

b. Safety Plan: Comprehensive safety plan shall be implemented by the Contractor to eliminate injuries occurring relative to providing the design and construction services for this project. Construction will be permitted to begin only after VA’s acceptance of the Safety Plan. Contractor is responsible for providing enough project lead time to allow for VA review of Safety Plan before acceptance. The Department of Labor OSHA requires that all Contractors involved in construction on VA owned or leased property comply with the Incorporation of General Industry Safety and Health Standards applicable to Construction Work and Technical Amendments, Final Rule 29 CFR Parts 1910 and 1926 as published in the Federal Register Volume 58, No. 124, June 30, 1993. In addition, any Contractor that performs construction type work on any VA project as defined by the Scope of the referenced regulation is required to; (1) Provide and maintain his own protective equipment and devices, etc; and (2) Require all sub-contractors used on site to follow these same provisions in the regulation.

c. Environmental Plan: Comprehensive environmental plan shall be implemented by the Contractor to prevent environmental pollution during, and as result of, construction operations under this contract. Construction will be permitted to begin only after VA’s acceptance of the Environmental Plan. Contractor is responsible for providing enough project lead time to allow for VA review of Safety Plan before acceptance. The plan shall include the identification and resolution of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life or affect other species of importance to human.

6.6 The performance periods and submission schedules for each phase of design are indicated below.

1. Contractor shall submit Preliminary 50% design analysis, drawings, and specifications to the VA for review and approval no more than 90 calendar days after NTP is issued. This submittal will include drawings, outline specifications, design analysis, a design documentation report, quantity and cost estimates, an construction cost estimate, a proposed construction schedule, site plans identifying all right of ways, a complete order of work clause describing the required sequence of construction operations, and other supporting documents.

2. The Contractor shall submit 100% design analysis, drawings, and specifications for the VA review and approval with implementation/rejection of comments provided by the VA during 50% review no more than 45 calendar days after receipt of preliminary design review comments. This submittal will include detailed working drawings and specifications necessary for the effective coordination and efficient execution of the construction work. The final design shall also include a construction contractor submittal register, design analysis, a design documentation report, quantity and cost estimates, an construction cost estimate, a proposed construction schedule, site plans identifying all right-of-way (for construction and perpetual operations), and other supporting documents.

3. The Contractor shall submit final design analysis, drawings, and specifications with implementation/rejection of the VA comments provided during 100% for review and approval, 28 calendar days after receipt of final design review comments. This submittal will include same items that are required for the final design submittal.

6.7 During the construction phase, Contractor shall submit Coordination (Shop) Drawings to the VA for review and approval.

6.8 In addition to the elements mentioned above, the contractor shall submit to the VA

1. Progress reports to the VA on a daily basis.

2. Inspection report.

3. Test reports.

4. Upgraded schedule.

5. Contractor shall provide for review and approval by VA, any stand-by power provisions or partial requirements standards required by Gulf Power (Florida Power and Light) as part of this construction. Provide cost information relative to the agreements and any other equipment that may be required by Gulf Power (Florida Power and Light) and proposed system construction.

6.9 During the completion of the project, the Contractor shall submit

1. Punch-list to the VA for review.

2. Final inspection report.

3. O & M manual.

4. Warranty documents.

6.10 Upon completion of the project, the Contractor Shall Submit

1. Engineering calculations used to determine design characteristics of the PV system, and sizing and selection of system components. Engineering calculations include, but are not limited to, structure, module operating temperature, conductor sizing, and over-current device ratings. Calculations shall be on 8½ inch by 11 inch sheet, suitable for side binding.

2. Detailed drawings of the PV mounting system and how it is integrated to the canopy support structure; submit engineering calculations used to determine the canopy’s structural integrity considering appropriate wind loads.

3. Connection Wiring Diagram: Provide a wiring diagram for complete system construction.

Diagram shall show how components are wired; including but not limited to terminal blocks, wire sizes, wire connections, connection to external devices and ground connections.

09-01-21

00 11 21-1

4. Engineering data and calculations indicating acceptable system load limits are met for each site.

6.11 Upon completion of the construction, the contractor shall demonstrate the performance of the system to the Field Inspector and COR and shall submit the documentation, items and other information listed below.

1. The contractor shall provide all information pertinent to the equipment for preventative maintenance and replacement. Include full product documentation from manufacturer, installer and/or supplier. Data shall be both electronic (PDF, Word and AutoCAD) and hard- copy, on 8 1/2 inch by 11 inch sheet, suitable for side binding. Include 3 copies of the items listed below and other features as recommended by the manufacturer.

a. As-built versions of the submittals and drawings shall be both electronic and hard copy.

b. Construction drawings and field wiring diagrams.

c. Operators manuals for each system component including detailed instructions on how to operate the system, programming and installation instructions, emergency operating procedures, default program values and set points, listing of field programmed variables and set points, equipment wiring diagrams, product model number, with Name, Address and Telephone number of local representative, starting, operating, and shut down procedures. Include normal and emergency shutdown procedures, schedule of maintenance work, if any, recommended cleaning agents and methods, replacement parts list, including internal fuses, and warranty information.

d. Provide a formal 2-hour on-site training session instructing operators at the medical center in the operation and maintenance of the new system, including operation and maintenance of inverters, disconnects and other features as requested by VA. VA shall be permitted to video tape this training for official use.

Contractor shall instruct the VA personnel in removal and installation of panels, including wiring and all connections. At the time of training the Contractor shall furnish, for the equipment specified, operation and maintenance manuals, record drawings and recommended spare parts lists identifying components adequate for competitive supply procurement for operation and maintenance of system. The operation and maintenance manuals shall include maintenance schedules for all equipment.

e. Provide the VA with written instructions and procedures for all components of the system. At the time of training the Contractor shall furnish, for the equipment specified, operation and maintenance manuals, record drawings and recommended spare parts lists identifying components adequate for competitive supply procurement for operation and maintenance of system. The operation and maintenance manuals shall include maintenance schedules for all equipment.

f. Startup report including system and individual panel performance. System and individual panel performance shall be compared to expected performance and shall include at a minimum solar irradiance, DC energy, AC energy, ambient air temperature and PV cell temperature. System performance shall be measured and reported for at least one full day.

g. If the performance monitoring of the constructed array indicates the array is not meeting its required performance predictions it shall be corrected by the Contractor at the Contractor's expense within thirty (30) calendar days of notification.

Following correction, performance monitoring will again be performed until the array meets required performance predictions. Measurements made under actual construction and temperature will be normalized to STC.

00 11 21-2

7. Project Acceptance

Project Acceptance: All submittals and deliverables must be received and approved by the COR before final acceptance of the line item will be made.

A2. Definitions

A. Design-Build (DB) as defined by the US Department of Veterans Affairs

(VA) is the procurement by the Government, under one contract, with one firm or joint venture (JV) for both design and construction services for a specific project.

1. Contracting Officer: The services to be performed under this contract are subject to the general supervision, direction, control and approval of the Contracting Officer.

2. Project Manager: The Contracting Officer's representative responsible for administering contracts under the immediate direction of the Contracting Officer.

3. Resident Engineer: The Contracting Officer's authorized representative at the construction site. When more than one Resident

Engineer is assigned to a construction project one is designated as being in-charge and is called the "Senior Resident Engineer". The

Resident Engineer is responsible for protecting the Government's interest in the execution of the construction contract work. His duties include surveillance of all construction work to assure compliance with the contract documents, interpretation of the contract documents, approval of changed work, approval of all submittals, samples, shop drawings, etc. The Resident Engineer may issue change orders to the Contractor within the limitations set forth in his delegation of authority from the Contracting Officer.

4. Design Build Contract: This term, as used herein, refers to the

Contract(s) to perform the design and construction of the project.

5. Contractor: This term, as used herein, refers to the contractor under this contract or the DB team.

6. AE: This term, as used herein, refers to the Architect-Engineer firm(s)that are a part of the DB team, also referred to as DB/AE.

7. RFP/AE: The firm(s) directly hired by the VA for the preparation of the RFP Documents and to provide other technical assistance to the

VA.

00 11 21-3

B. Selection Procedure - During the review of offers the VA may ask for additional information. The VA may initiate action to award a contract at any point after review of the offers. Therefore, offers should reflect the offeror’s best terms both from a technical and cost standpoint. See FAR 52.215-1, Instructions to Offerors - Competitive

Acquisition (Jan 2017.

C. Tentative Schedule:

Milestone Date

Pre-Solicitation (Step 1) 7/1/2022

Responses Received (Step 1) 7/17/20222

Notification of Viable/Non-Viable Status (Step 1) 7/22/2022

Solicitation Issued (Step 2) 7/22/2022

Pre-Proposal Conference (Step 2) 8/7/2022

Technical Questions Submission Suspense Date 8/14/2022

Proposals Received(Step 2) 8/29/2022

Contract Award(Step 2) 9/22/2022

Notice to Proceed 10/22/2022

Estimated Project Completion 10/23/2022

D. Schedule Objectives - The anticipated completion of this project is 365 days after “Notice to Proceed” (NTP). The proposed schedule may be shorter than this, see Part III, C3, 3c.

A3. Cost Range

The anticipated cost range for this project is between $4,000,000 and

$6,500,000.

A4. Pre-Proposal Conference

The VA has scheduled the following pre-proposal site visit:

Location: Pensacola JACC

Date / Time: TBD

00 11 21-4

All offerors, consultants, subcontractors, manufacturers and suppliers are invited to attend. The following agenda is furnished for this meeting:

1. Open meeting;

2. Review of project and design build method for construction contracting;

3. Specifications, Network analysis system and project phasing;

4. General requirements, Solicitation Documents and Offer Submission

Procedure;

5. Review of "Buy American Act";

6. Questions and answers;

7. Close; and

8. Site walk through – attendance is optional.

* An RSVP must be sent to the contracting officer no later TBD if your company plans to attend. Please include the project title in the subject line of the email, as well as the names of the attendees. No more than three per Offeror.

A6. Selection Criteria and Weightings

A. General proposals will be evaluated and award will be made on the basis of both cost and technical considerations most advantageous to the government as per FAR Part 15. In descending order of importance evaluations will be based on cost, construction management, past performance, schedule and (small disadvantage business participation

*). Responsibility determination will be made in accordance with FAR

9.1, Responsible Prospective Contractors.

B. Technical Evaluations - All technical factors when combined are approximately equal in importance to cost or price. Evaluations will be based on the following technical weightings in descending order of importance:

60% - construction management including corporate project experience, personnel experience, technical/management approach

20% - past performance

10% - schedule

10% - small disadvantaged business participation**

00 11 21-5

C. Cost Proposal - Offerors are advised that if the technical proposals are essentially equal, award will be made on the basis of the lowest cost.

B. PART II - RESPONSIBILITIES

B1. VA Team

A. The VA team is comprised of the VA-PCAC, a COR who will be located at the construction site and VA medical center staff. The coordinator/manager of the VA team will be the COR, who will have

Contracting Officer authority.

B2. Design-Build Team:

A. The DB team includes all J/V partners, consultants and sub-contractors to the one firm. The DB team shall provide Architectural and

Engineering disciplines for the preparation of construction documents, and construction contractor capabilities for construction of the project.

B. If the DB Team A/E and contractor are a J/V (not one and the same firm) engineering and other technical consultants shall be subcontractors of the J/V Architect - not the Design-Build construction contractor or sub-contractors. If the DB Team A/E and contractor are one and the same firm (not a J/V) those consultants shall be subcontractors of DB firm not the construction subcontractors.

C. The RFP documents are intended to define existing conditions, certain required items, and design parameters to be included in the project. It is the DB Team’s responsibility to complete the documents and construction in a manner consistent with the intent of the RFP documents within the required time period (contract length).

C. PART III - PROPOSAL REQUIREMENTS

C1. General

A. Proposals shall be based on solicitation documents issued for RFP.

Proposals will be in the format stipulated elsewhere in this section.

B. Proposals shall be received before 8/29/2022. There will be no public opening of the proposals.

C. Submit sealed offers to:

1. For US Postal Service Deliveries:

(Contracting officer name) – Contract Specialist

00 11 21-6

Department of Veterans Affairs

Program Contracting Activity Central (VA-PCAC)

6150 Oaktree Bvld Suite 300

Independence, OH 44131

2. For Commercial Delivery Services (Monday- Friday, 7:30 am to 4:30

PM):

(Contracting officer name) – Contract Specialist

Department of Veterans Affairs

Program Contracting Activity Central (VA-PCAC)

6150 Oaktree Bvld Suite 300

Independence, OH 44131

D. Technical and Cost sections of the Offers proposals will be evaluated independently. Offeror shall separately bind each section. Each section must therefore be labeled with the Offeror's organization, business address, and VA Project Number. Offerors shall affix their names and return addresses on their envelope/packaging. E. Carefully follow

“Instructions, Conditions, and Notices to Offerors”. Optional Form 308

(Solicitation and Offer – Negotiated Acquisition) shall be used for submitting cost offers. Submit original and four copies of Optional

Form 308 with a bid guarantee as stipulated in the Section

“Instructions, Conditions, and Notices to Offerors”:

1. Offeror shall submit separate prices for any Bid Items indicated on the RFP Offer and award;

2. Offeror shall include all required Representations and

Certifications; and acknowledge receiving amendments by number.

C2. Proposal Revisions (FAR 52.215-1)

A. If determined to be necessary, proposal revisions will be requested from the proposals received. The Contracting Officer will identify those offerors, whose proposals are within the competitive range, considering the selection criteria identified in this section.

Negotiations may be conducted with those offerors falling within the competitive range, after which proposal revisions will be requested.

00 11 21-7

Those selected as within the competitive range will be given 7 calendar days to prepare their proposal revisions. Sealed proposal revisions will be submitted as per Part III.C1.C, above, except as noted below and will be due at a time and place to be determined.

B. Offerors submitting proposal revisions will not be requested to re-submit any documents which are unchanged from their initial proposals.

They should provide necessary changes to individual paragraphs, as briefly as possible, together with a table of contents, that clarifies where within the initial proposal the additional information or changed documents would be placed. Proposal revisions shall include a completed

Optional Form 308 (Solicitation and Offer – Negotiated Acquisition) and

Optional Form 309 Amendment of Solicitation that acknowledges receiving all amendments, by number. A new bid bond shall be submitted only if the final proposal revisions offeror’s price proposal is greater than it’s initial price proposal.

C3. Technical Proposal Requirements

A. The proposal shall address the following evaluation factors. Evaluation scores will be based, in order of importance, upon the criteria in Part

I, A6:

1. Construction Management:

a. Corporate Project Experience - The Offeror shall demonstrate corporate experience with no more than three projects completed within the last five years by a Design Build contract (Design

Build as defined by the VA, see article A1.2) and/or contract similar in size and scope to this project. Scoring will be more favorable if both criteria are met. In describing project design and construction experience, provide the following information:

1) Project title, location and brief description including the building use (Medical Facility etc) and contracting method

(design build, design bid construct, CM at risk etc).

2) Project owner and name and telephone number of owner’s contact person.

3) Project Design Architect and Engineers (consultants if utilized) and name and telephone number of contact person(s).

Note each firm and employee also proposed for this solicitation.

4) Project Prime Contractor and Major Subcontractors and name and telephone number of contact person(s). Note each firm and

00 11 21-8 managing persons (project manager/superintendent/foreman as the case may be) also proposed for this solicitation.

5) Project Statistics including start and completion dates

(original vs. actual) for design and construction; cost (with brief explanation of what is included in the cost); square footage; foundation type; number of levels; and any awards

(prizes) received.

b. Project Personnel Experience (Specialized experience and technical competence). The Offeror shall demonstrate the relevant experience of key project personnel.

1) Biographical data shall include the following:

a) Name of individual.

b) Company employed by.

c) Company position title.

d) Years with the company.

e) Describe work experience with projects that; were completed by the design build process, were medical facilities and the company (by name) they worked for when involved in the project.

f) An indication of which (if any) projects submitted under

Corporate Experience (above) the individual participated in and what the individuals responsibility was for that project.

g) An indication of which other individuals submitted under

Project Personnel Experience this individual has worked with and the project they worked on together, noting if that project has been submitted under Corporate Experience

(above).

h) Position that the individual will hold in regard to this contract/project team, description of duties and what percentage of the individual’s time would be committed to the project during both the design and construction phases.

i) Describe job related educational experience including degrees, certificates etc. and granting institutions.

2) Supply this biographical data for key personnel for at least the following: (Note if one individual is proposed for more than one position listed):

a) Overall Project Manager.

00 11 21-9

b) (Architect) Design Project Manager.

c) Construction Project Manager.

d) Architect/Engineer Field Representative.

c. Technical/Management Approach - The Offeror shall demonstrate the following, relevant to the subject procurement.

1) Project Delivery Philosophy - Include expectation statements concerning:

a) Elements for Successful Partnering: Communication, Commitment and Conflict Resolution.

b) Proposed Design Period Peer Review technical/administrative by VA & RFP AE)

2) Quality Assurance/Quality Control Plan

3) Project Organizational Chart and Narrative - Include team members submitted under Project Personnel Experience above.

Clearly describe the prime responsible firm (or firms if a

J/V) and individuals as well as the roles and responsibilities of individuals proposed as consultants and sub-contractors.

Provide a list all consultants and all proposed major subcontractors, including telephone number, address, and name of contact.

4) Capability to perform:

a) Provide the offeror's total bonding capacity, current available bonding capacity and expected available capacity in 1999.

b) Provide the offeror's current workload and availability of adequate staff listed under Project Personnel Experience to manage the project. Include project schedules for current and pending projects, as well as the anticipated impact of this project on those schedules and staffing plans.

5) The Offeror shall describe in a written narrative the plan for phasing the work so that the facility remains operational while utilities and access roadways are realigned. The narrative will also detail how the contractor intends to prepare the site, disassemble, relocate, reassemble, and reactivate utility services to the facility within any specified time limits.

6) Offeror shall clarify its intended uses of the portions of the site indicated to be available to the contractor elsewhere in

00 11 21-10 this RFP for materials staging, temporary trailer offices, employee parking, and other activities as shown in the design solution material.

2. Past Performance (Client Satisfaction) - Contact persons supplied for projects submitted under Construction Management -Corporate

Project Experience above will be contacted by the Evaluation Panel.

These contact's responses will be scored based on the following elements with projects participated in by the Prime (Construction

Contractor and Architect firm) being weighted more heavily than projects participated in by consultants, sub-contractors and individuals.

a. Client Overall Satisfaction with Project: Contact persons will be asked "does the project fulfill the requirements of the clients stated function, does the project require unexpected maintenance activity, and have latent defects been found?"

b. Client Overall Satisfaction with Design Build Period Services:

Contact persons will be asked "Was the team's response time to clients questions acceptable? Was the staffing level consistent with the project size and complexity? Was communication of schedule and problem issues adequate and consistent? Was there an established problem solving routine? Would the client like to use this firm again?"

3. Schedule:

a. The progress schedule will be in a time scaled bar graph format.

The horizontal axis will be scaled for time beginning with the

Notice to Proceed and concluding with contract completion. The vertical axis will show the milestones and major portions of the contract work. All schedule items will show a start date and a completion date. The detailed schedule, will indicate specific tasks with dates for each step of the process including:

1) Design…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .