JACC solar ICRA Pre_Construction.pdf

PDF 171 KB Posted

Attached to
520-18-119 Install Photovoltaic Array, JACC Federal contract opportunity
Solicitation number
36C25623R0039
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document is an Infection Control Risk Assessment (ICRA) permit for the construction project "Solar/PV Awning Project" at the Joint Ambulatory Care Clinic (JACC). The permit covers installation of a photovoltaic array by contractor TBD with an estimated duration of TBD. It classifies the risk level of construction activities and outlines infection control requirements including isolating HVAC systems, maintaining negative air pressure, containing construction waste, and cleaning procedures. Additional safety and infection control signoffs are required before work commences in negative pressure rooms housing TB patients.

The related federal contract opportunity is a solicitation from the Department of Veterans Affairs for project 520-18-119 to install a photovoltaic array at JACC in Pensacola, Florida. The solicitation number is 36C25623R0039 and details are provided for the required construction services.

View the file

Other files for this federal contract opportunity

Other files attached to 520-18-119 Install Photovoltaic Array, JACC, newest first.
File Type Posted
VOL 2 BINDER.pdf PDF
36C25623R0039 RFIs main.docx DOCX document
36C25623R0039 0002.pdf PDF
VOL 3 BINDER.pdf PDF
VOL 1 BINDER.pdf PDF
36C25623R0039 0001.docx DOCX document
Drawings.pdf PDF
DB-ATTACH ATTACHMENT I - RELEASE OF CLAIMS.docx DOCX document
36C25623R0039 Solicitation 12-29-2022.pdf PDF
36C25623R0039 EXHIBIT F.docx DOCX document
WD FL20220203 Mod 3 Dtd 9-01-2022.txt TXT text file
VHA Supplemental Contract Requirements for Combatting COVID-19.docx DOCX document
SOW_JACC SOLAR PV rev 10-5-22.docx DOCX document
Specs.pdf PDF
36C25623R0039 EXHIBIT E.docx DOCX document
36C25623R0039 EXHIBIT D.docx DOCX document
36C25623R0039 EXHIBIT B.docx DOCX document
36C25623R0039 EXHIBIT A.docx DOCX document
36C25623R0039 EXHIBIT C.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Adapted with permission V Kennedy, B Barnard, St Luke Episcopal Hospital, Houston TX, Forms modified and provided courtesy of Judene Bartley, ECSI Inc Beverly Hills MI 2002 Reviewed 2005

Infection Control Construction Permit-ICRA Project Title: Solar/PV Awning Project Permit No:520-22-119

Location of Construction: JACC Project Start Date: TBD

Project Coordinator/COTR: Logan Bazo Estimated Duration: TBD

Contractor Performing Work: TBD Permit Expiration Date: TBD

Supervisor: Telephone:

YES NO CONSTRUCTION ACTIVITY YES NO INFECTION CONTROL RISK GROUP

TYPE A: Inspection, non-invasive activity X GROUP 1: Low Risk

X TYPE B: Small scale, short duration, moderate to high levels

GROUP 2: Medium Risk

TYPE C: Activity generates moderate to high levels of dust, requires greater 1 work shift for completion

GROUP 3: Medium/High Risk

TYPE D: Major duration and construction activities

Requiring consecutive work shifts

GROUP 4: Highest Risk

CLASS I 1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace any ceiling tile displaced for visual inspection.

3. Minor Demolition for Remodeling

CLASS II

1/4/2022

TSC

1. Provides active means to prevent air-borne dust from dispersing into atmosphere

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Wipe surfaces with disinfectant.

6. Contain construction waste before transport in tightly covered containers.

7. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

8. Place dust mat at entrance and exit of work area.

9. Remove or isolate HVAC system in areas where work is being performed.

CLASS III

1. Obtain infection control permit before construction begins.

2. Isolate HVAC system in area where work is being done to prevent contamination of the duct system.

3. Complete all critical barriers or implement control cube method before construction begins.

6. Vacuum work with HEPA filtered vacuums.

7. Wet mop with disinfectant

8. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

9. Contain construction waste before transport in

Date 4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

5. Do not remove barriers from work area until complete project is thoroughly cleaned by Facilities Management Service.

tightly covered containers.

10. Cover transport receptacles or carts. Tape covering.

11. Remove or isolate HVAC system in areas where work is being performed/

Initial

CLASS IV

1. Obtain infection control permit before construction begins.

2. Isolate HVAC system in area where work is being done to prevent contamination of duct system.

3. Complete all critical barriers or implement control cube method before construction begins.

4. Maintain negative air pressure within work site utilizing

HEPA equipped air filtration units.

5. Seal holes, pipes, conduits, and punctures appropriately.

6. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.

7. All personnel entering work site are required to wear shoe covers

8. Do not remove barriers from work area until completed project is thoroughly cleaned by the Environmental

Service Dept.

9. Vacuum work area with HEPA filtered vacuums.

10. Wet mop with disinfectant.

11. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

12. Contain construction waste before transport in tightly covered containers.

13. Cover transport receptacles or carts. Tape covering.

14. Remove or isolate HVAC system in areas where work is being performed.

Date

Initial

Construction taking place in negative pressure rooms where TB patients are housed or work with exhaust to these rooms? ___Yes _X__No

If yes, the contractor must provide written certification that all employees assigned to the work site have a negative TB screening within 90 days prior to assignment to work area.

Additional Requirements:

Infection Control: Tanya Chandler COTR:

Safety:

2022-01-04T15:10:30-0600
Logan S Bazo 3574202