This is a specification document for the Police Department Relocation project at College of Coastal Georgia (CCGA-2310), issued by the Board of Regents of the University System of Georgia. The project involves renovations to the existing Plant Operations/Facilities Building located at One College Drive, Brunswick, Georgia 31520 to accommodate the relocation of the Police Department. The scope includes selective demolition, installation of metal door frames, wood doors, finish hardware, non-load bearing metal studs, gypsum board, suspended acoustical ceiling systems, resilient flooring, carpet tiles, paint, interior signage, HVAC systems, plumbing, fire alarm systems, lighting, data, and power infrastructure. Work hours allow for 24/7 operations except for disruptive noise-producing activities, which must occur between 7:30 AM and 11:00 PM Monday through Friday. The contractor must coordinate extensively with the Owner's representative and maintain precautionary measures to protect building occupants since the building will remain fully or partially occupied throughout the project duration. The specifications include detailed requirements for temporary facilities, waste management, environmental controls, and dust containment to minimize disruption to campus operations.

The contract includes three deductive alternates that bidders must address: deletion of Roof Top Unit RTU-4 with reuse of existing equipment, deletion of solid surface counter and countertop at the Reception/Lobby wall, and deletion of hollow metal door frames and wood doors with hardware to be provided by the Owner for contractor installation. The contractor is responsible for providing dumpsters, temporary utilities connection equipment, and maintaining hazardous materials documentation through Material Safety Data Sheets prior to use. Payment procedures require submission of a Schedule of Values broken down by specification section, with updated schedules accompanying each Application for Payment. The contractor must provide comprehensive closeout documentation including marked-up shop drawings, operation and maintenance manuals, manufacturer warranties, test and balance reports for HVAC systems, and extra materials equal to five percent of installed quantities. All work must comply with OSHA requirements, Georgia environmental laws, and fire code standards, with the general contractor providing one-year warranties on all work and extended warranties on specific items such as cylindrical locksets (seven years), exit devices (five years), and door closers (ten years).

Text of this file

Police Department Relocation

College of Coastal Georgia

CCGA-2310

Board of Regents of the University System of Georgia

February 28, 2023

Ramsay Sherrill Architects PO Box 8081

Savannah, GA 31412

TABLE OF CONTENTS - 1

TABLE OF CONTENTS

SECTION

NUMBER

SECTION TITLE

DESIGN-BID-BUILD CONSTRUCTION CONTRACT

Form of Contract Bid Requirements General Conditions Supplemental General Conditions

01 10 00 SUMMARY

01 20 00 PRICE AND PAYMENT

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 50 00 TEMPORARY FACILITIES AND CONTROLS

01 60 00 PRODUCT REQUIREMENTS

01 70 00 EXECUTION REQUIREMENTS

02 41 19 SELECT DEMOLITION

09 21 16 GYPSUM BOARD ASSEMBLIES

08 HOLLOW METAL FRAMES

08 WOOD DOORS

08 FINISH HARDWARE

09 53 13 SUSPENDED ACOUSTICAL PANEL CEILING SYSTEMS

09 65 13 RESILIENT FLOORING AND ACCESSORIES

09 65 19 RESILIENT TILE FLOORING

09 68 13 CARPET TILES

09 91 00 PAINT

10 51 13 METAL EVIDENCE LOCKERS

23 05 10 GENERAL MECHANICAL REQUIREMENTS

23 05 13 MOTORS FOR HVAC EQUIPMENT

23 05 14 VARIABLE FREQUENCY CONTROLLERS

23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC

23 07 13 DUCT INSULATION

Renovation of the Locker Rooms in the Coffin Building July 31, 2013

CCGA-1252

TABLE OF CONTENTS - 2

23 07 19 HVAC PIPING INSULATION

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 94 HVAC SEQUENCE OF OPERATION

23 31 00 HVAC DUCTS AND CASINGS

23 33 00 AIR DUCT ACCESSORIES

23 37 00 AIR DUCT AND INLETS

23 40 00 HVAC AIR CLEANING DEVICES

23 74 23 PACKAGED ROOF TOP AIR CONDITIONING UNITS

23 81 30 DUCTLESS SPLIT SYSTEM AIR CONDITIONERS

26 05 10 GENERAL ELECTRICAL REQUIREMENTS

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 34 CONDUIT

26 05 37 BOXES

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 22 00 LOW-VOLTAGE TRANSFORMERS

26 24 16 PANELBOARDS

26 24 17 SURGE PROTECTIVE DEVICES (SPDS)

26 27 17 EQUIPMENT WIRING

26 27 26 WIRING DEVICES

26 28 13 FUSES

26 28 18 ENCLOSED SWITCHES

26 32 13 ENGINE GENERATORS

26 36 00 TRANSFER SWITCHES

26 51 00 INTERIOR LIGHTING

26 52 00 SENSOR LIGHTING CONTROLS

28 31 00 FIRE ALARM SYSTEM

Police Department Relocation February 28, 2023

SUMMARY 01 10 00-1

SECTION 01 10 00 - SUMMARY

PART 1 GENERAL

1.1 SUMMARY OF WORK

A. Project Identification:

1. Project: Police Department Relocation

College of Coastal Georgia

CCGA-2310

2. Location: Plant Operations/Facilities Building College of Coastal Georgia One College Drive

Brunswick, Georgia 31520

3. Owner: Board of Regents of the University System of Georgia Office of Facilities 270 Washington Street, S.W.

Atlanta, Georgia 30334

4. Owner’s Representative:

Mr. Paul Melchor Director of Plant Operations College of Coastal Georgia

One College Drive Brunswick, Georgia 31520

912- 279-5830

5. Architect: Ramsay Sherrill Architects 119 A East Charlton Street Savannah, Georgia 31401 912-238-5906 Sandra L. Sherrill RA

B. The Work consist of the following:

1. Scope includes but is not limited to the following:

a. Renovations to the existing Plant Operations/Facilities Building as need for the relocation of the Police Department.

2. Systems include but are not limited to the following: selective demolition, metal door frames, wood doors, finish hardware, non-load bearing metal studs, gypsum board, suspended acoustical ceiling systems, resilient flooring and accessories, carpet tiles, paint, interior signage, HVAC, plumbing, Fire Alarm, lighting, data and power.

3. Deductive Alternates: There are several deductive alternates noted in Section 01 20 00, Price and Payment.

1.2 SCHEDULE AND WORK RESTRICTIONS

A. Work Hours:

1. Work (other than disruptive noise producing activities) may occur 24/7.

01 10 00-2 SUMMARY

2. The Contractor shall inform the Owner’s representative of after-hours work scheduled.

B. Noise:

1. Disruptive, noise producing activities:

a. Disruptive noises and use of motorized equipment shall not interfere with use of the building.

b. The Contractor shall avoid operating noisy equipment or generating excessive noise that will interrupt or interfere with the normal operation of the Campus and the buildings on the campus. The Contractor shall conscientiously strive to maintain minimum noise levels from construction operations and from his workers during normal working hours 7:30 AM to 11:00 PM daily, Monday through Friday.

2. The Campus reserves the right to limit or temporarily stop the Contractor’s activities if noise interferes with the building activities.

C. Site Restrictions:

1. The Plant Operations/Facility Building and adjacent buildings will be fully or partially occupied for the length of the project.

2. The contractor must take precautionary measures to protect building occupants from construction areas at all times.

3. The Contractor shall restrict site activities and vehicle movement to the areas designated.

D. Coordination:

1. Additional projects by other contractors and by the Owner may be ongoing elsewhere on campus.

1.3 EXISTING BUILDING USE AND ACCESS

A. Building Use:

1. The Contractor is hereby made aware that the building and surrounding campus facilities will remain occupied.

2. Buildings will be fully or partially occupied for the length of the project. The contractor must take precautionary measures to protect building occupants from construction areas at all times.

3. Exterior walkways and other exit-ways shall remain in use and kept passable and free of debris and stored material at all times.

4. Interior exit corridors shall remain in use and shall be kept passable and free of debris. No materials or trash shall be stored in the corridor.

5. All parking areas, walkways, and streets shall remain usable by tenants except as otherwise arranged with the University’s representative. When work is not physically being performed, these areas shall be free of material, equipment and debris of the Contractor.

1.4 ADDITIONAL CONDITIONS

A. ADDITIONAL ACTS AND EXECUTIVE ARTICLES:

1. The Non-Discrimination Clause contained in Section 202, Executive Order 11375 relative to Equal Employment Opportunity for all persons without regard to race, color, religion, sex or national origin and the implementing rules and regulations described by the Secretary of Labor are incorporated.

2. Williams Steiger Occupational Safety and Health Act of 1970.

3. Georgia Water Quality Act: O.C.G.A. Sec. 12-5-20.

4. Georgia Comprehensive Solid Waste Management Act: O.C.G.A. Sec. 12-8-20.

SUMMARY 01 10 00-3

5. Georgia Air Quality Act: O.C.G.A. Sec. 12-9-1.

6. Section 45-1 of the Official Code of Georgia requires that any vendor of contractor doing business with Armstrong Atlantic State University who, directly or through another, makes a gift to one or more public employees exceeding in the aggregate $250.00 in value during any calendar year shall file a disclosure report with the Georgia State Ethics Commission

B. FIVE YEAR BOND ON ROOF AND WALLS: The Five Year Bond on Roofs and Walls will not be required.

C. INDOOR AIR QUALITY: The existing building will be in use and occupied during construction.

Contractor shall schedule work and provide temporary ventilation and/or isolation to insure that fumes from welding, other construction tasks, and out-gassing from construction materials do not migrate to occupied areas.

D. EXISTING FACILITIES TO BE KEPT IN OPERATION: The Contractor is hereby made aware that the building will remain occupied.

1. Corridors, stairs, and other exit-ways shall remain in use and kept passable and free of debris and stored material at all times.

2. All parking areas, walkways, and streets shall remain usable by tenants except as otherwise arranged with the College=s representative. When work is not physically being performed, these areas shall be free of material, equipment and debris of the Contractor.

3. The contractor shall avoid operating noisy equipment or generating excessive noise that will interrupt or interfere with the normal operation of the Campus and the buildings on the campus. The Contractor shall conscientiously strive to maintain minimum noise levels from construction operations and from his workers in and around administrative and classroom facilities during normal working hours 7:30 AM to 11:00 PM daily, Monday through Friday.

E. SECURITY OF BUILDINGS AND WORK SITE: The University will furnish access to the buildings for use by the Contractor. The Contractor shall be responsible for keeping the building locked and secured when not occupied by the University.

F. ACCESS TO SITE BY PERSONNEL OF UNIVERSITY:

1. The contractor agrees that the mechanics, electricians and maintenance personnel and sub-contractors of the lessee (Armstrong Atlantic State University) may enter onto the site during the progress of the work for the purpose of maintenance on existing facilities.

2. The contractor shall have the right to exclude from the site, any mechanic, electrician, or maintenance personnel who undertake to enter without a hard hat or who violates any of the safety regulations imposed by the Department of Labor, Occupation and Safety Health Act (OSHA), by the contractor, by law, or by the State Commissioner of Labor.

G. ASBESTOS CONTAINING MATERIALS: The Contractor shall not install asbestos containing materials. Any materials installed by the Contractor that are found to contain asbestos in any form or quantity shall be removed and replaced with materials that do not contain asbestos.

Replacement materials and labor shall be at the Contractors expense.

H. HAZARDOUS MATERIALS:

1. Material Safety Data Systems (MSDS): MSDS for all products to be utilized on the project shall be submitted to the HMC prior to performing the work. These include, but are not limited to, cleaning chemicals, caulk, sealants, paint, etc. MSDS sheets shall be submitted and approved by the HMC prior to the corresponding material being brought on to the campus.

2. Volatile Chemical Storage: Chemicals shall be properly stored at all times unless they are being used. Volatile chemicals shall be removed from the building when construction is not in

01 10 00-4 SUMMARY

process or be stored in rated cabinets.

I. EXISTING CONDITIONS: The Contractor, in undertaking the work under this contract, is assumed to have visited the premises and to have taken into consideration all conditions which might affect his work. No consideration will be given any claim based on lack of knowledge of existing conditions except where the contract documents make definite provisions for adjustment of cost or extension of time due to existing conditions which cannot be readily ascertained.

J. MEASUREMENTS AND DIMENSIONS: Before ordering material or doing work which is dependent upon coordination with building conditions, the Contractor shall verify all dimensions, elevations, grades and pitch by taking measurements at the building and shall be responsible for the correctness of same. No consideration will be given to any claim based on differences between the actual dimensions and those indicated on the drawings. Any discrepancies between the drawings and/or the specifications and the existing conditions shall be referred to the Engineer for additional instructions before any work affected thereby is begun.

K. OWNER’S RIGHT TO NEGOTIATE WITH THE LOWEST BIDDER: In the event all responsive and responsible bids are in excess of the budget, the Owner, in its sole and absolute discretion and in addition to the rights set forth above, reserves the right either to (i) supplement the budget with additional funds to permit award to the lowest responsive and responsible bid, or (ii) to negotiate with the lowest responsive and responsible bidder (after taking all deductive alternates) only for the purpose of making changes to the Project that will result in a cost to the Owner that is within the budget, as it may be amended.

PART 2 PRODUCTS (not used)

PART 3 EXECUTION (not used)

END OF SECTION

PRICE AND PAYMENT PROCEDURES 01 20 00-1

SECTION 01 20 00 - PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

A. This section outlines procedures for the following:

1. Deductive Alternates

2. Contract Modification

3. Field Orders

4. Basic Payment Procedures

B. Related Sections include the following:

1. Section 01 60 00, Product Requirements

1.2 DEDUCTIVE ALTERNATES

A. An alternate is an amount proposed by bidders and stated on the Bid Form for certain work that may be added to or deducted from the Base Bid amount if the Owner accepts a change in either the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.

B. The credit for each alternate is the net deduction from the Contract Sum to incorporate the alternate into the Work. No other adjustments are made to the Contract Sum.

C. All alternates are deductive and must be bid on. Deductive Alternates will be selected in the order in which they appear on the Bid Form and as listed below.

D. List of Deductive Alternates:

1. Deductive Alternate 1: Delete Roof Top Unit RTU-4 from the scope of work. The existing roof top unit shall be reused. All work associated with the RTU shall remain in the scope, only the actual replacement of the unit shall be removed (for future replacement).

2. Deductive Alternate 2: Delete the solid surface counter and countertop at the Reception/Lobby wall. The fixed glass is to remain.

3. Deductive Alternate 3: Delete the purchase of hollow metal door frames, wood doors and finish hardware from the scope. HM door frames, wood doors and finish hardware will be provided by the Owner to be installed by the Contractor.

1.3 CONTRACT MODIFICATION PROCEDURES

A. Upon the Owner's approval of a proposal from the Contractor, submitted either in response to a Proposal Request issued by the Architect or as a request for change from the Contractor, the Architect will issue a Change Order, for all changes to the Contract Sum or Contract Time.

B. The Contractor should provide the following back-up documentation for each Proposal Request which will be used as the required back-up documentation for the Change Order. See the General Conditions of the Contract for additional information.

1. A memorandum showing the cost breakdown of labor and materials as prepared by the contractor for each part of the change order, on Contractor’s letterhead. Provide material quantities for each item of work. Do not provide one lump sum cost - an itemized breakdown for each item of work must be provided.

2. If work is to be done by sub-contractors, provide sub-contractor’s itemized cost breakdown of labor and materials for each item.

01 20 00-2 PRICE AND PAYMENT PROCEDURES

3. Break out and separate items of work for each sub-contractor and for work done by Contractor’s workforce, showing different O&P percentages for each.

4. Separate items of work showing credits for items that will be deleted and are no longer in the scope and for all items to be added to the scope.

5. Show additional time (if any) needed for each work item.

1.4 FIELD ORDERS

A. Minor changes in the work and clarifications to the contract documents which do not involve changes in the contract sum or the contract time will be authorized and documented by the Architect by means of a Field Order.

1.5 PAYMENT PROCEDURES

A. Schedule of Values: Submit a Schedule of Values which breaks down the Contract Sum into at least one line item for each Specification Section. Correlate the Schedule of Values with the Contractor's Construction Schedule.

1. Submit an updated Schedule of Values with each Application for Payment.

2. Use the schedule breakdown form (included in the General Conditions, Section 7) as part of the Application for Payment. AIA Document G702/703 may be used in lieu of the provided form.

B. Application for Payment: Use the Application for Payment form provided in the General Conditions (Section 7, Forms) in accordance with the schedule established in the Agreement.

The form

1. Submit four hard copies of each Application for Payment and all backup information to the

Owner.

2. Use the Change Order Summary form (included in the General Conditions, Section 7) as part of the Application for Payment if change orders have been issued.

1.6 PROJECT SCHEDULE

A. Submit an updated Project Schedule within five days of the date established for Commencement of the Work and with each subsequent Application for Payment.

PART 2 PRODUCTS (not applicable)

PART 3 EXECUTION (not applicable)

ADMINISTRATIVE REQUIREMENTS 01 30 00-1

SECTION 01 30 00 - ADMINISTRATIVE REQUIREMENTS

1.1 SUMMARY

A. This section specifies work for administrative requirements. It includes, but is not limited to the following.

1. Progress meetings

2. Construction Schedule

3. Pre-Construction Conference

4. Submittal Procedures

1.2 PROJECT MANAGEMENT AND COORDINATION

A. Verify information shown on Drawings, in relation to property survey and existing benchmarks, before laying out the Work.

1. Field verify all dimensions before beginning the Work. Notify the Owner immediately if dimensions differ from contract documents.

2. Lay out all new partitions prior to start of work. Notify the Owner immediately if dimensions differ from contract documents.

3. Verify information shown on Drawings and Specifications. Coordinate the scope of work between the drawings and specifications. Coordinate the scope of work between individual disciplines and services.

B. Progress meetings will be held at Project site at a regular interval agreed upon by all parties involved. Owner, Contractor, and each subcontractor or other entity concerned with current progress or involved with planning or coordination of future activities, shall attend.

1. Minutes of each meeting will be prepared by General Contractor, and distributed to all parties present.

C. All correspondence including submittals, pay applications, RFIs and Change Order Proposals shall be delivered to the Owner’s Representative.

1.3 CONSTRUCTION SCHEDULE

A. Prepare a construction schedule for the entire project length. Provide a separate line item for each activity (item of work). Use same breakdown of Work indicated in the Schedule of Values.

A horizontal line bar chart is acceptable for the schedule.

1. Submit within five days of the date established for Commencement of the Work.

2. Indicate Substantial Completion and allow time for procedures necessary for certifying

Substantial Completion.

3. Schedule Distribution: Distribute copies to Owner, subcontractors, and parties required to comply with dates.

1.4 PRE-CONSTRUCTION CONFERENCE

A. Prior to the start of any demolition or construction, the Contractor is to arrange a meeting with the Owner’s representative at the site. The project location will be visited and the following items will be discussed.

01 30 00-2 ADMINISTRATIVE REQUIREMENTS

1. Inspection of existing conditions:

a. During the course of the joint inspection, the three parties to the inspection shall prepare a schedule or list, identifying and showing the existing conditions. An executed and dated original shall be filed with the Contractor and Director of Plant Operations.

b. It is agreed that the preparation of the schedule is for the benefit of the Contractor and is intended to enable him to have the protection afforded by having a record of such existing damage as is visually ascertainable. The Contractor shall have no responsibility to repair damage which shall appear on the aforementioned schedule; nor shall he be responsible for repairing any existing damage which was ascertainable by visual inspection or which was not the result of negligence on his part.

c. The condition of the surrounding building and project area will be examined. Exterior conditions surrounding the building including landscaping and pavement will be reviewed and documented. Those surrounding surfaces or finish conditions which have been damaged due to construction or demolition for the project will be corrected by the Contractor at no charge to the Owner.

d. Dated photographs showing adjacent materials and finishes are suggested. Provide copies of dated documentation to the Owner and Architect prior to the start of any work.

2. The location of any materials storage or trailers will be determined.

3. Location of Contractor’s dumpster(s) and entrance to and from the site will be determined.

4. Verification of existing materials to be removed including landscaping and pavement.

B. Contractor to provide the following at the meeting:

1. List of emergency numbers.

2. List of sub-contractors.

3. Project schedule(s).

1.5 SUBMITTAL PROCEDURES

A. Coordinate submittal preparation with construction schedule, fabrication lead-times, other submittals, and other activities that require sequential operations. Allow ten working days for review of submittals, excluding delivery time to and from the contractor.

1. No extension of Contract Time will be authorized due to failure to transmit submittals in time to permit processing sufficiently in advance of when materials are required in the Work.

2. Submittals are to be delivered to the Owner. Owner will not accept submittals from sources other than the Contractor.

3. Brochures with photographs are not acceptable in lieu of samples when requested.

B. Prepare submittals with the following information:

1. Project name.

2. Date.

3. Name and address of Contractor.

4. Name and address of subcontractor or supplier.

5. Number and title of appropriate Specification Section.

6. Contractor's certification that materials comply with specified requirements.

C. Shop Drawings: Submit newly prepared information drawn to scale. Indicate deviations from

Contract Documents. Do not reproduce Contract Documents or copy standard information.

Submit on sheets at least 8-1/2 by 11 inches (215 by 280 mm) but no larger than 30 by 42 inches

(762 by 1067 mm). Include the following:

ADMINISTRATIVE REQUIREMENTS 01 30 00-3

1. Dimensions, profiles, methods of attachment, coordination with adjoining work, large scale details, and other information, as appropriate for the Work.

2. Identification of products and materials.

3. Notation of coordination requirements.

4. Notation of dimensions established by field measurement.

D. Owner will review each submittal, mark as appropriate to indicate action taken, and return copies less those retained. Compliance with specified requirements remains Contractor's responsibility.

E. Indicate special utility and electrical characteristics, utility connection requirements and location of utility outlets for service for functional equipment.

1.6 NOTIFICATION TO UNIVERSITY DPO:

A. When the Contractor’s representative visits the job site after the final inspection to perform specific work to correct a deficiency, the Contractor shall notify the University Director of Plant

Operations (DPO) not less than 48 hours prior to the date on which they will visit the site, except under an emergency condition.

B. The Contractor shall visit the designated office of the University DPO to notify the DPO that the

Contractor is on the site prior to visit, thereby enabling the University DPO representative to accompany the Contractor, should they so desire while the Contractor is on the site.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

TEMPORARY FACILITIES 01 50 00-1

SECTION 01 50 00 – TEMPORARY FACILITIES

A. This Section specifies requirements for temporary services and facilities, including the following.

1. Temporary utilities

2. Temporary construction and support facilities

3. Trash and debris removal

4. Vehicular access and parking

5. Temporary security and protection

6. Environmental controls

7. Temporary dust control

8. Project identification

9. Termination and removal of temporary facilities

1.2 SECTION REQUIREMENTS

A. Standards: Comply with NFPA 241, "Standard for Safeguarding Construction, Alterations, and

Demolition Operations"; ANSI A10 Series standards for "Safety Requirements for Construction and Demolition"; and NECA Electrical Design Library's "Temporary Electrical Facilities."

B. Electrical Service: Comply with NEMA, NECA, and UL standards and regulations for temporary electric service. Install service in compliance with NFPA 70.

PART 2 PRODUCTS

2.1 MATERIALS

A. General: Provide new materials, unless prior approval from the Architect has been obtained.

PART 3 EXECUTION

3.1 TEMPORARY UTILITIES

A. The Owner reserves the right to monitor use of existing utilities. It is the Contractor’s obligation to be responsible with the use of existing utilities. Should there be continued excessive consumption, the Owner reserves the right to prohibit further use of existing utilities and the responsibility for providing utilities will be the Contractors.

B. Electrical service: Owner agrees to provide, at no cost to the Contractor, 120 VAC electrical service at the project site. The Contractor is required to provide connection, drop cords and any other equipment necessary and is required to repair or replace any portion of the Owner’s electrical system damaged or broken.

C. Water service: Owner agrees to provide, at no cost to the Contractor, water service at the project site. The Contractor is required to provide connection, hoses and any other equipment necessary. Contractor is required to repair or replace any portion of the Owner’s water supply system damaged or broken.

01 50 00-2 TEMPORARY FACILITIES

1. Contractor is to limit the washing of brushes and equipment to the exterior of the buildings at hose bibbs or other areas as directed by the Owner. Thoroughly wash and clean the area eliminating all residue. Return damaged landscaped areas to their original condition after construction has been completed.

2. Do NOT clean brushes or equipment in the building’s public restrooms.

D. HVAC: Owner agrees to provide, at no cost, air conditioning/heating - existing HVAC systems may be used by the contractor.

1. Heat: Use of gasoline-burning heaters and open-flame heaters is NOT permitted.

3.2 TEMPORARY CONSTRUCTION AND SUPPORT FACILITIES

A. Field offices, storage trailers, and support facilities: If required, maintain temporary support facilities until Substantial Completion. Locate storage trailers and support facilities as indicated by Owner’s representative during the Pre-Construction Meeting.

B. First Aid Facilities: Provide on-site emergency first aid kit. Comply with regulations and health code requirements.

C. Sanitary wash and drinking water facilities: Workers may use the existing public restrooms.

1. During construction, it is the Contractor’s responsibility to clean and maintain the restrooms the construction crews are using. If restrooms are not kept clean, the Owner reserves the right to prohibit further use and Contractor will be responsible for procuring restroom facilities for construction crews and sub-contractors.

3.3 TRASH AND DEBRIS REMOVAL

A. Dumpsters or similar debris storage and removal containers/vehicle:

1. General:

a. It is the contractor’s responsibility to provide dumpsters for use in temporary storage of items to be removed from the site.

b. All building material and trash shall be disposed of off campus.

c. Collect waste daily and dispose of waste off-site according to local ordinances when containers are full.

d. Do NOT allow dumpsters to become overly full and for the contents to overflow.

e. Dumpster(s) location will be determined during the Pre-Construction Meeting.

f. Handle hazardous, dangerous, or unsanitary waste materials separately from other waste by containerizing properly. Dispose of material according to applicable laws and regulations.

2. Waste Management and Disposal:

a. The Contractor shall allow no trash to accumulate around and on the dumpster/container site.

b. Material wrappers and construction debris shall not be allowed to blow from the dumpster/container but shall be placed in containers or bags.

c. Materials and construction debris that have fallen/blown out of the dumpsters are to be picked up by the Contractor’s personnel.

d. The area around the dumpster/container shall be fielded each day for debris by the

Contractor’s personnel.

e. If campus personnel have to clean the areas around the dumpsters or areas of work, the Owner will be compensated for their time.

f. Burning of trash and debris is NOT permitted.

TEMPORARY FACILITIES 01 50 00-3

B. Interior Project Area and adjacent surroundings:

1. General:

a. Collect and remove waste daily from the interior project area.

b. Do NOT allow debris and/or waste to accumulate in the project area or in surrounding areas (including the covered walkways and courtyard).

2. Maintenance:

a. The area around the work place shall be fielded each day for debris by the Contractor’s personnel.

b. If campus personnel have to clean the areas around the area of work, the Contractor will be compensated for their time.

3.4 VEHICULAR ACCESS AND PARKING

A. Portions of the on-site parking will be designated by the campus for use by the contractor for worker parking and staging areas.

B. Contractor’s and workers vehicles will need CCGA parking permits. Parking permits are available at the CCGA Police Department (located in the Andrews Building), at no charge.

3.5 TEMPORARY SECURITY AND PROTECTION

A. Fire Protection: Provide adequate numbers and types of fire extinguishers for each area under where work is underway.

B. Barricades: Provide temporary barricades, warning signs, and lights to protect the public and construction personnel from construction hazards.

C. Security Enclosure for materials and equipment:

1. Where materials and equipment are stored outside the project area, provide a secure lockup.

2. Do NOT store materials in the building’s exterior covered corridors or in the courtyard.

D. Security for Project Area: Secure project area after hours.

3.6 ENVIRONMENTAL CONTROLS

A. Environmental Controls - General: Provide temporary environmental controls as required by authorities having jurisdiction including, but not limited to, dust control, noise control, and pollution control.

B. Noise:

1. The Contractor shall avoid operating noisy equipment or generating excessive noise that will interrupt or interfere with the normal operation of the Campus and the buildings on the campus. The Contractor shall conscientiously strive to maintain minimum noise levels from construction operations and from his workers during normal working hours 7:30 AM to 11:00 PM daily, Monday through Friday.

2. The Owner reserves the right to stop noise-generating activities if they interrupt or interfere with campus activities. Such activities shall stop immediately upon request by the Campus Representative and be rescheduled to afterhours.

3. Work impacting the main building corridor shall take place after hours or on weekends.

01 50 00-4 TEMPORARY FACILITIES

3.7 TEMPORARY DUST CONTROL

A. The Contractor shall provide secure, dust proof containment for the project area. Provide a full height temporary partition or similar to protect adjacent occupied areas from dust, dirt and debris.

1. The temporary partition (or similar) shall be installed so as to not impact or damage the existing finishes.

3.8 PROJECT IDENTIFICATION

A. Contractor shall provide signage indicating that area is a construction site.

B. The university will provide signage indicating the temporary closure of spaces and directional signage to alternate locations as needed.

3.9 TERMINATION AND REMOVAL

A. Remove each temporary facility when replaced by authorized use of a permanent facility or no later than Substantial Completion.

B. Complete or restore permanent construction that may have been delayed due to interference with the temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.

PRODUCT REQUIREMENTS 01 60 00-1

SECTION 01 60 00 –PRODUCT REQUIREMENTS

A. This Section includes:

1. General product requirements and definitions

2. Product substitutions

1.2 SECTION REQUIREMENTS

A. Provide products of same kind from a single source.

B. Deliver, store, and handle products according to manufacturer's written instructions, using means and methods that will prevent damage, deterioration, and loss, including theft.

1. Schedule delivery to minimize long-term storage and to prevent overcrowding construction spaces.

2. Deliver in manufacturer's original sealed packaging with labels and written instructions for handling, storing, protecting, and installing.

3. Inspect to ensure compliance with the Contract Documents and to ensure items are undamaged and properly protected.

4. Store heavy items in a manner that will not endanger supporting construction.

5. Store items subject to damage aboveground, under cover in a weather tight enclosure, with ventilation adequate to prevent condensation. Maintain temperature and humidity within range required.

2.1 PRODUCT OPTIONS

A. Provide items that comply with the Contract Documents, are undamaged, and are new at the time of installation.

1. Provide products and equipment complete with accessories, trim, finish, and other devices and components needed for a complete installation and the intended use and effect.

B. Do not attach manufacturer's labels or trademarks, except for required nameplates, on surfaces exposed to view in occupied spaces or on the exterior.

C. Select products as follows:

1. Where these Specifications name only a single product or manufacturer, such references are made solely to indicate that products of that description may be furnished and are not intended to restrict competitive bidding. If it is desired to use products which are different from those mentioned, application for the approval of the use of such products must reach the hands of the Owner at least ten days prior to the date set for the opening of bids.

2. Where these Specifications name two or more products or manufacturers, provide one of the items indicated. No substitutions will be permitted.

01 60 00-2 PRODUCT REQUIREMENTS

3. Where these Specifications describe a product and list characteristics required, with or without naming a brand or trademark, provide a product that complies with the characteristics and other requirements.

4. Where these Specifications require compliance with codes, regulations, or reference standards, select a product that complies with the codes, regulations, or reference standards.

D. Unless otherwise indicated, Owner will select color, pattern, and texture of any product from manufacturer's full range of options.

E. Owner Provided / Contractor Installed: Coordinate with the Owner’s representative for delivery of OPCI items.

2.2 PRODUCT SUBSTITUTIONS

A. Reasonable and timely requests for substitutions will be considered.

B. Substitutions to products specified must be made prior to bidding.

1. Submit proposed substitution a minimum of seven days prior to bid date.

2. Do not submit unapproved substitutions on Shop drawings.

C. Submit the following at a minimum for each product to be substituted. Identify product to be replaced, provide complete documentation showing compliance of proposed substitution with all specified requirements, and include the following:

1. A full comparison with the specified product.

2. A list of changes to other Work required to accommodate the substitution.

3. Any proposed changes in the Contract Sum or Contract Time should the substitution be accepted.

D. Owner will review the proposed substitution and notify Contractor of its acceptance or rejection.

PART 3 EXECUTION (NOT APPLICABLE)

EXECUTION AND CLOSEOUT REQUIREMENTS 01 70 00-1

SECTION 01 70 00 –EXECUTION AND CLOSE-OUT REQUIREMENTS

A. This Section includes requirements for project start-up and close-out, including the following:

1. Examination and Preparation (start-up)

2. Project Cleaning and Waste Management

3. Close-out Procedure and Record Documents

4. Extra Materials/Attic Stock Procedure

B. Related Sections include the following:

1. Section 01 30 00, Administrative Requirements

2. Section 01 60 00, Temporary Facilities

PART 2 PRODUCTS (NOT APPLICABLE)

3.1 EXAMINATION AND PREPARATION

A. Existing Conditions: The Contractor, in undertaking the work under this contract, is assumed to have visited the premises and to have taken into consideration all conditions which might affect his work. No consideration will be given any claim based on lack of knowledge of existing conditions except where the contract documents make definite provisions for adjustment of cost or extension of time due to existing conditions which cannot be readily ascertained.

B. Measurements and Dimensions: Before ordering material or doing work which is dependent upon coordination with building conditions, the Contractor shall field verify all dimensions, elevations, by taking measurements at the building and shall be responsible for the correctness of same.

1. Any discrepancies between the drawings and/or the specifications and the existing conditions shall be referred to the Owner for additional instructions before any work affected thereby is begun.

C. Do not proceed with any portion of the work until unsatisfactory conditions have been corrected.

Start of work shall indicate acceptance of existing conditions.

D. It is the contractor’s responsibility to field verify all dimensions and conditions.

3.2 CLEANING AND WASTE MANAGEMENT

A. Site Maintenance and Construction Waste Management and Disposal

1. See Section 016000, Temporary Facilities.

B. Final Cleaning - Site:

1. Before final cleaning, repair and restore marred or damaged exposed finishes and surfaces.

2. Clean project site and grounds, in areas disturbed by construction or storage activities, including exterior paved areas free of rubbish, waste materials, litter and foreign substances.

01 70 00-2 EXECUTION AND CLOSEOUT REQUIREMENTS

3. Sweep paved areas broom clean in and around construction areas including dumpster locations and roof access areas. Rake grounds to a smooth even texture. Return damaged graded areas to original grade or grade indicated in documents. Restore pine straw islands.

4. Removed all tools and equipment from project site.

5. Remove waste and debris from project site.

6. Remove protective materials, security measures and signage from the project site.

3.3 CLOSEOUT PROCEDURES

A. Substantial Completion:

1. Request Substantial Completion inspection once the following are complete:

a. Final cleanup.

b. Touch up, repair, and restore marred, exposed finishes.

2. Delivery of spare parts, extra stock and similar items to Owner’s Representative. See paragraph 3.5 EXTRA MATERIALS/ATTIC STOCK.

3. Upon receipt of a request for inspection and upon completion of the installation, an inspection shall be made by the Owner to ascertain that the materials have been installed according to approved specifications and details. The Owner will proceed with the inspection, advise Contractor of unfilled requirements and produce the Certificate of Material Completion.

B. Final Inspection/Completion:

1. Request inspection for certification of final acceptance and final payment, once the following are complete. The inspection shall be scheduled only after receipt, by the Owner, of the Contractor's completed punch list. Upon approval of the project, the required warranties shall be issued.

a. Submit final payment request with releases of liens and supporting documentation, including insurance certificates. See Closeout Submittal / Project Record Documents below.

b. Submit a copy of the Substantial Completion inspection list stating that each item has been completed or otherwise resolved for acceptance.

2. Owner will re-inspect the Work on receipt of notice that the Work has been completed.

a. On completion of re-inspection, Owner will prepare a certificate of final acceptance. If the Work is incomplete, Owner will advise Contractor of the Work that is incomplete or obligations that have not yet been fulfilled.

3. Closeout documents shall be delivered to the Owner prior to the issuance of the certificate of final acceptance and final payment.

3.4 CLOSEOUT PROCEDURE: PROJECT RECORD DOCUMENTS

A. General: Provide one digital copy or one hard copy of the Project Record Documents as noted below.

1. Compile the digital/electronic files following in portable flash/thumb drive, sub-divided into sections matching specification divisions and pertinent documents.

2. Compile the hard copies of the following in binder, sub-divided into sections matching specification divisions and pertinent documents. A report cover type binder with prongs or fasteners is acceptable, provided pages are removable. (No GBC or spiral bindings.)

3. Provide one copy of each item, unless noted otherwise.

4. Provide a master Table of Contents, with each item noted as included in the hard copy binder or in the digital file.

5. Deliver both hard copies and digital copies to the Owner.

B. Shop Drawings/Submittals: Provide one copy of all marked-up submittals and shop drawings, in digital or hard copies.

EXECUTION AND CLOSEOUT REQUIREMENTS 01 70 00-3

1. Include maintenance and care instructions for each finish material.

2. Refer to each Specifications Sections for miscellaneous record keeping requirements and submittals.

3. Include manufacturer’s warranties.

4. Include all record samples.

a. Samples may be incorporated into the binder/notebook (in plastic holders), or may be handled separately.

b. Provide one of each sample in the Owner’s binder, minimum.

C. Operation and Maintenance Data and Instructions and Training: Provide one copy, digital or hard.

1. The Contractor shall furnish proper written instructions to the Owner and Using Agency on operation and maintenance of all mechanical and electrical equipment.

2. The Contractor shall provide training to the Using Agency in the operation and maintenance of all mechanical and electrical systems in the presence of the Owner and shall provide written notice in writing to Owner and Using Agency at least fifteen days prior to the date it proposes for the training.

3. For all items of mechanical or electrical equipment or apparatus installed that require operation or maintenance after occupancy, the Contractor shall furnish and deliver to the Owner and Using Agency complete brochures and data as prepared and published by the manufacturers covering details of operation and maintenance.

D. Test & Balance report: Provide one copy, digital or hard.

1. Test and balance report(s) on the heating, ventilating, and air conditioning system if required.

Provide a copy of each test report for each test completed.

E. General Contractor’s Warranty & Guaranty: Use the form at the end of this section.

1. Provide two originals (hard copies) of each in the Owner’s binder.

F. Consent of Surety: Provide one original hard copy in the Owner’s binder.

G. Affidavits & Certificates: The following forms are located in Section 7, Forms, of the General Conditions.

1. Non-Influence Affidavit: Provide one hard/original copy in the Owner’s binder.

2. Statutory Affidavit: Provide one hard/original copy in the Owner’s binder.

3. Contractor Affidavit and Certificate of Compliance: Provide one hard/original copy in the

Owner’s binder.

4. Subcontractor Retainage Release Certificate (to be filed out by the major subcontractors):

Provide one copy, hard or digital.

H. Final Certification of Costs: The form is located in Section 7, Forms, of the General Conditions Provide one original for the Owner’s binder.

1. Include change orders.

I. Government Agencies:

1. State Fire Marshal approved drawings and specifications: Deliver the stamped approved contract documents to the Owner as part of the close-out submission.

2. State Fire Marshal Inspection Reports: Provide one copy of each inspection report in each binder (with originals in the Owner’s binder).

01 70 00-4 EXECUTION AND CLOSEOUT REQUIREMENTS

J. Record Documents: The Contractor shall provide a complete set (drawings and specifications) of marked-up contract documents, which shall reflect all changes. Provide one copy, for the Owner’s binder.

1. Include all addendum, change orders and modifications to the contract.

2. Include field records for variable and concealed conditions.

3. Include observed changes by the Contractor or subcontractor(s).

4. Large drawings/prints may be folded and provided separately, they do not have to be submitted in the ringed binder.

K. Extra Stock Transmittal: Provide one copy of the signed transmittal, hard or digital.

1. If a dated photograph showing the materials at delivery was taken, provide one copy in each binder for the Owner and the Owner.

3.5 EXTRA MATERIALS/ATTIC STOCK

A. Furnish extra materials as described in each specification section that match products installed.

1. Materials shall be packaged with protective covering for storage or where possible remain in original containers.

a. Containers or packaging shall be taped or sealed closed.

b. Containers must be in good shape.

c. Materials must be packaged, not delivered loose. Loose materials will not be counted towards the extra materials required.

2. Packaging shall be identified with appropriate labels indicating the project name and number.

B. Furnish quantity of full-size units equal to 5-percent of total amount installed unless noted otherwise in the specific specification sections.

C. Deliver extra materials to Owner. Coordinate with Owner for delivery location and time.

D. Provide transmittal to be signed by receiver as follows:

1. Transmittal must include project number and name.

2. Transmittal must indicate quantity of materials delivered.

3. Transmittal must be signed and dated by the person receiving the materials.

Board of Regents of the University System of Georgia

Warranty and Guaranty of General Contractor

Project Number: Date:

Project Name:

Institution:

General Contractor:

1. This warranty and guaranty executed this day of , 2012, by the General Contractor named in the caption above (hereinafter designated ‘GENERAL CONTRACTOR’) in favor of and for the benefit of Board of Regents of the University System of Georgia, Owner

2. WITNESSETH, that

3. WHEREAS, the contract for construction of the captioned work contains the following provision, to wit:

Neither the final certificate nor payment nor any provision in the contract documents shall relieve the contractor of responsibility for faulty materials or workmanship, and he shall remedy any defects due thereto and pay for any damage to other work resulting therefrom.

The owner shall give notice of observed defects with reasonable promptness. The contractor shall promptly correct, remedy, or remove from the premises all work condemned by the Owner as failing to conform to the contract or as being faulty in materials or workmanship, and the contractor shall promptly replace and re-execute the work in accordance with the contract and without expense to the owner. If the contractor does not remove, correct, or remedy faulty work, including any work called for by the contract documents but omitted, within a reasonable time, fixed by a written notice of the owner, the owner may remove the work, correct the work, or remedy the work, at the expense of the contractor. Correction of defective work executed under the plans and the specifications, whether covered by warranty of a subcontractor or materialman or by separate bond of any subcontractor or materialmen, remains the primary direct responsibility of the contractor.

The foregoing obligations of the contractor shall remain in effect until the same shall have been extinguished by operation of the statute of limitations for the jurisdiction in which the work is executed. As additional security for the fulfillment of such obligations, but in no way limiting same, the contractor shall furnish to the owner as a collateral instrument for use in connection with the contract bond a written warranty and guarantee of the contractor that all work executed under the plans and specifications will be free from defects of materials and workmanship for a period of one year from the date of final acceptance. In the case of work performed by subcontractors and also whenever specific guaranties, warranties, or bonds are called for in the trade sections of the specifications, the contractor shall furnish guaranties, warranties or bonds for such period of time as may be stipulated, on which he himself is obligor, and he shall obtain and furnish from the subcontractors or materialmen warranties, guaranties, or bonds for such period of time as may be stipulated, which shall be in such form as to permit direct enforcement by the owner against the subcontractor or materialmen: provided, however, that in the latter instance the general contractor shall also be named as joint principal with such subcontractor or materialman in any such bond, warranty, or guaranty, and the instrument shall state that liability is joint and several. The calling for and the furnishing of specific written warranties, guaranties, or bonds shall in no way limit the obligations of the contractor set forth hereinbefore.

4. NOW, THEREFORE, pursuant to the aforesaid contract and in consideration of one dollar paid in hand, receipt of which is hereby acknowledged, and other benefits flowing to the parties, GENERAL CONTRACTOR, its successors and assigns, warrant and guarantee that all work in connection with the construction contract for the captioned project shall be free from defects resulting from faulty materials or faulty workmanship or noncompliance with the contract documents for a period of one year from the date of final acceptance or for such greater period of time after the date of final acceptance as may be stipulated for in any trade section of the specifications.

5. IN WITNESS WHEREOF GENERAL CONTRACTOR has executed this instrument as of the day and year first appearing above.

ATTEST:

General Contractor

(SEAL)

By:

SELECTIVE DEMOLITION 02 1941 -1

SECTION 02 41 19 - SELECTIVE DEMOLITION

1. Removal of selected building components.

2. Patching and repair of damaged items.

B. Related Sections include:

1. Section 01 50 00, Temporary Facilities

1.2 DEFINITIONS

A. Remove: Remove and legally dispose of items except those indicated to be reinstalled, salvaged, or to remain the Owner’s property.

B. Remove and Salvage: Items indicated to be removed and salvaged remain the Owner’s property.

Remove, clean and pack items to protect against damage.

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
Award Information —
Drawings —
Add. # 2 —
Add. # 1 —
NOIA —
Bid Invite and Contract —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .