Specifications - Workstations DSCR B80 and 32M.pdf
PDF 235 KB Posted
- Attached to
- Workstations for DSCR Building 80
- Solicitation number
- SP4703-24-R-0009
- Issued by
-
Defense Logistics Agency
About this file
This document is a set of specifications for workstations required by DLA Aviation at the Defense Supply Center Richmond in Richmond, Virginia. The specifications detail the requirements for 306 workstations, including chairs, electrical components, panels, shrouds, and other accessories, to be installed in Building 80 and Building 32 M Bay. The workstations must be manufactured by Affordable Interior Systems (AIS), Inc. The document also outlines the required electrical work, including the installation of ceiling and base feeds, as well as the demolition and disposal of existing workstations.
The related federal contract opportunity is a Request for Proposal (RFP) solicitation, number SP4703-24-R-0009, for the procurement of these workstations and associated services. The RFP is an unrestricted acquisition with a 180-day delivery requirement. The contract will be a firm-fixed-price (FFP) contract, and the award will be made to the lowest-priced, technically acceptable offeror. Proposals are due on May 10, 2024, at 2:00 PM EST.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCE SELECTION INFO - SEE FAR 2.101 & 3.104 PAGE 1 of 2
Workstations for DSCR Building 80 and Building 32 M Bay
DLA Aviation at the Defense Supply Center Richmond requires new workstations and installation in Building 80 and Building 32 M Bay. Services are also required to for demolition and disposal of existing workstations along with electrical work.
Shipping Address:
DLA Aviation 6090 Strathmore Road Richmond, VA 23237
Delivery Lead Time: 180 Days ARO
Requirement Specifications Manufacturer: Affordable Interior Systems (AIS), Inc. (1SN97)
• Black Bolton Chairs Mid Back Lumbar Support Black Qty 306
• Duplex Outlet - Line 1 – Black QTY 73
• Duplex Outlet - Line 2 – Black QTY 82
• Duplex Outlet - Line 3 – Black QTY 83
• Duplex Outlet - Line 4 Dedicated – Black QTY 69
• 21 in. Electrical Jumper (Extended Panel To Panel) QTY 135
• Side Mounted Base Infeed - 72L - 8 Wire/4 Circuit QTY 14
• Ceiling Infeed 144" (AO,DV,MW) QTY 6
• LH Receptacle Mounted Base Infeed - 72L - 8 Wire/4 Circuit QTY 7
• RH Receptacle Mounted Base Infeed - 72L - 8 Wire/4 Circuit QTY 7
• Linear 3-Way 90 Degree Base Shroud- Medium Tone QTY 104
• Linear 2 Way - 90 Degree Base Shroud- Medium Tone QTY 332
• Divi Linear Hard Surf Perm/Mono Panel - PWR - 66H x 60W- Medium Tone QTY 186
• Divi Linear Panel - Hard Surf Perm/Mono - NPWR - 66H x 24W Medium Tone QTY 357
• Divi Linear Panel - Hard Surf Perm/Mono - NPWR - 66H x 30W Medium Tone QTY 357
• Divi Linear Qtr Glass Panel - Perm/Mono - NPWR - 66H x 24W Medium Tone QTY 309
• Divi Linear Base - End of Run Shroud QTY 384
• Regular Can�lever - Pair - 24D Black QTY 306
SOURCE SELECTION INFO - SEE FAR 2.101 & 3.104 PAGE 2 of 2
• Pedestal - B/B/F - 24D Medium Tone QTY 306
• Inline Power/Data Pole 48"H Extender QTY 18
• Ceiling Infeed 180"" (AO,DV,MW) QTY 18
• Divi Linear In-Line Power/Data Pole - 3 Way - 66H Medium Tone QTY 20
• Divi Linear In-Line Power/Data Pole - 2 Way - 66H Medium Tone QTY 4
• Inline Power/Data Pole 48"H Extender QTY 18
• Bullpen Worksurface - Rect 24"D x 54 1/4"W Laminate QTY 306
Building 80 TASKS
• Tear down and dispose of approximately 35 existing workstations.
• Install 99 new workstations.
• Use certified electrician(s) to disconnect and dismantle 7 existing power poles. Establish
6 ceiling feeds and 14 base feeds. The electrical work must be completed during normal business hours (Monday – Friday between 0700-1600).
Building 32 M Bay TASKS
• Tear down and dispose of approximately 98 exis�ng worksta�ons.
• Install 206 new worksta�ons.
• Use cer�fied electrician(s) to disconnect and dismantle 30 exis�ng power poles.
Establish 18 ceiling feeds and 14 base feeds. The electrical work must be completed during normal business hours (Monday – Friday between 0700-1600).
File details come from the government source that posted it. Updated .