Specifications V2 - 0 Stewart Street Remediation.pdf
PDF 155 KB Posted
- Attached to
- 0 Stewart Street Remediation Project
- Solicitation number
- SRC0000034703
- Issued by
- Russell County, Alabama
About this file
This is an Invitation for Bids specification document issued by the Alabama Department of Environmental Management (ADEM), Environmental Services Branch, Removals and Response Unit, for the remediation of an unauthorized dump and scrap tire site located at 0 Stewart Street, Troy, Pike County, Alabama (Public Solicitation 1209/1136). The project requires the removal of scrap tires, scrap tire materials, and other solid wastes from the site, with all materials to be properly disposed of or documented for approved beneficial reuse or recycling. A mandatory onsite meeting is required for all interested contractors prior to bid submission. Contractors must submit a proposed remediation plan prepared by a Professional Engineer registered in Alabama in accordance with ADEM Administrative Code requirements, along with a detailed project cost estimate breakdown. The selected contractor must commence work within ten days of award and complete the project within ninety days. All work must comply with Division 13 Regulations and include site closure activities, installation of "No Dumping" signs at Department-designated locations, and submission of all required schedules and documentation through the Alabama Environmental Permitting and Compliance System (AEPACS) portal.
The Department has established a maximum contract value of $204,000.00 for this project. Bids exceeding $25,000 will be evaluated by the State of Alabama Division of Purchasing. Equipment mobilization reimbursement is capped at $1,250.00. Bidders submitting bids over $100,000 must be licensed under Title 34, Chapter 8, Code of Alabama, 1975, and if the majority of work (51% or greater) constitutes tire remediation and disposal, contractors must hold the EV-S classifications for Remediation and/or Tire Disposal on their General Contractors License. All bidders except individuals must demonstrate qualification with the Alabama Secretary of State. No advance payments will be made; reimbursement occurs only upon project completion. Selected bidders must execute conflict of interest and legal worker status documentation before contract execution. Liquidated damages may be assessed for non-completion within the agreed-upon timeframe. Bids cannot be withdrawn for sixty days following bid opening without bidder consent, and the Department reserves the right to reject any or all bids.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EDWARD F. POOLOS
DIRECTOR
JEFFERY W. KITCHENS
DEPUTY DIRECTOR
Alabama Department of Environmental Management adem.alabama.gov
1400 Coliseum Blvd. 36110-2400 ■ Post Office Box 301463 Montgomery, Alabama 36130-1463
(334) 271-7700 ■ FAX (334) 271-7950
KAY IVEY
GOVERNOR
STATE OF ALABAMA
ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
ENVIRONMENTAL SERVICES BRANCH
REMOVALS AND RESPONSE UNIT
INVITATION FOR BIDS FOR UNAUTHORIZED DUMP AND SCRAP TIRE SITE REMEDIATION
PUBLIC SOLICITATION – 1209/1136
Sealed electronic bids for the removal of scrap tires, scrap tire materials, and other solid wastes located within, but not limited to, the below referenced site will be received through the Alabama Buys State Purchasing System.
0 Stewart Street 551701120000023000, Troy, Pike County, Alabama (approximate latitude 31.7699 and longitude -85.9053)
A mandatory onsite meeting will be held for this project. All interested contractors are expected to attend the onsite inspection before submitting a bid for this project. For additional details regarding this project, please submit your questions via the Alabama Buys Discussion tab for this project.
The Department is prepared to pay a maximum of $204,000.00 for this project. Bids submitted for over $25,000 will be referred to and evaluated by the State of Alabama Division of Purchasing to be placed under contract.
No pre-qualification of prospective bidders will be conducted. However, all prospective bidders must ensure that they are in compliance with all local, state, and federal laws regarding competitive bidding, bids submitted, and the type of work to be performed under a contract for solid waste or scrap tire fund site remediation.
All bidders submitting bids in amounts exceeding one hundred thousand dollars ($100,000) must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975. Any such bids shall bear the license number of the bidder included in the proposal. If the majority of the work (51% or greater) is remediation and/or removing and disposing of scrap tires, the contractor must have the classification of EV-S: Remediation and/or EV-S: Tire Disposal listed on their General Contractors License.
All bidders, other than individuals, shall show evidence of having qualified with the Secretary of State to do business in the State of Alabama. The Department reserves the right to reject any and all bids and to waive any formalities in the bidding process. Failure to submit all required documentation with the bid package in the manner specified in this notice may result in the rejection of the bid proposal. No bids shall be withdrawn for a period of 60 days subsequent to the opening of bids without consent of the bidder.
The selected bidder will be required to sign both conflict of interest (Act 2001-955 Disclosure Form) and legal worker status documentation before purchase order or contract execution.
Complete plans and specifications for the project are as set out below and along with the purchase order or contract, comprise the complete agreement and scope of work to be performed. The requested work and services shall include the following:
1. This remediation project REQUIRES a proposed remediation plan prepared by a Professional Engineer registered in the State of Alabama in accordance with the requirements of ADEM Admin.
Code r. 335-13-11-.03(4). All prospective bidders must submit, at a minimum, a basic, proposed remediation plan for the project using ADEM Admin. Code r. 335-13-11-.03 as guidance, along with their bid. The Remediation plan will be submitted through the Alabama Environmental Permitting and Compliance System (AEPACS) portal after the winning bid has been announced. The awarding of projects will be contingent on the adequacy of the proposed remediation plan submitted.
2. All bids submitted must be accompanied by a project cost estimate breakdown of the bid.
3. The Department will not reimburse more than $1,250.00 for equipment mobilization.
4. Once the project has been awarded, the contractor must start the project within ten (10) days of the award date and the project must be completed within ninety (90) days of the award date.
The contractor must notify the Removals and Response Unit immediately if the project cannot be started or completed by the allotted dates.
5. The removal and proper disposal of all solid wastes, scrap tires, and scrap tire materials present on the site is required. Submittal of documentation showing proper disposal or documentation of approved beneficial reuse or recycling will be required for all materials removed from the site.
Additionally, the site shall be closed in accordance with Division 13 Regulations and the approved remediation plan.
6. All required schedules (i.e. R & R Remediation Plan, R & R Remediation Project Start Date Notification, R & R Post-Remediation Inspection Request, and R & R Remediation Project Reimbursement Request, etc.) must be submitted using the AEPACS online portal for the site.
7. "No Dumping" Signs shall be install on the site at locations determined by the Department (contact the Removals and Response Unit for a copy of the sign template if needed).
8. Compliance with all local, State and federal laws and regulations during the entirety of the project, to include such work or documentation as may be required by Division 6 of the ADEM Administration Code.
9. No payment shall be made in advance of project completion.
10. All requirements of the contract must be adhered to for the entirety of the project.
11. The Department may utilize any and all processes available under State law for selection and contract execution.
12. Liquidated damages for non-completion of work within the time limit agreed upon may be assessed in accordance with Department policy. Adherence to the associated project scope of services found in the Alabama Buys State Purchasing System along with this solicitation is required.
Nondiscrimination Statement: The Department does not discriminate on the basis of race, color, national origin, sex, religion, age or disability in the administration of its programs.
File details come from the government source that posted it. Updated .