Thompson State Fish Hatchery Contract Summary

This is a Michigan Department of Natural Resources state construction contract specification document prepared by HDR Engineering, Inc., for the renovation and new construction of the Thompson State Fish Hatchery located at 944 S. State Highway M149, Manistique, Michigan 49854. The project encompasses renovation work including installation of a new deep geothermal well with associated piping and electrical systems, a new fish feeding system, resurfacing of existing rearing tanks with coatings, and replacement of an emergency generator system, along with new construction of fish rearing ponds, a solar pond with EPDM liner, concrete harvest kettles, pond electrical and aeration systems, predator netting infrastructure, perimeter fencing, a new incubation building with water treatment equipment, and a metal pole building. Bids were due March 20, 2019, at 2:00 p.m. local time through the Michigan SIGMA VSS electronic bidding portal, with a mandatory pre-bid conference held March 11, 2019, at the hatchery site. The contract requires substantial completion by August 1, 2020, with final completion within 30 days thereafter. Liquidated damages are assessed at $750 per day for failure to meet the substantial completion date. The contract incorporates Michigan state standard forms and general conditions, including performance and payment bonds, comprehensive insurance requirements, and detailed quality assurance and special inspection protocols.

The contract includes four deductive alternates allowing the owner to reduce scope: deletion of a storage building, deep well, coldwater generator system, and chilled water system. The State has applied for and obtained permits including a domestic well permit, domestic wastewater permit, floodplain and wetlands permit, and LARA review, with costs borne by the owner. The contractor must comply with prevailing wage requirements, soil erosion and sedimentation control regulations, Michigan residency requirements for employees (50 percent of workforce), and nondiscrimination provisions. Funding source is identified as 171CODNR5255 under Agency No. 751. The contract requires comprehensive shop drawing submittals, operations and maintenance manuals, progress scheduling using Critical Path Method, and adherence to specifications spanning divisions covering site clearing, concrete work, masonry, structural steel, roofing, mechanical systems, plumbing, HVAC, electrical work, and specialized aquaculture equipment. The contractor must establish a field office with telephone and sanitary facilities, provide monthly progress photographs, and coordinate all work to minimize disruption to ongoing hatchery operations.

View the file

Other files

File Type Posted
Drawings TSFH_Part13.pdf PDF
Drawings TSFH_Part2 (s).pdf PDF
Drawings TSFH_Part10.pdf PDF
Addendum 1 TSFH.pdf PDF
Advertisement TSFH.pdf PDF
Drawings TSFH_Part12.pdf PDF
Drawings TSFH_Part8.pdf PDF
Drawings TSFH_Part3.pdf PDF
Specifications TSFH_Part2.pdf PDF
Drawings TSFH_Part7.pdf PDF
Drawings TSFH_Part1.pdf PDF
Drawings TSFH_Part11.pdf PDF
Drawings TSFH_Part5.pdf PDF
Specifications TSFH_Part3.pdf PDF
Drawings TSFH_Part4.pdf PDF
Drawings TSFH_Part6.pdf PDF
Drawings TSFH_Part9.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michigan Department of Natural Resources Thompson State Fish Hatchery Renovate and Construct New Cool Water Facility

Project Manual

Contract Documents

2/20/2019

File No. 751/16262.JAG Index No. 11856 & 88340 HDR Project No. 10052369

02/20/19

This is a Cover Sheet to the State’s Owner and Contractor Standard Construction Contract, known as the MICHSPEC Division 0 Specifications. The MICHSPEC Division 0 Specifications have been developed from the FORMSPEC Michigan Model, 1997 Edition. Although the State’s 2008 Version of the Division 0 Specifications are written as simply as practical, it is nonetheless advisable to consult with companion Guide to Specifiers when preparing specifications for a specific project. These Division 0 Specifications were developed by incorporating provisions and requirements furnished by the State into the FORMSPEC Michigan Model. These Division 0 Specifications have undergone detailed technical reviews by Department of Technology, Management and Budget, State Facilities Administration representatives and detailed legal reviews by the Department of the Attorney General for the State of Michigan. Specifiers are encouraged to consult with a Division 0 specifications specialist or an attorney knowledgeable in public contracts when preparing specifications for a specific project.

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR

STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT

MICHSPEC No. 97.0820 00020 THROUGH 97.0820 00440

RELEASED ON NOVEMBER 1, 1997;

Developed from Contract Forms and Conditions of the Contract

FORMSPEC Michigan Model and suggested for use with Bidding Requirements

1997 Edition/Rev 2/19 Version

STATE OF MICHIGAN (OWNER & CONTRACTOR) TABLE OF CONTENTS

MICHSPEC DTMB 00010 1 (Rev. 2/19)

SECTION 00010 TABLE OF CONTENTS

SECTION/PAGE NO.

SUBJECT INDEX

SECTION 00020 GLOSSARY .............................................................................................................................................00020 - 1 SECTION 00030 ADVERTISEMENT ..................................................................................................................................00030 - 1 SECTION 00100 INSTRUCTIONS TO BIDDERS ...............................................................................................................00100 - 1 ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS ..................................................................................................00100 - 1 ARTICLE 2 QUALIFICATIONS OF BIDDERS.....................................................................................................................00100 - 1 ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS; SAFETY REQUIREMENTS; LAWS.......................................00100 - 2 ARTICLE 4 INTERPRETATIONS; ADDENDA ....................................................................................................................00100 - 3 ARTICLE 5 BID SECURITY.................................................................................................................................................00100 - 3 ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES..................................................................................................00100 - 4 ARTICLE 7 MATERIALS AND EQUIPMENT ......................................................................................................................00100 - 4 ARTICLE 8 SUBCONTRACTORS.......................................................................................................................................00100 - 5 ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS .................................................................................................00100 - 5 ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS ................................................................................................00100 - 6 ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION .......................................................................................................00100 - 6 ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD ...............................................................................................00100 - 7 ARTICLE 13 BIDS TO REMAIN OPEN .................................................................................................................................00100 - 7 ARTICLE 14 AWARD OF THE CONTRACT .........................................................................................................................00100 - 7 ARTICLE 15 EXECUTION OF THE AGREEMENT...............................................................................................................00100 - 9 ARTICLE 16 MOBILIZATION PAY ITEM.............................................................................................................................. 00100 -10 ARTICLE 17 SOIL EROSION AND SEDIMENTATION CONTROL–FINE FOR NON-COMPLIANCE .................................00100 -10 ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK LIST .......................................................................................00110 - 1 SECTION 00120 SUPPLEMENTARY INSTRUCTIONS .....................................................................................................00120 - 1 SECTION 00210 INFORMATION FOR BIDDERS ..............................................................................................................00210 - 1 SECTION 00300 BID SUMMARY .......................................................................................................................00300 - SUMMARY SECTION 00300 BID FORM ...............................................................................................................................................00300 - 1 ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("THE OWNER")..................................................00300 - 1 ARTICLE 2 THE BIDDER'S REPRESENTATIONS...............................................................................................................00300 - 1 ARTICLE 3 TIME OF COMPLETION ....................................................................................................................................00300 - 2 ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID ...................................................................................................00300 - 2 ARTICLE 5 DEFINED TERMS ..............................................................................................................................................00300 - 2 ARTICLE 6 BID SCHEDULE .................................................................................................................................................00300 - 3 ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES .....................................................................................................00300 - 5 ARTICLE 8 BID SUBMITTED ON......................................................................................................................................... 00300 - 6 SECTION 00310 BID BOND ...............................................................................................................................................00310 - 1 SECTION 00320 NONCOLLUSION AFFIDAVIT ................................................................................................................00320 - 1 SECTION 00410 BID BREAKDOWN..................................................................................................................................00410 - 1 SECTION 00420 QUESTIONNAIRE ...................................................................................................................................00420 - 1 ARTICLE 1 ORGANIZATION ...............................................................................................................................................00420 - 1 ARTICLE 2 SPECIALTY CONTRACTOR LICENSES..........................................................................................................00420 - 1 ARTICLE 3 EXPERIENCE....................................................................................................................................................00420 - 1 ARTICLE 4 ADDITIONAL QUALIFICATIONS ......................................................................................................................00420 - 2 ARTICLE 5 REFERENCES ..................................................................................................................................................00420 - 2 REFERENCES ATTACHMENT.........................................................................................................................00420 - 3 SECTION 00430 LIST OF SUBCONTRACTORS...............................................................................................................00430 - 1 SECTION 00440 SCHEDULE OF MATERIALS AND EQUIPMENT ..................................................................................00440 - 1 ARTICLE 1 BID MATERIALS AND EQUIPMENT LISTED (NAMED OR SPECIFIED) ITEMS ..........................................00440 - 1 ARTICLE 2 BID MATERIALS AND EQUIPMENT OPEN SPECIFICATIONS ...................................................................00440 - 3 SECTION 00500 AGREEMENT ..........................................................................................................................................00500 - 1 ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK ..............................................................................................00500 - 1 ARTICLE 2 CONTRACT DOCUMENTS...............................................................................................................................00500 - 1 ARTICLE 3 CONTRACT PRICE...........................................................................................................................................00500 - 2 ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES...................................................................................................00500 - 2 ARTICLE 5 PAYMENTS TO CONTRACTOR ......................................................................................................................00500 - 3

MICHSPEC DTMB 00010 2 (Rev. 2/19)

ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR .........................................................................................00500 - 3 ARTICLE 7 CONTRACTOR'S REPRESENTATIONS..........................................................................................................00500 - 3 ARTICLE 8 MISCELLANEOUS ............................................................................................................................................00500 - 3 ARTICLE 9 NOTICE AND SERVICE....................................................................................................................................00500 - 4 SECTION 00520 ATTACHMENT “A” TO AGREEMENT ...................................................................................................00520 - 1 SECTION 00610 PERFORMANCE BOND ........................................................................................................................00610 - 1 SECTION 00620 PAYMENT BOND ...................................................................................................................................00620 - 1 SECTION 00700 GENERAL CONDITIONS ........................................................................................................................00700 - 1 ARTICLE 1 INTERPRETATIONS ...........................................................................................................................................00700 - 1

1.1 Section 00020 Glossary: ...............................................................................................................................................00700 - 1

1.2 Intent of the Contract Documents: ................................................................................................................................00700 - 1

1.3 Priority of the Contract Documents: ..............................................................................................................................00700 - 2

1.4 Interpretation of Indemnification Provisions: .................................................................................................................00700 - 2

1.5 Additional Interpretations: .............................................................................................................................................00700 - 2

1.6 Ownership and Use of the Contract Documents:..........................................................................................................00700 - 3

1.7 Copies of the Contract Documents: ...............................................................................................................................00700 - 3

ARTICLE 2 THE OWNERGENERAL PROVISIONS ..........................................................................................................00700 - 3

2.1 Availability of Lands, Areas, Properties and Facilities: .................................................................................................00700 - 3

2.2 Reference Points; Base Lines and Benchmarks:..........................................................................................................00700 - 3

2.3 Stop Work Order: ..........................................................................................................................................................00700 - 3

2.4 Limitations on the Owner’s Responsibilities:................................................................................................................00700 - 4

2.5 Additional General Provisions:......................................................................................................................................00700 - 4

2.6 Partnering Charter: .......................................................................................................................................................00700 - 4

ARTICLE 3 THE PROFESSIONAL GENERAL PROVISIONS..........................................................................................00700 - 4

3.1 Owner’s Representative:..............................................................................................................................................00700 - 4

3.2 Clarifications and Interpretations: .................................................................................................................................00700 - 4

3.3 Minor Variations and No-Cost Changes; Minor Delays: ...............................................................................................00700 - 5

3.4 Determinations by the Professional: ...........................................................................................................................00700 - 5

3.5 Limitations on the Professional’s Responsibilities: .......................................................................................................00700 - 5

ARTICLE 4 CONTROL OF WORK GENERAL PROVISIONS ..........................................................................................00700 - 5

4.1 Review of the Contract Documents: .............................................................................................................................00700 - 5

4.2 Management, Supervision, and Personnel: ..................................................................................................................00700 - 5

4.3 Materials and Equipment: .............................................................................................................................................00700 - 6

4.4 Concerning Control of Work:.........................................................................................................................................00700 - 6

4.5 Patent Fees and Royalties: ...........................................................................................................................................00700 - 7

4.6 Use of Premises:...........................................................................................................................................................00700 - 7

4.7 Record Documents: ......................................................................................................................................................00700 - 7

4.8 Emergencies: ................................................................................................................................................................00700 - 8

4.9 Indemnification: .............................................................................................................................................................00700 - 8

ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS..........................................................................................................00700 - 8

5.1 Employment of Subcontractors: ....................................................................................................................................00700 - 8

5.2 "Or Equal" and Substitute Materials and Equipment: ...................................................................................................00700 - 9

5.3 The Contractor’s Continuing Responsibilities: ............................................................................................................00700 - 9

ARTICLE 6 SUBMITTALS ....................................................................................................................................................00700 - 9

6.1 Shop Drawing, Sample and Other Technical Submittals: .............................................................................................00700 - 9

6.2 Review and Return of Technical Submittals: ...............................................................................................................00700 - 10

6.3 Progress Schedule Submittals: ....................................................................................................................................00700 - 10

6.4 Review and Return of Progress Schedule Submittals: ................................................................................................00700 - 10

6.5 Additional Provisions Concerning Submittals: .............................................................................................................00700 - 10

ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE .........................................................................................................00700 - 11

7.1 Laws; Permits (Which Include Approvals and Licenses): ............................................................................................00700 - 11

7.2 Sales and Use Tax and Other Similar Taxes:..............................................................................................................00700 - 12

7.3 Safety and Protection:..................................................................................................................................................00700 - 12

7.4 Bonds and Insurance - General Requirements:...........................................................................................................00700 - 12

7.5 The Contractor’s Liability Insurance:..........................................................................................................................00700 - 12

7.6 The Owner’s Liability Insurance:.................................................................................................................................00700 - 13

7.7 Property Insurance (Builder's All Risk Insurance):.......................................................................................................00700 - 13

7.8 Waiver of Rights:..........................................................................................................................................................00700 - 13

7.9 Receipt and Application of Proceeds: ..........................................................................................................................00700 - 13

MICHSPEC DTMB 00010 3 (Rev. 2/19)

7.10 Unfair Labor Practice: ..................................................................................................................................................00700 - 13

7.11 Michigan Right-To-Know Law: .....................................................................................................................................00700 - 13

7.12 Nondiscrimination: .......................................................................................................................................................00700 - 14

7.13 Michigan Residency for Employees:............................................................................................................................00700 - 14

ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION ............................................................................................00700 - 15

8.1 Starting the Work: ........................................................................................................................................................00700 - 15

8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: ....................................................................................................00700 - 15

8.3 Compliance with Contract Time Requirements:...........................................................................................................00700 - 15

8.4 Substantial Completion: ...............................................................................................................................................00700 - 15

8.5 Partial Use: ..................................................................................................................................................................00700 - 16

8.6 Division of Responsibilities: .........................................................................................................................................00700 - 16

8.7 Suspension of Work: ....................................................................................................................................................00700 - 16

8.8 Sharing of Total Float on Non-Critical Paths:...............................................................................................................00700 - 16

ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND

APPROVALS; CORRECTION OF WORK........................................................................................................00700 - 17

9.1 Warranty: ....................................................................................................................................................................00700 - 17

9.2 Tests, Inspections and Approvals: ..............................................................................................................................00700 - 17

9.3 Uncovering Work: .......................................................................................................................................................00700 - 17

9.4 Correction of Work: .....................................................................................................................................................00700 - 17

9.5 Special Correction Period Requirements:...................................................................................................................00700 - 18

9.6 Special Maintenance Requirements: ..........................................................................................................................00700 - 18

ARTICLE 10 CHANGES ......................................................................................................................................................00700 - 19

10.1 Changes in the Work: .................................................................................................................................................00700 - 19

10.2 Differing Subsurface or Physical Site Conditions:.......................................................................................................00700 - 19

10.3 Responsibilities for Underground Utilities: ..................................................................................................................00700 - 20

10.4 Hazardous Material Conditions:..................................................................................................................................00700 - 20

10.5 Incidents with Archaeological Features: .....................................................................................................................00700 - 20

10.6 Unit Price Work: ..........................................................................................................................................................00700 - 21

10.7 Cash Allowances; Provisionary Allowances: ..............................................................................................................00700 - 21

10.8 Change Orders; Change Authorizations: ....................................................................................................................00700 - 21

ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN

CONTRACT TIME ..........................................................................................................................................00700 - 22

11.1 General Provisions:.....................................................................................................................................................00700 - 22

11.2 Changes in Contract Time: .........................................................................................................................................00700 - 22

11.3 Methods for Making Adjustments in Contract Price: ...................................................................................................00700 - 22

11.4 Labor, Subcontract and Material/Equipment Costs: ...................................................................................................00700 - 23

11.5 Construction Equipment Costs: ..................................................................................................................................00700 - 23

11.6 Rented or Leased Construction Equipment: ...............................................................................................................00700 - 23

11.7 Owned Construction Equipment: ................................................................................................................................00700 - 24

11.8 General Conditions Costs: ..........................................................................................................................................00700 - 24

11.9 Limitations on Allowable Costs: ..................................................................................................................................00700 - 24

11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): .......................00700 - 24

11.11 Limits on the Fee for the Work Involved: ....................................................................................................................00700 - 25

11.12 Fee for Unabsorbed Home Office Overhead: .............................................................................................................00700 - 25

11.13 Changes in Contract Time for Early Completion:........................................................................................................00700 - 25

11.14 Access to Records: .....................................................................................................................................................00700 - 26

11.15 Price Reduction for Defective Cost and Pricing Data: ................................................................................................00700 - 26

ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT ................................................................................................00700 - 26

12.1. Schedule of Values: ....................................................................................................................................................00700 - 26

12.2 Requests for Payment: ...............................................................................................................................................00700 - 27

12.3 Review of Request for Payment; Intent of Review:.....................................................................................................00700 - 27

12.4 Refusal to Make or to Recommend Payment: ............................................................................................................00700 - 27

12.5 Final Request for Payment: ........................................................................................................................................00700 - 27

12.6 Final Payment and Acceptance: .................................................................................................................................00700 - 28

12.7 Contractor’s Continuing Obligation: ..........................................................................................................................00700 - 28

12.8 Waiver of Claims: ........................................................................................................................................................00700 - 28

ARTICLE 13 OTHER WORK ...............................................................................................................................................00700 - 28

13.1 Related Work at Site: ..................................................................................................................................................00700 - 28

13.2 Coordination Requirements: .......................................................................................................................................00700 - 29

13.3 Claims Between the Contractor and Other Parties: ..................................................................................................00700 - 29

MICHSPEC DTMB 00010 4 (Rev. 2/19)

ARTICLE 14 TERMINATION ...............................................................................................................................................00700 - 29

14.1 Notice Requiring Assurance of Due Performance: .....................................................................................................00700 - 29

14.2 Contractor Default and Termination for Cause:.........................................................................................................00700 - 30

14.3 Surety Default: ............................................................................................................................................................00700 - 31

14.4 Termination for Convenience of the Owner:...............................................................................................................00700 - 31

14.5 The Contractor May Suspend Work: .........................................................................................................................00700 - 31

ARTICLE 15 DISPUTES......................................................................................................................................................00700 - 31

15.1 Claims Under This Article: ..........................................................................................................................................00700 - 31

15.2 Requirement for Certification of Contractor Claims:..................................................................................................00700 - 32

15.3 Recommendations or Decisions from the Professional: ...........................................................................................00700 - 32

15.4 Determinations by the Director-DCD: ........................................................................................................................00700 - 32

15.5 Supplements to AAA Arbitration: ................................................................................................................................00700 - 33

15.6 Interest on a Judgment; Payment of Judgment: .........................................................................................................00700 - 33

15.7 Venue; Flow-Through Provision:.................................................................................................................................00700 - 33

SECTION 00800 SUPPLEMENTARY CONDITIONS ........................................................................................................00800 - 1

SECTION 01310 PROGRESS SCHEDULE .......................................................................................................................01310 - 1

HDR Project No. 10052369 2/20/2019 Thompson State Fish Hatchery 00 01 10 - 1 Table of Contents 1

TABLE OF CONTENTS

SECTIONS PAGES

DIVISION 01 — GENERAL REQUIREMENTS

01 11 00 - SUMMARY OF WORK ____________________________________________________________5 01 23 00 - ALTERNATES ___________________________________________________________________3 01 26 13 - REQUEST FOR INTERPRETATION (RFI) ____________________________________________3 01 30 00 - SPECIAL CONDITIONS____________________________________________________________4 01 31 19 - PROJECT MEETINGS _____________________________________________________________3 01 32 17 - CONSTRUCTION PROGRESS SCHEDULE ___________________________________________4 01 33 00 - SUBMITTALS ___________________________________________________________________9 01 33 04 - OPERATIONS AND MAINTENANCE MANUALS ____________________________________12 01 35 05 - ENVIRONMENTAL PROTECTION DEEP WELL ______________________________________3 01 42 13 - STANDARD ABBREVIATIONS AND SYMBOLS ______________________________________1 01 45 00 - QUALITY ASSURANCE AND CONTROL ____________________________________________2 01 45 23 - TESTS AND INSPECTIONS ________________________________________________________4 01 45 33 - SPECIAL INSPECTIONS AND TESTING PROGRAM __________________________________11 01 61 03 - EQUIPMENT - BASIC REQUIREMENTS ____________________________________________17 01 65 50 - PRODUCT DELIVERY, STORAGE, AND HANDLING __________________________________2 01 71 14 - MOBILIZATION AND DEMOBILIZATION ___________________________________________2 01 73 20 - OPENINGS AND PENETRATIONS IN CONSTRUCTION _______________________________6 01 73 29 - DEMOLITION, CUTTING AND PATCHING __________________________________________5 01 74 13 - CLEANING DEEP WELL __________________________________________________________2 01 74 23 - CLEANING ______________________________________________________________________4 01 75 00 - FACILITY START-UP _____________________________________________________________8 01 77 00 - CONTRACT CLOSEOUT __________________________________________________________6 01 78 43 - SPARE PARTS, TOOLS AND MAINTENANCE MATERIALS ____________________________2 01 81 10 - WIND AND SEISMIC DESIGN CRITERIA ____________________________________________2 01 91 03 - COMPONENT AND SYSTEM COMMISSIONING ______________________________________3

DIVISION 02 — EXISTING CONDITIONS

02 00 10 - EXISTING CONDITIONS __________________________________________________________3 02 01 00 - SUBSURFACE INVESTIGATION ___________________________________________________1

DIVISION 03 — CONCRETE

03 05 05 - CONCRETE TESTING AND INSPECTION ____________________________________________7 03 11 13 - FORMWORK ____________________________________________________________________5 03 15 19 - ANCHORAGE TO CONCRETE _____________________________________________________7 03 21 00 - REINFORCEMENT _______________________________________________________________5 03 31 30 - CONCRETE, MATERIALS AND PROPORTIONING ____________________________________8 03 31 31 - CONCRETE MIXING, PLACING, JOINTING, AND CURING ___________________________14 03 35 00 - CONCRETE FINISHING AND REPAIR OF SURFACE DEFECTS _________________________8

DIVISION 04 — MASONRY

04 01 20 - MASONRY CLEANING ___________________________________________________________2 04 05 13 - MASONRY MORTAR AND GROUT _________________________________________________4 04 05 23 - MASONRY ACCESSORIES _______________________________________________________13 04 05 50 - COLD AND HOT WEATHER MASONRY CONSTRUCTION ____________________________3 04 22 00 - CONCRETE MASONRY ___________________________________________________________7

DIVISION 05 — METALS

05 12 00 - STRUCTURAL STEEL ___________________________________________________________11 05 50 00 - METAL FABRICATIONS _________________________________________________________30 05 52 02 - ALUMINUM RAILINGS ___________________________________________________________6

Thompson State Fish Hatchery 00 01 10 - 2 Table of Contents 1

DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES

06 10 53 - ROUGH CARPENTRY ____________________________________________________________13 06 17 53 - METAL PLATE CONNECTED WOOD TRUSSES ______________________________________4 06 82 00 - FIBERGLASS REINFORCED PLASTIC FABRICATIONS _______________________________0

DIVISION 07 — THERMAL AND MOISTURE PROTECTION

07 16 04 - CONCRETE FLOOR MOISTURE TESTING ___________________________________________4 07 16 05 - WATER VAPOR EMISSION CONTROL SYSTEM _____________________________________4 07 21 00 - BUILDING INSULATION __________________________________________________________4 07 21 60 - THERMALLY BROKEN METAL FRAME SYSTEM ____________________________________2 07 26 00 - UNDER SLAB VAPOR RETARDER__________________________________________________2 07 27 26 - FLUID APPLIED AIR BARRIER - VAPOR RESISTIVE _________________________________4 07 31 00 - FIBERGLASS SHINGLE ROOFING __________________________________________________4 07 42 13 - PREFORMED METAL WALL PANELS ______________________________________________4 07 62 00 - FLASHING AND SHEET METAL____________________________________________________4 07 84 00 - FIRESTOPPING __________________________________________________________________4 07 92 00 - JOINT SEALANTS ________________________________________________________________6

DIVISION 08 — OPENINGS

08 15 00 - FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES ____________________5 08 33 13 - ROLLING COUNTER SHUTTER ____________________________________________________2 08 36 15 - OVERHEAD DOOR - SECTIONAL STEEL ____________________________________________3 08 70 00 - FINISH HARDWARE ______________________________________________________________9 08 81 00 - GLASS AND GLAZING __________________________________________________________16 08 90 00 - LOUVERS AND VENTS ___________________________________________________________3

DIVISION 09 — FINISHES

09 29 00 - GYPSUM BOARD ________________________________________________________________4 09 77 61 - FIBERGLASS REINFORCED PLASTIC (FRP) PANELS _________________________________2 09 91 10 - ARCHITECTURAL PAINTING _____________________________________________________9 09 96 00 - HIGH PERFORMANCE INDUSTRIAL COATINGS ____________________________________12

DIVISION 10 — SPECIALTIES

10 14 23 - SIGNAGE _______________________________________________________________________9 10 28 13 - TOILET AND BATH ACCESSORIES _________________________________________________2 10 44 33 - FIRE PROTECTION SPECIALTIES __________________________________________________2 10 72 50 - PREDATOR CONTROL NETTING __________________________________________________4

DIVISION 11 — EQUIPMENT

11 15 51 - FIBERGLASS REARING TANKS & AQUACULTURE EQUIPMENT ______________________5

DIVISION 13 — SPECIAL CONSTRUCTION

13 13 10 - AQUACULTURE COATING ________________________________________________________5 13 34 00 - POST FRAME BUILDING SYSTEMS _______________________________________________22

DIVISION 22 — PLUMBING

22 05 23 - GENERAL-DUTY VALVES FOR PLUMBING PIPING __________________________________3 22 05 29 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT ________________9 22 05 48 - VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT ______4 22 05 53 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT _________________________4 22 20 00 - PLUMBING FIXTURES AND EQUIPMENT __________________________________________11

DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING

23 05 13 - COMMON MOTOR REQUIREMENTS FOR PLUMBING AND HVAC EQUIPMENT _________9

23 05 53 - IDENTIFICATION FOR HVAC, DUCTWORK, PIPING AND HVAC EQUIPMENT __________5 23 05 93 - HVAC SYSTEMS - BALANCING AND TESTING ______________________________________4 23 21 00 - HYDRONIC SPECIALTIES _________________________________________________________6

Thompson State Fish Hatchery 00 01 10 - 3 Table of Contents 1

23 30 00 - HEATING AND VENTILATION _____________________________________________________9 23 52 15 - STAINLESS CONDENSING WATER HEATERS _______________________________________3 23 74 36 - REFRIGERANT PIPING SYSTEM ___________________________________________________6

DIVISION 26 — ELECTRICAL

26 05 00 - ELECTRICAL - BASIC REQUIREMENTS ____________________________________________5 26 05 19 - WIRE AND CABLE - 600 VOLT AND BELOW ________________________________________8 26 05 26 - GROUNDING AND BONDING _____________________________________________________5 26 05 33 - RACEWAYS AND BOXES ________________________________________________________13 26 05 43 - ELECTRICAL - EXTERIOR UNDERGROUND _______________________________________10 26 08 13 - ACCEPTANCE TESTING __________________________________________________________4 26 09 16 - CONTROL EQUIPMENT ACCESSORIES ____________________________________________10 26 22 13 - DRY-TYPE TRANSFORMERS ______________________________________________________3 26 24 16 - PANELBOARDS _________________________________________________________________3 26 24 19 - MOTOR CONTROL EQUIPMENT ___________________________________________________5 26 27 26 - WIRING DEVICES ________________________________________________________________4 26 28 00 - OVERCURRENT AND SHORT CIRCUIT PROTECTIVE DEVICES _______________________3 26 28 16 - SAFETY SWITCHES ______________________________________________________________5 26 29 23 - VARIABLE FREQUENCY DRIVES - LOW VOLTAGE _________________________________17 26 32 14 - ENGINE GENERATOR - DIESEL ___________________________________________________9 26 36 00 - TRANSFER SWITCHES ___________________________________________________________3 26 43 13 - LOW VOLTAGE SURGE PROTECTION DEVICES (SPD) _______________________________7 26 50 00 - INTERIOR AND EXTERIOR LIGHTING ____________________________________________25

DIVISION 31 — EARTHWORK

31 10 00 - SITE CLEARING _________________________________________________________________3 31 23 00 - EARTHWORK __________________________________________________________________16 31 23 19 - DEWATERING ___________________________________________________________________3 31 23 33 - TRENCHING, BACKFILLING, AND COMPACTING FOR UTILITIES _____________________7 31 25 00 - SOIL EROSION AND SEDIMENT CONTROL _________________________________________3 31 32 19 - GEOTEXTILES ___________________________________________________________________4

DIVISION 32 — EXTERIOR IMPROVEMENTS

32 12 16 - ASPHALTIC CONCRETE VEHICULAR PAVING ______________________________________3 32 15 40 - CRUSHED STONE SURFACING ____________________________________________________3 32 16 23 - CONCRETE SIDEWALK AND STEPS _______________________________________________6 32 31 13 - CHAIN LINK FENCE AND GATES __________________________________________________4 32 91 13 - TOPSOILING AND FINISHED GRADING ____________________________________________2 32 92 00 - SEEDING _______________________________________________________________________3

DIVISION 33 — UTILITIES

33 05 16 - PRECAST CONCRETE MANHOLE STRUCTURES ____________________________________3 33 11 15 - WATER WELLS __________________________________________________________________9 33 11 16 - WATER WELLS - DOMESTIC ______________________________________________________7 33 11 36 - SUBMERSIBLE CENTRIFUGAL WELL PUMPS _______________________________________3 33 47 13 - EPDM POND LINERS _____________________________________________________________8 33 52 10 - SERVICE PIPING - FUEL SYSTEMS ________________________________________________16 33 56 13 - ABOVEGROUND FUEL STORAGE TANKS __________________________________________9

DIVISION 40 — PROCESS INTERCONNECTIONS

40 05 00 - PIPE AND PIPE FITTINGS BASIC REQUIREMENTS __________________________________11 40 05 07 - PIPE SUPPORT SYSTEMS _________________________________________________________5 40 05 17 - PIPE - COPPER ___________________________________________________________________2 40 05 19 - PIPE - DUCTILE __________________________________________________________________5 40 05 24 - PIPE STEEL _____________________________________________________________________5 40 05 31 - PIPE PLASTIC ___________________________________________________________________4 40 05 33 - PIPE - POLYETHYLENE (HDPE) ____________________________________________________6

Thompson State Fish Hatchery 00 01 10 - 4 Table of Contents 1

40 05 51 - VALVES BASIC REQUIREMENTS __________________________________________________5 40 05 61 - GATE VALVES __________________________________________________________________2 40 05 62 - PLUG VALVES __________________________________________________________________2 40 05 63 - BALL VALVES __________________________________________________________________5 40 05 64 - BUTTERFLY VALVES ____________________________________________________________3 40 05 65 - GLOBE VALVES _________________________________________________________________2 40 05 66 - FLAP VALVES AND TRIPLE DUTY VALVES ________________________________________2 40 20 50 - OXYGEN DISTRIBUTION & DISSOLUTION _________________________________________4 40 70 00 - WATER FLOW METERS ___________________________________________________________4

DIVISION 41 — MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 13 00 - BULK MATERIAL FEEDERS _______________________________________________________3

DIVISION 42 — PROCESS HEATING, COOLING, AND DRYING EQUIPMENT

42 22 29 - INCUBATION CHILLING SYSTEMS ________________________________________________3

DIVISION 43 — PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE

EQUIPMENT

43 11 34 - AQUACULTURE AERATION _______________________________________________________5 43 21 00 - PUMPING EQUIPMENT BASIC REQUIREMENTS _____________________________________2 43 21 13 - INLINE CENTRIFUGAL PUMPS ____________________________________________________2 43 25 13 - PUMPING EQUIPMENT - SEPTIC SYSTEM PUMP _____________________________________3

APPENDIX - BOUND HEREIN

A. Geotechnical Report Thompson State Fish Hatchery, Northwest Design Group, July 2017 B. Report of Geotechnical Investigation for Proposed State Fish Hatchery Improvements, November 2018

DRAWINGS - BOUND SEPARATELY SHEETS THRU

GENERAL G0.0 to G0.5, G1.1 to G1.4 DEMOLITION X1.1 to X1.2 CIVIL C1.1 to C1.5, C1.7 to C1.9, C1.11 TO C1.22 STRUCTURAL S0.1 to S0.5, S2.1, S3.1, S4.1 to S4.5, S7.1 to S7.3, S8.1 to S8.8, S9.1 to S9.2 ARCHITECTURAL A0.1 to A0.2, A4.1 to A4.6, A5.1 to A5.2, A99.1 to A99.2 PLUMBING P-4.1 to P4.2 PROCESS D0.1, D1.1 to D1.5, D3.1 to D3.3, D4.1 to D4.4, D8.1 to D8.4, D0.1 to D9.2 MECHANICAL M4.1 to M4.2 ELECTRICAL E0.1, E1.1 to E1.3, E2.1 to E2.5, E3.1, E4.1 to E4.4, E5.1, E99.1 to E99.10

STATE OF MICHIGAN (OWNER AND CONTRACTOR) GLOSSARY

MICHSPEC DTMB 00020 - 1 (Rev. 2/19)

SECTION 00020 GLOSSARY

1.1 Defined Terms:

1.1.1. The following terms or relative pronouns used in

Division 0 of the Specifications have these intent and meanings:

ActivityAn element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.

AddendaWritten instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications and other information into the Bidding Documents. An Addendum issued after Bid opening to those Bidders who actually submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.

AgreementThe written agreement between the Owner and Contractor covering the Work to be furnished and performed.

AlternateRefers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.

Apparent Low Bidder: Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates. Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s preference is the lowest Bidder is considered the Apparent Low Bidder.

Archaeological FeatureAny prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.

As-Planned ScheduleIs the…