Addendum 1 TSFH.pdf
PDF 2 MB Posted
- Solicitation number
- RFQ 171 190000000251 3
- Issued by
- Sanilac County, Michigan
About this file
This Addendum No. 1, dated March 15, 2019, modifies the bidding documents for a project by the Michigan Department of Natural Resources to renovate and construct a new cool water facility at Thompson State Fish Hatchery in Manistique, Michigan. The project involves comprehensive renovation of the existing coldwater hatchery and construction of new cool water facility infrastructure, including propane tanks, horizontal directional drilling for piping, pipe insulation systems, hatching jars, and fry capture tanks. The addendum incorporates revisions to project specifications, drawings, and technical requirements across multiple divisions. A mandatory pre-bid meeting was held on March 11, 2019, with site tours conducted. Bids were due March 20, 2019, at 2:00 p.m., with the bid submission period having closed before this addendum was issued. Substantial completion is required by August 1, 2020, with entire work completion and readiness for final payment within 30 days thereafter. The project anticipates Notice to Proceed approximately 45 to 60 days after bid submission, pending administrative board approval scheduled for the second and fourth Tuesday of each month.
The project is a lump sum bid with a 5 percent contingency allowance and includes four deductive alternates. No prevailing wage requirements apply. The apparent low bidder must provide a detailed cost breakdown within 15 days of Notice to Proceed. Significant operational constraints govern construction, including requirements to maintain hatchery operations throughout construction, restrict power outages to 15-minute durations with 48-hour advance scheduling, and coordinate work around fish production schedules with highest water demand from February through May and lowest demand from June through September. The contractor is responsible for all temporary power systems, including generator rentals, fuel, and redundant backup power during extended outages. Construction hours are generally 7:00 a.m. to 7:00 p.m. with no Sunday work requested out of respect for nearby residents. The state will provide well pumps for existing shallow wells under a separate contract, metered groundwater supply at 400 gallons per minute for drilling, and electric service for construction power; the contractor pays for associated electricity consumption and all other temporary utilities and consumables.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HDR Project No. 10052369 ADDEDNDUM 1 - 1 03/15/19
Thompson State Fish Hatchery
Addendum No. 1
DATE: March 15, 2019
HDR Michigan, Inc.
Phone: (217) 585-8300
TO: PROSPECTIVE BIDDERS
SUBJECT: ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS FOR
File No. 751/16262.JAG
Index No. 11856 & 83340
Renovate and Construct New Cool Water Facility
Thompson State Fish Hatchery
944 S. State Highway M149
Manistique, Michigan 49854
This addendum forms a part of the bidding and contract documents and modifies the original bidding documents, dated February 20, 2019. Acknowledge receipt of this addendum by number on the space provided on BID
SUMMARY. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION.
The Pre-Bid meeting was held at Thompson State Fish Hatchery on March 11, 2019 at 2:00 pm (see attached minutes and attendance sheet). At the completion of the technical discussion of the project, several attendees walked the construction area to inspect the site. The meeting was intended to provide a general introduction to the project and the site conditions.
PROJECT MANUAL:
1. Section 00 01 10, Table of Contents.
Division 23. ADD “23 13 26 - Propane Tanks & Related 2 ”
Division 33. ADD “33 05 07 – Horizontal Direction Drilling 10”
Division 40. ADD “40 42 00 – Pipe, Duct and Equipment Insulation 6”
Division 43. ADD “43 41 26 – Jars & Aluminum Fry Tanks 2”
Drawings, Mechanical. ADD M2.1 to Drawing List.
2. Section 00800 – Appendix 1, Special Working Conditions. ADD the following Special Working Conditions:
“7.3 This is an operational hatchery that must remain open, and fully operational during the construction period. Special care shall be exercised when working around the fish or when working on any process equipment used for fish production.
7.4 Due to the Hatchery’s fish production schedules, it is recommended that most of the work associated with power and control at the Coldwater Facility take place from June 1 to September 1. These are the periods of the lowest water demand required to support the fish on station. From February 1 to
May 31, the hatchery has the highest demand for water. During this time period, power interruptions will not be allowed and all controls and alarms including the standby generator and automatic transfer switch must remain fully operational at all times.
7.5 All power outages at the Coldwater Facility must be scheduled in writing, at least 48 hours in advance of the outage. The outage must be scheduled at a time and duration agreed to by the Hatchery manager, Jan VanAmberg (vanambergj@michigan.gov) and the maintenance supervisor, Tony
Rabitaille (rabitaillet@michigan.gov).
7.6 In general, outages shall be limited to a 15 minute duration with appropriate breaks between outages, (approved by the manager in consultation with staff) and the automatic stand-by emergency generator must be functional at all times. If the stand-by generator is not fully operational, the
HDR Project No. 10052369 ADDEDNDUM 1 - 2 03/15/19 temporary power systems shall include redundant generators with automatic controls should the lead generator fail or the utility power fail.
7.7 During periods when longer outages are required, provisions for temporary power must be installed in advance of the outage. Provide generator(s) of sufficient size during these periods when longer outages are required such as when replacing main power feeders to the Coldwater Facility or the feeders to the Coldwater Facility Motor Control Centers. If any portion of the hatchery is proposed to be powered by the temporary generator, than an equally sized temporary back-up generator with automatic controls must be provided and connected so that in the event the primary (temporary) generator fails, the back-up generator can power the hatchery. Note that the size of the temporary power generators will depend on where the unit is connected and the loads it will be powering. The electric loads and the horsepower’s shown on the drawing shall be the basis of the generator sizing for temporary power.
7.8 The Contractor is responsible for all cost associated with providing temporary power including generator rentals, temporary power connections, fuel, or other consumables required to provide temporary power. The Contractor is responsible for operation and maintenance of these systems.
The Contractor shall coordinate all work with the Hatchery to insure they are trained and know who to contact should a problem arise.
7.9 For the installation of Motor Control Center, MCC-1 and MCC-2, coordinate the replacement work with the Hatchery. Provide temporary power and temporary motor controls as required to keep those systems required for fish production operational during the replacement work. The replacement work shall be scheduled in writing at least 2 weeks in advance of the work.
7.10 The hatchery’s process alarm and instrumentation system at the Coldwater Facility shall be fully functional throughout the construction period. Coordinate all wiring and connections with DNR’s
SCADA personnel to insure critical process alarms are functional.“
3. Section 01 30 00, Special Conditions. Paragraph 1.8. ADD:
“D. At the Coldwater Facility, the contractor may use electric power from the Hatchery’s metered electric service for construction power as long as the use of the Hatchery’s electric power in no way disrupts the hatchery’s operation. The contractor is responsible for providing suitable power for the hatchery operation including back up power as called out in Addended Section 00800 of the project specification. Because this is an operating Hatchery that must remain open during construction, special care shall be exercised not to overload the existing power circuits or interrupt power needed for fish production.
E. At the Coolwater facility, the State’s pumps installed in Wells’ S-4 and S-5 may be used for filling the new ponds for testing. The contractor is responsible for providing power to run the wells and is also responsible for paying for the electricity needed to run the pumps to fill the ponds.”
4. Section 02 01 00, Subsurface Investigation.
Paragraph 1.2.B.1.c. REPLACE “dated XXX” WITH “November 2018” and “bount” WITH “bound”.
Paragraph 1.2.B.1.d. CHANGE “Not separate payment….” TO “No separate payment….”.
5. Section 09 91 10, Architectural Painting.
Paragraph 3.1.A.1. ADD “…except as outlined in 09 96 00, 3.1.B”.
Paragraph 3.1.A.1.a. DELETE.
6. Section 09 96 00, High Performance Coatings, Paragraph 2.4.A., last line of the Table. CHANGE “Series 22”
TO “Series 262”.
7. Section 10 72 50, Predator Control Netting.
Paragraph 1.2.A.2. REPLACE “2. UV Resistant Black Plastic Cable Ties” WITH “2. Stainless Steel Hog
Rings”.
Paragraph 2.1.EE.e. DELETE entire paragraph.
HDR Project No. 10052369 ADDEDNDUM 1 - 3 03/15/19
Paragraph 3.3. A. DELETE “The installation of the cables and netting shall not proceed until the installation of the pond liner and kettle has finished.”
8. Section 12 34 00, Post Frame Building Systems, Paragraph 2.1. ADD to the list of acceptable manufacturers: Cleary Building Corporation, 1814b N Lincoln Rd, Escanaba, MI 49829, Phone (906) 789-
7720.”
9. Section 22 20 00, Plumbing Fixtures and Equipment.
Paragraph 2.1.A.17. ADD “C. Lochinvar.”
Paragraph 2.2. REPLACE Subparagraph F WITH “Provide exposed adjustable thermostatic mixing valves with heat traps and isolation valves per makers recommendations. They will receive 120 F hot water and
47 F cold water and are to deliver 80 F tepid water and cause not more than 10 psi pressure drop. MV-1 shall be sized to deliver 23 gpm and MV-2 sized to deliver standard emergency eyewash flow rate.
Acceptable makers include Leonard, Haws, Bradley and Guardian”.
Paragraph 2.2.S. REPLACE Subparagraph 1 and 2 with the following:
“1. Identified on Drawings as ‘Trench Drain’ and as ‘Drain Channel’. Polymer concrete channels all with factory molded slope, 8-inch minimum depth, 4-inch nominal inside width, medium duty fiberglass grating, radiused bottom, 6-inch vertical bottom outlets as oval adapters, end caps and cleanout shovel with handle.”
Paragraph 2.2, ADD
“T. Scullery sink, free standing 16 gage type 304 stainless steel double compartment sink with backsplash, plugged faucet openings, right & left drain-boards, roto handle drain, adjustable 304 SS legs, overall length not less than 73 inches. Advance Tabco, Elkay and Just are acceptable makers.”
10. Section 23 13 26, Propane Tanks & Related. ADD new attached specification.
11. Section 23 30 00, Heating and Ventilation.
Paragraph 2.1.A.10. ADD “C. Modine.”
Paragraph 2.10. CHANGE title to “Heat Recovery Ventilator HRV-1”
Paragraph 2.10.E. ADD “Provide remote digital controller to control recirculation, ventilation and at least
3 speeds. Unit shall be configured for connection of horizontal duct.”
Paragraph 2.10.F. REPLACE with “There shall be an automatic recirculation defrost.”
Paragraph 2.10.K. CHANGE “50 inches L” and “37 inches W. 366 cfm” and “200 lbs” and “63% effective”, respectively TO “72 inches L” and “47 inches wide, 705 cfm” and “240 lbs” and “57% sensible efficiency at
690 cfm and 35 oF outdoor air supply temp.”
Paragraph 2.10.L. DELETE.
Paragraph 2.11. REPLACE with Heat Recovery Ventilators HRV-2 and HRV-3: Same as HRV-1 except case may be 24 gage, insulation may be 1” expanded styrene, minimum 78% sensible efficiency at 157 cfm and
32 F outdoor air supply temp. HRV-2 shall be rated at least 182 cfm at 0.375” SP. HRV-3 shall be rated at least 260 cfm at 0.375 cfm. Unit shall be configured for connection of horizontal 6” round ducts. Unit shall not exceed 23” H x 18” deep. Provide white adjustable round supply diffusers on the ends of the 6” round field installed supply and return ducts. Provide aluminum or factory painted galv. steel intake wall caps with bird screens and exhaust wall caps with backdraft dampers not necessarily by HRV supplier.
Paragraph 2.13.G. CHANGE “120 volt with 1,000 watt” TO “240 volt 1 ph 2,000 watt” and CHANGE “120 volt with 1,440 watt” TO “240 volt 1 ph with 3,000 watt.”
12. Section 23 52 15, Stainless Condensing Water Heater, Paragraph 2.2. REPLACE Subparagraph F WITH
“Capacity and pumps: Each heater shall have 800 MBH input. Pumps are specified in Section 43 21 13.”
13. Section 31 23 00, Earthwork. REPLACE specification in entirety with attached specification.
14. Section 32 16 23, Concrete Sidewalk and Steps, Paragraph 3.1.A.3.a. ADD “or Class II fill as directed by
Engineer” after material.
HDR Project No. 10052369 ADDEDNDUM 1 - 4 03/15/19
15. Section 32 15 40, Crushed Stone Surfacing. REPLACE specification in entirety with attached specification.
16. Section 21 91 13, Topsoiling and Finished Grading, 2.1.A.1. ADD “Using stockpiled topsoil is allowed.”
17. Section 33 05 07, Horizontal Directional Drilling. ADD new attached specification.
18. Section 33 11 15, Water Wells, Paragraph 3.1.B.6. DELETE and REPLACE with:
“Allow Michigan DEQ/Geological Survey to complete downhole geophysics surveys on the finished well.
Assume only one mobilization by DEQ/Geological Survey after the well has been drilled to total depth.
Contractor will coordinate the timing of the downhole geophysics with DEQ/Geological Survey.
Contractor’s cost incurred for being present during downhole geophysics will be incorporated into the bid.”
19. Section 33 11 16, Water Wells – Domestic, 1.1.A.1. CHANGE “10 gpm” to “16 gpm”.
20. Section 33 11 36, Submersible Centrifugal Well Pumps.
Paragraph 1.1.A.1.b.2). CHANGE to “2.2 Process Deep Well Submersible Turbine Pumps & Check
Valves”
Paragraph 2.2. ADD “Process Deep Well” to the beginning of the title.
Paragraph 2.3. DELETE Subparagraphs A and B. REPLACE WITH “Domestic well pump and domestic pitless unit shall be provided including metal cased potable water submersible turbine 4-inch OD pump set
85’ below grade with stainless steel shaft, stainless intake screen, stainless trim, rated at least 16 gpm at
165’ TDH with a non-overloading 1 hp maximum 480 volt 3-phase 4-inch OD motor with stainless steel housing and with lead free well pump, 1-inch check valve and 1-inch black iron drop pipe to lead free flowing pitless unit approved in Michigan, adapted to 6-inch well casing with well cap 1 foot above grade and 1-inch discharge 5 feet below grade.”
Paragraph 2.4.A. ADD “Process deep well shall have 304 stainless steel SCH 40 drop pipe.”
21. Section 33 31 13, Chain Link Fence and Gates, Paragraph 2.1.A.1.a. CHANGE “ASTM A392 zinc-coated steel” with “ASTM A491, Aluminum-Coated Steel”.
22. Section 33 47 13, EPDM Pond Liners, Paragraph 3.2, ADD:
“D. Pond Leak Testing: Fill each pond to the normal operating level.
1. Prior to filling each pond, measure and record the discharges from the underdrain and dewatering systems.
2. Fill each pond to the normal operating level, then close/plug all inlets and outlets.
3. Monitor pond leakage from water elevation drops and from the underdrain system discharge identifying changes in water quantity before and after filling. Water elevation/volume shall be measured two days after filling.
4. The leak rate of any pond shall be less than 100 gallons per day calculated by change in water level or increased rate of discharge from the underdrain system.
5. Inspect and repair leaking seams/attachments until any single pond’s leakage rate is under 100 gallons per day.
6. Any pond leakage that results in a visible wet spot or leakage on the side slope of a pond embankment will be considered to be unacceptable regardless of the leakage rate.”
23. Section 40 05 00, Pipe and Fittings Basic Requirements, Paragraph 3.7. REPLACE Subparagraphs A, B, C and D with:
“Except where Drawings indicate otherwise:
Process Drains (DRN) in and under the Cool Water Building shall be SCH 40 PVC with DWV fittings.
Process Drains (DRN) and Drain and Fish Transfer (DFT) not in or under the Cool Water Building shall be
SDR 35 PVC.
HDR Project No. 10052369 ADDEDNDUM 1 - 5 03/15/19
Buried Aerated Water Supply (AWS) piping shall be SDR 35 PVC.
Buried Process Well Water Non-potable (WWN) not also marked for HDD (Horizontally Directionally
Drilled) shall be SDR 26 PVC pressure pipe or C900 PVC with solvent cemented PVC fittings or restrained ductile iron fittings.
Process Well Water Non-potable (WWN) marked for HDD shall be IPS or DIPS DR 21 HDPE with fused IPS or DIPS DR 17 or DR 21 fittings.
Aerated Water Supply (AWS) at Pond Kettles downstream of buried gate valves shall be DIPS DR 21 HDPE with fused DIPS DR 17 or DR 21 fittings.
Buried Potable Water Cold (PWC) piping shall be SCH 40 PVC.
Exposed Non-potable Well Water (WWN), Process Chilled Water Supply (CWS), non-buried Domestic Cold
Water (CW), and non-buried Aerated Water Supply (AWS) piping, except at pond kettles, shall be SCH 80
PVC.
Process Heated Water Supply (HWS), Domestic Hot Water (HW) and Domestic Hot Water Return (HWR) shall be SCH 80 CPVC.
Water heater Flues and combustion air intakes (FLU) shall be SCH 40 or 80 CPVC.
Sanitary (SAN) drain piping shall be SCH 40 PVC with DWV fittings, except the pumped portion from submersible sewage to seepage field distribution box which shall have solvent cemented pressure fittings.
Low Pressure Air (LPA) piping and valves shall be SCH 80 CPVC from a manufacturer that has pre-written documentation condoning it for oil free air handling to 25 psi. IPEX Duraplus ABS is also acceptable.
Hydrogen Peroxide (PRX) piping including fittings and valves shall all be rated at least 125 psi and shall be
316 Stainless Steel 3/8” OD tubing with flared fittings. Valves for this piping shall be 316 stainless steel ball valves with Teflon and Viton seats/seals or other seals/seats compatible with hydrogen peroxide & water and Formaldehyde & water.”
24. Section 40 05 61, Gate Valves, Paragraph 2. ADD “2.5 PVC Knife Gate Valves shall be gray PVC with stainless trim and pull handle. Makers include Valterra, Praher and Cepex.”
25. Section 40 05 63, Ball Valves.
Paragraph 2.3.B.1. ADD “CPVC on hot, heated or heated return water.”
Paragraph 2.3. ADD “D. Full port except where drawings indicate V-port in which case makers include
Hayward (characterized port), Plastomatic, Valtorc and GF Fischer.”
26. Section 40 20 50, Oxygen Distribution & Dissolution, Paragraph 2.1. ADD “E. Add to manifold an outdoor pressure switch with isolation ball valve. Switch shall be adjustable from at least 10 – 40 psi, rated at least
100 psi with Form C contact. DNR will connect monitoring wiring.”
27. Section 40 42 00, Pipe, Duct and Equipment Insulation. ADD new attached specification.
28. Section 40 70 00, Water Flow Meters, Paragraph 1.1. ADD “C. All base bid except meter tagged WM-2 which is part of Deductive Alternate 4.”
29. Section 41 13 00, Bulk Material Feeder.
ADD Paragraph 1.2.
“1.2 QUALITY ASSURANCE
A. Qualifications – Manufacturer must provide evidence of at least ten feeding system installations on coldwater facilities and have been in fish feeding system manufacturing for at least 10 years.”
RENUMBER Paragraph “1.2” TO “1.3”.
Paragraph 2.1.E.
HDR Project No. 10052369 ADDEDNDUM 1 - 6 03/15/19
REPLACE “Positive displacement blower unit, inline air inlet filter with connection for 8” dia. Insulated intake duct (air supply from building exterior)” WITH “Regenerative 15 hp blower” and DELETE “PD” and
DELETE “The blower unit shall be enclosed in sound attenuated enclosure and shall include cooling exhaust fan as required for operation in the space it is located.”
ADD “Blower shall be rated for 80.5 dB(A) noise or less measured at 1 m distance with inlet and outlet ports piped, in accordance to ISO 3744G3. Provide outdoor inlet filter/silencer for connection to 4 inch diameter pipe. Package shall include aftercooler.”
Paragraph 2.1. ADD:
“H. A platform shall be provided, 32 inches above the finished floor to assist in silo filling complete with ladder and railing.
I. Skid shall be arranged with loading platform north central, control panels west and blower east.”
Paragraph 2.5.A. CHANGE “schedule 10,304 stainless steel pipe” To “16 gauge 304 stainless steel tube”
Paragraph 2.5, ADD:
“C. Provide a minimum of three feed drops per 100 foot raceway.
D. Join stainless tubing with 3-bolt sleeve coupling with grounding strip AND gasket protectors
(protection sleeves) all in 304 stainless steel with black or white neoprene gaskets. Suppliers include
Morris Coupling Company, Kice and H-P Products.”
30. Section 43 41 26, Jars & Aluminum Fry Tanks. ADD new attached specification.
PROJECT DRAWINGS:
1. Sheet G0.0, Cover Sheet – Index. ADD “Sheet M2.1 Generator Aids.”
2. Sheet G0.4.
Process Piping Legend, ADD “PRX = Hydrogen Peroxide Piping”.
Piping Symbology, Valves:
a. A line or pair of lines through a filled circle with an ‘L’ shaped line on one side represents a ball valve.
b. A line or pair of lines through the long sides of an unfilled acute triangle represents a PVC knife gate valve.
c. A line interrupted by a pair of tick marks with an unfilled circle between them with an ‘L’ line on one side represents a ball valve.
General Notes. “4. Insulate piping and ducts per Section 40 42 00 Pipe Duct and Equipment Insulation.”
3. Sheet C1.2, Existing Hatchery Facility Site Plan, General Notes. ADD “2. Install construction fence around construction limits for work shown at the existing hatchery facility and additionally as selected by the
Contractor to keep the public out of construction areas.”
4. Sheet C1.12, Cool Water Facility Dewatering Plan, Detail 1. CHANGE the dimension of free draining gravel above the pipe “VARIES” to “5 feet”.
5. Sheet C1.20, Typical Pond Liner Details, Detail 3. ADD “Note: Immediately adjacent to netting structure columns adjust liner trench width and alignment accordingly. Do not place liner trench on pond slope.”
6. Sheet C1.21, Site Details.
Detail 1. REPLACE “2-inch SQ Gate Frame” WITH “2-inch Gate Frame” and DELETE “3 inch SQ” from Gate
Post table.
Detail 3. CHANGE “Brace Rail” TO “Tension Wire”.
7. Sheet S0.2, Typical Structural Details, Detail 3.
HDR Project No. 10052369 ADDEDNDUM 1 - 7 03/15/19
2-inch perimeter insulation should be shown on the exterior side of the foundation wall.
8. Sheet S2.1, Existing Rearing Tank Renovation.
Notes. ADD “6. Remove existing screen and frames and save for reuse. Existing frames are screwed into the concrete tank wall and caulked. Clean concrete surface thoroughly prior to coating installation. One frame per tank. Reinstall frames and screen following coating installation.”
Notes. ADD “7. Openings for standpipes and embedded screen guides and are not to be coated. Cover and protect as required. One standpipe and one pair of embedded guides per tank.”
Notes. ADD “8. Protect surrounding area from preparation and coating operations. Clean floors and surrounding area following coating installation.”
The Feed Storage Room 6, is the room located in the south east corner of the Hatchery Building. Because of the noise from the low pressure air blower that is part of the fish feed delivery system to be installed in the room, install a sound deadening system on the east wall of the Feed Storage Room. The east wall of the Feed Storage Room is a CMU block wall to a height of approximately 11 feet, and open to the roof structure above at a height of approximately 20 feet above the finished floor (AFF). Along the east wall there is also a suspended acoustical ceiling at about 9 feet AFF. Construct the sound deadening system with 3 5/8” metal studs at 24” O.C. from the floor to the roof structure along the east wall only. Frame around the existing circuit breaker panel. Leave a minimum 1/2" gap between the studs and the face of the existing CMU wall. Provide 3 1/2” unfaced sound attenuation batt insulation in the stud spaces.
Install 1/2" metal resilient channels (Clark Dietrich “RC Deluxe” or equal) to the outside face of metal studs. Then install (2) layers 5/8” Type X gypsum board over the resilient channels up to the roof structure and finish with FRP panels to a height of 10 feet AFF. Rework the existing suspended acoustical ceiling as required to install the sound deadening system. Install acoustical sealant around all wall penetrations and joints. Extend water spigot to match new wall surface, as needed.
9. Sheet S4.1, Cool Water Building Foundation Plan, Notes. ADD “10. Contractor’s option to construct thickened slabs as well as wall footings per Detail 4/S4.3.”
10. Sheet S4.4, Incubation Jar Racks. ADD “General Notes: 1. See Sheet D4.3 for piping including, but not limited to, welded elbows.”
11. Sheet S7.3, Bird Netting Sections & Details, Detail 1.
CHANGE “U.V. RESISTANT CABLE TIES @ 12” O.C. TYP. TOP & BOTTOM” WITH “STAINLESS STEEL HOG
RINGS SPACED @ 12” O.C. TOP & BOTTOM”.
DELETE note requiring 15” long screw-in earth anchors. The earth anchors are not required.
12. Sheet S9.2, Headtank Plans, Sections and Details.
Tank Plan. CHANGE “Elasto-Shield Series 264” TO “Elasto-Shield Series 262”.
Section B. CHANGE “Elasto-Shield Series 264” TO “Elasto-Shield Series 262”.
13. Sheet A5.1, Storage Building Floor Plan. ADD the new Post Frame Foundation Detail, 1/A5.1 (attached, Exhibit 1).
14. Sheet P4.2, Cool Water Incubation Building – Above Floor Plumbing. ADD “General Notes: 1. The rectangle with three subdivision lines and double lines around its perimeter along the south central wall of the Incubation Room is a scullery sink. It shall have process water supply per D4.2 and process drains per
D4.1.”
15. Sheet D1.3, Deep Well Pump & Piping Details, Section 1. CHANGE “10 inch upper barrel” TO “at least 12 inch upper barrel.”
16. Sheet D1.4, Ponds – Process Site Piping Plan.
Plan. CHANGE Plan North to face left.
Plan. ADD “& Pump & Pitless Unit” TO “Domestic Well” leader located in lower left corner of sheet.
HDR Project No. 10052369 ADDEDNDUM 1 - 8 03/15/19
General Notes. ADD “Anchor propane tanks to 20’ x 26’ concrete pad per tank maker instructions and
Specification Section 23 13 26, Propane Tanks & Related. Provide 1-inch diameter gas pipe (header) supported under tanks and at least 1-inch clear above pad. Turn pipeline underground at west edge of pad. Provide ¾-inch diameter pipe from each tank to header.”
17. Sheet D3.1, Raceway Fish Feeders Plan West, General Notes. ADD “4. Auto Feeder System and diverters and piping shown is specified in Section 41 13 00 Bulk Material Feeders. Two inch diameter MPA pipe is stainless tube in Section 41 13 00. Auto Feeder System is to be located 42 inches from west wall being sound proofed, not 6’ from east wall. Auto feeder system is to have a blower on its east end. Provide 4-inch SCH 80 CPVC intake piping from blower to an intake filter (shipped loose with the Auto Feeder
System) located 10 feet high in room’s southeast outside south wall.”
18. Sheet D4.2, Cool Water Incubation Building – Above Floor Process Piping Plan.
REPLACE Partial Jar Piping Plan WITH Partial Jar Piping Plan (attached, Exhibit 2).
ADD Tankless Stainless Condensing Water Heaters (Boilers) Isometric. (attached, Exhibit 5)
19. Sheet D4.3, Incubation Jar Rack Piping.
REPLACE Partial Jar Rack Piping Plan WITH new Partial Jar Rack Piping Plan (attached, Exhibit 3). SEE 3/8 inch diameter PRX pipe, fittings and valves
REPLACE Partial Jar Rack Meter Section WITH new Partial Jar Rack Meter Section (attached, Exhibit 4).
Detail 2. ADD “200 jars 7.5 inches on center in 8 rows of 25.”
20. Sheet D4.4, Fry Tanks & Piping.
Detail 2. CHANGE bottom of standpipe TO male pipe thread adapter.
Fry Tank Section. DELETE “SCH 80 PVC or” and REPLACE “spigot el set screwed in” WITH “street el in bottom”
Fry Tank Plan. REPLACE “PVC” With “FPT Aluminum”
21. Sheet D8.1, 1-Acre Pond Kettle Piping, Section C. CHANGE “3 inch AWS” TO “4 inch AWS” and CHANGE
“or HDPE ball valve” TO “butterfly valve with spigot flange on outlet”.
22. Sheet D8.2, 1/2-Acre Pond Kettle Piping, Section C. CHANGE “3 inch AWS” TO “4 inch AWS” and CHANGE
“ball valve” TO “butterfly valve with spigot flange on outlet”.
23. Sheet M4.1, Cool Water Building Heat & Vent Plan. ADD
“General Notes: 1. Louvers L-1 and L-2 bottoms shall be 8’ AFF.
2. Provide condensate piping from HRV-1 and HRV-2 to floor drain between the units shown on Sheet
P4.2 and from HRV-3 to nearest room corner and then to nearest trench drain.”
24. Sheet M4.2, Cool Water Building Heat & Vent Schedules & Details, Electric Heater Schedule, EUH-4, Mount Height, CHANGE “8 ft” To “7 ft”
25. Sheet E2.2, Existing Generator Building Electrical Plan. In the upper right hand corner of the drawing there is a note regarding Well D3. CHANGE the continuation reference from sheet “E1.4” to sheet “E1.1”.
26. Sheet E3.1, Existing Hatchery Building – Electrical Plan.
The east wall of the Feed Storage Room 6, includes an existing recessed duplex outlet. Rework the wiring, outlet box and conduit as required to extend the receptacle to the new wall surface as a result of the installation of sound proofing. The existing receptacle is not shown.
There is an existing surface mounted circuit breaker box mounted on the east wall, north corner of the
Feed Storage Room 6. Rework the circuit breaker panel and replace the cover and inner panel cover with a new flush mount cover, as needed to accommodate the installation of sound proofing on the east wall.
Rework the existing conduit and wire as required for a code compliant panel installation.
27. Sheet E4.2, Cool Water Incubation Building – Lighting Plan.
HDR Project No. 10052369 ADDEDNDUM 1 - 9 03/15/19
The make-up air unit MAU-1 shown in the Chemical Storage Room 102 shall be rated 2kW at 240-volt single phase. CHANGE the home run to read “LDP: 37, 39”.
The make-up air unit MAU-2 shown in the Locker Room 105 shall be rated 3kW at 240-volt single phase.
CHANGE the home run to read “LDP: 45, 47”.
28. Sheet E4.4, Cool Water Incubation Building – Partial Plans & Details. REPLACE Partial Plans and Details –
Key Notes WITH new Partial Plans and Details – Key Notes (attached, Exhibit 6).
29. Sheet E99.7, Panel Schedules. For panel schedule LDP, CHANGE circuit LDP: 37, 39 to a 20-amp, 2-pole breaker feeding MAU-1. CHANGE circuit LDP: 45, 47 to a 20-amp, 2-pole breaker feeding MAU-2.
30. Sheet E99.9, Schedules. Fixture Schedule – For fixture type F10, CHANGE the catalog number for the Rab fixture to read “RAB LOT3T110/D10.”
TECHNICAL QUESTIONS:
No. Question Response
1 This drawing was included in the plan set, project manual, but not listed in the Index of Drawings. Is this drawing required for this project? - M2.4 Generator Aids
M2.1 Generator Aids is in the project and has been added to the index and
TOC.
2 We are a building contractor in Manistique, Michigan and are planning on bidding on the Thompson State Fish Hatchery Project and need to know an estimated dollar amount for our bonding company. Is that something that you can provide?
This information will not be provided
3 will there be a spec book coming out? will you be providing a bid form to use?
Yes and Yes.
4 I didn’t find any specifications for this project on the SIGMA site.
Will there be any specification issued or did I just miss it?
Specs Issued.
5 Is it possible to get an approximate estimated dollar amount for this project? Our bonding company is requesting it.
This information will not be provided
6 Upon reviewing the specifications for this project, I noticed that the following pages are not included in the table of contents but are added in the specifications: M2.1 Generator Aids, was this supposed to be included?
M2.1 Generator Aids is in the project and has been added to the index and
TOC.
7 The drawings show that the Storage Building has a metal roof, however the spec does not call out for that, please clarify what panel profile you want (gauge, finish/color) etc.
The metal roof panels for the Storage building are covered in 13 34 00 (Page
6) Section 2.3 Exposed Fastener, Lap-
Seam Metal Roof Panels.
8 I was planning on attending the pre-bid today as a subcontractor, but have had a few issues come up. Prior to bidding (not as a prime) I would like to see the site as we are a sitework contractor. Will access to the site be available at other dates if pre-arranged, or is this the only opportunity to see the site.
See Response 16 on Pre-Bid Minutes.
9 To provide the State with a more competive number and due to a lot of specialized items in this bid and remote location Barton
Malow request a 1 week extension to the bid date, to 3/27/2019 if possible.
The bid date will not be extended.
10 What Permit Costs are we responsible for? All permits required for the project that were not listed as being already obtained by the Owner. See section
00210, Paragraph 5.3.
HDR Project No. 10052369 ADDEDNDUM 1 - 10 03/15/19
11 Can the “Backup” generator for the Existing generator that’s being replaced be speced and voltage requirements be outlined for the system in addendum #1?
See sheet E2.1. The new generator replacing the indoor generator is a 300 kW unit, 480/277 volt, 3-phase, 4-wire.
12 Is there cleaning or sanitation of the new piping and also feeding system required?
Piping system shall be flushed and clear of construction debris but no specialized sanitation of the piping system is required beside as outlined in the specifications related to domestic water piping. Feeding system shall be clear of dust and construction debris but does not require a specialized sanitation.
13 Can the Temporary protection of the sandblasting operation for the New “Aquaculture Coating” of existing building “Large Fry
Rearing Raceways” be specified, and items and equipment in the existing buildings be specified as to the extent and clean-up required after the operation is completed?
The area surrounding the tanks to be coated shall be protected from the surface preparation and coating installation. The surrounding area will need to be cleaned following the coating installation.
14 What existing screen guides and overflow pipes need to be removed and replaced in the existing “Aquaculture Tanks” for the coating operation?
There are both surface mounted and embedded screen guides. The existing surface mounted screen guides are screwed into the concrete and caulked.
These will need to be removed prior to coating. The embedded guides will need to be masked off and protected from being coated. The standpipe openings will also be required to be masked off and not coated. See
Addendum.
15 What Road permits are we responsible for and can the road rating of M-149 be given?
No road permits are required. M-149 is a seasonally restricted road.
16 Is Filling of the new ponds for testing required? Can we use State of Michigan electricity to run our pumps or use the existing pumps in the wells to fill the Ponds for testing?
See Addendum for clarification.
17 Is the site considered a “Balanced” site? If not where do we haul the excess spoils to?
Some soil is assumed to not be acceptable for use for site fill material.
Access material can be placed on site not within wetland limits.
18 Can we use onsite Electricity for construction work? Is the state picking up the cost or the General Contractor?
See 01 30 00, 1.8
19 Can a schedule of months or dates be provided for phased work?
I.E. Emergency generator change out, Aquaculture and coating work.
Section 00800 outlines the required scheduled items and see this addendum for more information related to the emergency generator. No other schedule limits are imposed. As discussed in the Pre-Bid meeting, extensive coordination will be required with the hatchery staff concerning construction schedule.
HDR Project No. 10052369 ADDEDNDUM 1 - 11 03/15/19
20 Could you give me some clarification to the dimensions of the wrapped stone around the groundwater control drain pipe as shown on the detail in the upper right corner of plan sheet C1.12.
Some of this pipe is 10’-20’ deep. Is the intent to have the wrapped stone above the pipe to the finished surface grade?
See Addendum for clarification.
21 Can you tell us when we will have the plan holder list/pre-bid meeting sign in sheet for the Thompson State Fish Hatchery
Project.
The pre-bid meeting attendance list is included in the addendum.
22 Dwg S7.3 shows #3 spiral type Reinforcing full height, in the post foundation for the Netting, can this spiral reinforcing be replaced with #4’s at 12”o.c. full height?
#3 spiral reinforcement shall be used for the netting post foundations.
23 Can existing topsoil be stockpiled and reused for seeding areas topsoil?
Yes.
24 If we can use existing topsoil does this have to be screened, and where is an area to store this topsoil?
Follow contract documents per 32 91
13 Topsoiling and Finished Grading, Part 3 Execution for topsoil preparation requirements. The contractor shall determine acceptable stockpile areas that do not conflict with wetland areas and will coordinate locations with the hatchery staff.
25 There is a Solar Pond that is designated ½ acre pond, it doesn’t show if it gets Predator Netting or not, because this is a ½ acre pond does it get foundations and Predator Netting around this pond per dwg S7.1?
The solar pond is not covered by predator netting. Note that sheets S7.1 and S7.2 indicate the total number of ponds to receive predator netting.
26 At the new Storage bldg. there are NO foundations shown on drawing A5.1 , but the spec calls out for 4’x17” dia precast foundations , can a detail of this foundation and also the building anchoring system be shown?
See Addendum.
27 In the Bulk Material Feeders spec section 41 13 00 it gives us a good description of what type of feeder you want ,but does not specify a manufacture’s or have a drawing or detail showing us the feeder itself, connections, electrical terminations etc., can this be supplied to us?
This is a performance specification.
Connection details will be specific to the manufacturer.
28 There is a spec section 07 27 26 “ Fluid Applied Air Barrier-Vapor
Resistive” given to us , where is this located on the drawings, is this applied below the EPDM pond liner?
The fluid applied air barrier is to be applied on the exterior face of the CMU wall (as indicated on the drawings)
29 Does the Storage Building Interior Steel/wood and siding get finish painted?
The metal wall panels are to be factory finished….No painting of wood members or metal panels.
30 There is a section “09-9600” High Performance Industrial
Coatings” Where does this spec apply to on the drawings? The only coatings mentioned are on dwg S2.1 in the existing Hatchery bldg. spec section 07 16 05 note 2.
High Performance Coating Specification
09 96 00, paragraph 3.1 indicates items to be coated. See Addendum for revisions to the specification and drawings for clarification.
HDR Project No. 10052369 ADDEDNDUM 1 - 12 03/15/19
31 Section 07 16 04 Concrete Floor Moisture Testing, isn’t this covered by the State under there testing?
Yes – Section 07 16 04 is for moisture testing of concrete surfaces that are to receive coatings. Testing under this specification section is to be engaged and paid for by the Owner per section
1.4.
32 If work of subcontractor is monetarily more than the contractor who is submitting a bid to the GC, does that disqualify the bid? a.
The reason that this may happen is due to the deep well (2000’)
D-3 that is in the SOW for this project, there is no drilling contractor I am aware of in our state (MI) that could drill this well so I would need a driller from another state to come up and drill this hole and sign off on the well with my MDEQ Water Well
Drilling License. This will be the majority of our proposed bid to our GC.
The bids will be submitted by the
General Contractor. The work you describe would be a subcontract with the General Contractor. It is up to the
Contractor how they want to subcontract the well drilling work. The bids would not be disqualified
33 Well D-3. After the plastic casing is installed and ready to drill the open hole, there is a risk of damaging the bottom of the PVC as the bit exits the casing. I have had discussion about this with Al
Smith at Johnson Screens and he suggested that the bottom 10-
20 feet should be made of stainless steel and then transition to
PVC for the rest of the hole. After the stainless steel is cemented in place, it would be very unlikely to be damaged when drilling continues. Can we use SS in the bottom of the hole and then transition to PVC?
A stainless steel section of casing may be provided and attached to the bottom of the PVC casing at
Contractor’s expense.
34 The other concern is related to "air" drilling after the PVC casing is grouted. When air is used as circulation fluid, the pressure inside the casing will be much less than in the formations that are adjacent to the casing and grout. If the water level in the formations is nearly at the ground surface, emptying the casing with compressed air could cause a differential pressure of about
1250' x .43 psi/ ft of water = 537.5 psi. Indeed the pipe appears to be protected by the cement grout but the cement is more permeable than the PVC and certainly small cracks in the cement would have more leakage too. If a "micro-annulus" is present between the PVC and cement, any leakage from the formation pressure would easily collapse the pipe. If the pipe and grout is perfect, 537 psi may exceed the collapse pressure of the
"composite" casing and cement grout. I suggest drilling the open hole below the casing using reverse circulation and keep the water level inside the casing nearly at static water level to reduce the risk of collapsing the casing. Another advantage of using reverse circulation would be reduction of the wear caused by abrasion between the rotating drill pipe and PVC casing because the drill cuttings are returned upward through the inside of the drill pipe. Can reverse rotary be considered for this deep borehole?
The reverse rotary drilling method is allowable for the open portion of the borehole after the PVC casing has been grouted.
35 Is there an “American Made” steel requirement for this project? There is no "American Made" steel requirement. However, when considering items and all things being equal, Michigan-made is preferred, followed by American-made, followed by foreign-made.
36 Is this a prevailing or wage rate project? No, as stated in the Pre-Bid meeting.
HDR Project No. 10052369 ADDEDNDUM 1 - 13 03/15/19
37 Is drilling water available onsite? Per Specification 01 30 00, Special
Conditions, of the bidding documents, a
400 GPM groundwater supply will be available onsite.
38 Are the well permits for both the deep well and the domestic well being taken care of (obtained) by Thompson Fish Hatchery personnel at no cost to the drilling
Domestic well permit has been applied for by DNR. DNR will apply for the deep well permit.
39 How much time should be allocated for DEQ downhole geophysics on boreholes? Is this for each borehole before being cased? Will this work be done on a T&M basis?
Addressed in the Addendum.
40 If required, would a temporary water be allowed to be installed at the deep well site for the driller? The well would be abandoned after deep well is installed and approved.
No.
41 If everything downhole in the deep well is stainless steel (besides the check valves), is a stainless steel pump end also recommended or the DI bowl as specified?
No changes except the drop pipe will be addened to stainless steel since that is where we anticipate the most corrosion.
42 Attached is the SDS for QuickFoam, which is a product that is used in the drilling industry for certain downhole drilling functions.
Our subcontractor for the deep well has asked if this can be utilized to install part of the deep well and would like to know if this will cause issues if used if the foam comes to surface and gets into nearby streams where it can affect the fish.
Quik-Foam may be used. Per
Specification 01 35 05, Environmental
Protection Deep Well, drilling fluids shall not be allowed to enter a water body.
43 Can you re-issue sheet S7.2. I cant read some of the wording and measurements on this sheet. Please see attached for reference.
You cannot extract individual drawings from adobe. You will need to provide the supplier with the entire set of drawings via Sigma.
44 Can the pump for the domestic shallow well be 230 volt? The
480v isn't optimal. It can be done but costs a lot (thousands) extra.
A 480 volt pump is specified.
45 Domestic Well: Do you want a VFD (constant pressure) pump or standard?
The control schematic for the domestic well is shown on sheet E99.5.
46 Domestic Well: Is the well drilling company doing the drilling of the well, pump and pitless adapter installation only? If the water line to the building and pressure tank are also to be done by the drilling company please let us know where we can find the specifications.
We do not dictate who does what. The prime contractor is responsible for everything including subcontractor work. There is no pressure tank, instead a level controlled potable water storage tank in the building (P sheets) and DIV
22 spec. Well pump and pitless unit are being added to the domestic well pump spec. in this Addendum.
47 In bid section “Predator Control Netting System, Part 2 page 10 72
50 -2, item e. calls for “Wire rope sheaves – 10” O.D., bronze – bushed cast iron sheaves for 3” diameter wire rope.” This is a very large cable. We found no reference in the site plans / drawings for
3” diameter wire rope. Is this referring to non-netting work, or to some other bid section item?
There are no sheaves in the project.
This paragraph will be deleted from the specifications in the addendum.
48 In Drawing S7.2 the text of dimension numbers are corrupted and unreadable. Please provide the correct dimensions for the 1 acre netting ponds.
You cannot extract individual drawings from adobe. You will need to provide the supplier with the entire set of drawings via Sigma.
HDR Project No. 10052369 ADDEDNDUM 1 - 14 03/15/19
49 The next item has some “means and methods” questions but they are brought up because the specifications indicate that the pond liner will be installed before the bird netting and this limits access to install the netting that will cause the man hours required to install the bird netting to greatly increase. Regarding use of a boom to connect wire cable etc. to posts across a wide expanse, we have a comment about accessibility and maneuverability. The use of ladders on a sloping surface is not safe, and there is potential for damage to the pond liner material.
Would the owner consider installing the netting before the liner is installed? Will the road path be large enough to accommodate large lifts and or cranes?
The netting may be installed prior to the pond liner as revised in the
Addendum. It is the Contractors means and methods to determine installation sequence. The roadway width between ponds is shown on the drawings.
50 During bird net installation, will the road surface be dried and compacted under the liner and around the ponds---this has to do with surface stability supporting large lift and or crane equipment
The sequencing of road construction is a part of the Contractor’s means and methods.
51 Given lake weather in winter, would the project consider a center post across the width of all ponds to ensure support of nets during heavy snow and ice loads, and to extend the performance and life of the netting system?
The use of a center post was discussed early in the project and the Owner requests a clear-span netting system with no center supports.
52 Would the owner consider use of stainless steel hog rings and stainless steel pipe clamps instead of using cable ties due to time of installation and longevity of fasteners?
Stainless steel hog rings should be used
(see Addendum).
53 Midwest Bird Control provides a 1 year warranty on installation.
A maintenance plan will be required for a 10 year warranty at an additional cost.
Per Specification Section 10 72 50, 2.4, the ten year warranty is for coverage against U.V. breakdown of materials.
54 What is the Predator Bird Net Plan deadline / completion requirement on the project?
No bird predation netting completion schedule has been specified
55 Has a hazardous material assessment been done on the existing items to be removed in this project? Example- has the tank coating been tested for Lead and asbestos
See Section 00800, Appendix II.
56 Are the propane tanks and the oxygen tanks provided by the owner?
D4.2 states LOX tank by DNR. See addendum for new propane tank spec.
57 Do you have a supplier or manufacturer for the Bulk Material
Feeders (41 13 00)?
This is a performance specification.
58 Can you provide a detail at the pond edge showing the pond liner and bird netting support. Detail 3/C1.20 and detail 2/S7.3 show two different edge details for the pond liner.
See Addendum for clarification.
59 Specification SECTION 26 43 13 LOW VOLTAGE SURGE
PROTECTION DEVICES (SPD) indicates 3 types of Surge protection devices. Please advise on the following: a) Which one is associated with MSD (DWG E4.1); b) Which one is associated with
LDS (DWG E4.1); c) Which one is associated with MCC-1 (DWG
E2.1); d) Which one is associated with MCC-2 (DWG E2.1)
Panel MSD - Type 1 SPD (Integrally mounted); MCC-1 - Type 2 SPD; MCC-2
- Type 3 SPD; Panel LDS - Type 3.
60 Please provide CAD files for this project so our site contractors can use them for estimating cut and fill needed
CAD files are not released during the bidding process.
61 Regarding the Thompson State Fish Hatchery Project; the drawings show four 1000 gallon propane tanks. Are these tanks part of the contract or are they rentals?
See addendum for new propane tank spec.
62 It was mentioned at the Pre-Bid Monday that the State requires a temporary construction fence at the existing facility can you please denote where and how much of this fence is to be installed?
See Addendum.
HDR Project No. 10052369 ADDEDNDUM 1 - 15 03/15/19
63 I have an image here. I feel like this will make it challenging. I would have to pour the footing. Lay a course of block. Then pour the remaining concrete with the thicken slab. Just wondering of it could either be all footing or all thicken slab or have the footing run from an exterior wall to an exterior wall and not have the footing end in the middle of the building.
Interior thickened slabs can be constructed as footings, see Addendum.
64 I have two different images one is insulation on the inside of foundation that is in S0.2 and the other has insulation on the outside on A4.6. So which one do you want?
The insulation shall be placed on the exterior side of the foundation walls as shown on sheet A2.6.
65 Drawing shows top rail and bottom wire, while the specs say top
& bottom wire. The pictures from the Wisconsin site looked like top & bottom wire. I would think that top and bottom wire is what you are looking for?
See Addendum.
66 Spec calls for 2 oz. Galvanized before Weave. I would prefer to use a better product -Aluminized Coated Steel. The warranty is better, 25 years vs. 15 years. I have not used Galvanized Fabric in
25 years.
See Addendum.
67 Gate frame states Square Galvanized Tube. Square Galvanized
Tube is not a normal product in the fence industry. Gates are normally made of Round Pipe, 1 5/8” OD or 1 7/8” OD. Gate hinges lighter weight Square Steel tubing is available, but not
Schedule 40.
See Addendum
68 What is the existing coating in the tanks? We need to know this to determine the time and materials needed to remove the coating.
The existing coating material is The coating is a two part epoxy product made by Belzona.
69 What area inside the building requires the high performances coating, (hollow metal, CMU walls) since the Room Finish
Schedule only calls out paint?
High Performance Coating Specification
09 96 00, paragraph 3.1 indicates items to be coated. All interior painting of
CMU, miscellaneous ferrous metals, etc.
will be per 09 91 10 Architectural
Painting
70 In attaining quotes for the alternate ‘to provide 133400 Post
Frame Building System’, we found that the Lester Building
Systems doesn’t plan to bid. The only other manufacturer listed is
Hansen Buildings and they will only provide the building / no labor. Both of these manufacturers are out of Minnesota. We request you list: 1. Cleary Building Corp, Website:
https://clearybuilding.com/, Address: 1814b N Lincoln Rd, Escanaba, MI 49829, Phone: (906) 789-7720.
This is the start of the file's text. The full file is on GovTribe.