Specifications-SPECS.pdf

PDF 2 MB Posted

Attached to
B19001517 Port Allen Small Boat Harbor New Harbor Office
Solicitation number
B19001517
Issued by
Kauai County, Kaanapali CDP, Hawaii

About this file

This document contains the contract specifications and plans for Job No. KA18-02, the construction of a new 14'x44' (616 square foot) wooden office building at the Port Allen Small Boat Harbor in Eleele, Kauai, Hawaii. The work includes furnishing all materials, tools, equipment, labor, and other incidental work necessary for the construction. Bids shall be submitted to the Department of Land and Natural Resources, Division of Boating and Ocean Recreation, through the State's e-Procurement system by the specified date and time. A pre-bid conference will not be held, but bidders are strongly encouraged to conduct a site visit. The estimated cost of construction is $245,000.00. The contract will be awarded subject to the availability of funds and is subject to Hawaii Products Preference and Recycled Products Preference. Bidders must possess a valid State Contractor's license, classification "B", and comply with all requirements of HRS 103D-310(c) at the time of bid submission, including providing proof of tax clearance, labor compliance, and good standing with the Department of Commerce and Consumer Affairs.

The contract will be awarded to the lowest responsive and responsible bidder. Liquidated damages will be assessed for failure to complete the project by the specified completion date. The successful bidder will be required to provide performance and payment bonds each in the amount equal to the total contract price. The Department of Land and Natural Resources, Division of Boating and Ocean Recreation will administer and oversee the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Boating and Ocean Recreation

State of Hawaii

DEPARTMENT OF LAND AND NATURAL RESOURCES

Honolulu, Hawaii

BOARD OF LAND AND NATURAL RESOURCES

Suzanne D. Case Chairperson

CONTRACT SPECIFICATIONS AND PLANS

Job No. KA18-02

Port Allen Small Boat Harbor New Harbor Office

Eleele, Kauai, Hawaii

April 2019

State of Hawaii

DEPARTMENT OF LAND AND NATURAL RESOURCES

DIVISION OF BOATING AND OCEAN RECREATION

Honolulu, Hawaii

CONTRACT SPECIFICATIONS AND PLANS

Job No. KA18-02 Port Allen Small Boat Harbor

New Harbor Office Eleele, Kauai, Hawaii

Approved: _________________________________________________

EDWARD R. UNDERWOOD

Administrator

Approved: _________________________________________________

FINN MCCALL, P.E.

Engineering Branch Head

April 2019 https://stateofhawaii.na1.echosign.com/verifier?tx=CBJCHBCAABAAQ1yZeanYs_gayfZ7sxAbunrM86cfJIse https://stateofhawaii.na1.echosign.com/verifier?tx=CBJCHBCAABAAQ1yZeanYs_gayfZ7sxAbunrM86cfJIse

NOTICE TO BIDDERS ........................................................................................... iii

INFORMATION AND INSTRUCTIONS TO BIDDERS ....................................... I-1

SPECIAL PROVISIONS ............................................................................................ SP-1

QUALIFICATIONS QUESTIONNAIRE .................................................................. -1-

TECHNICAL SPECIFICATIONS ........................................................................... S-1

PROPOSAL (Bound Separately) .............................................................................. P-1

PLANS (Bound Separately)

DEPARTMENT OF LAND AND NATURAL RESOURCES INTERIM GENERAL

CONDITIONS, DATED OCTOBER 1994. (Bound Separately) ii iii

NOTICE TO BIDDERS

(Chapter 103D, HRS)

COMPETITIVE BIDS for JOB NO. OA18-02 PORT ALLEN SMALL BOAT HARBOR NEW HARBOR OFFICE shall be submitted to the Department of Land and Natural Resources, Division of Boating and Ocean Recreation, Engineering Branch on the specified date and time through the State of Hawaii e-Procurement System (HIePRO). HIePRO is accessible through the State Procurement Office website at www.hawaii.gov/spo.

The Department of Land and Natural Resources Interim General Conditions dated October 1994, as amended, and the General Conditions – AGS008 latest revision (General Conditions), shall be made a part of the specifications. Electronic copies of the General Conditions are available through the State Procurement Office website.

Plans and specifications may be obtained through the HIePRO system, listed under the Job No. and Project title above.

This project is located at Port Allen Small Boat Harbor, Eleele, Kauai, Hawaii. Tax Map Key (4) 2 - 1-003:10.

The work shall consist of construction of new 14’x44’ (616 square foot) wooden office building with concrete footing, including all materials, tools, equipment, labor and other incidental work necessary, as required or called for in this Proposal, Specifications, Plans and Manufacturer’s Typical Installation Instructions.

The estimated cost of construction is $245,000.00.

A pre-bid conference will not be held for this project. All interested parties are strongly encouraged to conduct a thorough site visit prior to bidding.

Due to the nature of work contemplated, bidders must possess a valid State Contractor's license, classification “B.”

As a condition for award of the contract and final payment, the vendor shall provide proof of compliance with the requirements of HRS 103D-310(c). Proof of compliance/documentation is obtained through Hawaii Compliance Express (HCE) at https://vendors.ehawaii.gov/hce/splash/welcome.html. Vendors shall register in HCE, a program separate from HIePRO. The annual subscription fee to utilize the HCE service is currently $12.00 (subject to change). Allow two (2) weeks to obtain complete compliance status after initial registration. It is highly recommended that vendors subscribe to HCE prior to responding to a solicitation. The vendor is responsible for maintaining compliance. If the vendor does not maintain timely compliance in HCE, an offer otherwise deemed responsive and responsible may be awarded.

See HIePRO FAQ on the State Procurement website for more information.

Vendors are required to be compliant with all of the requirements of HRS 103D-310(c) at the specified response date and time (bid opening). The proof of compliance/documentation will be verified through the HCE. Failure to be fully compliant at the specified response date and time shall deem the vendor’s bid to be non-responsive and the vendor’s bid will be rejected.

http://www.hawaii.gov/spo https://vendors.ehawaii.gov/hce/splash/welcome.html https://vendors.ehawaii.gov/hce/splash/welcome.html iii

The Engineering Branch Head of the Department of Land and Natural Resources, Division of Boating and Ocean Recreation is responsible for administering and overseeing the Contract, including monitoring and assessing contractor performance.

The award of the contract, if it be awarded, will be subject to the availability of funds.

This project is subject to Hawaii Products Preference and Recycled Products Preference. For bidding purposes only, bid prices may be adjusted in accordance with the applicable preferences.

Should there be any questions, please use the question and answer section of the HIePRO solicitation.

I-1

INFORMATION AND INSTRUCTIONS TO BIDDERS

CONTENTS

Page

A Project Location and Scope of Work ............................................................... I-2 B Proposals ........................................................................................................... I-2 C Specifications .................................................................................................... I-2 D Proposal Form ................................................................................................... I-2 E Responsibility of Bidders to Study Site ............................................................ I-2 F Interpretation of Contract Documents ................................................................. I-2 G Omissions or Erasures ....................................................................................... I-2 H Notice of Intent to Bid and Questionnaire ......................................................... I-2 I Bid Security ....................................................................................................... I-3 J Contractor’s License Required .......................................................................... I-3 K Irregular Bids .................................................................................................... I-3 L Withdrawal of Bids ........................................................................................... I-3 M Successful Bidder to Provide Performance and Payment Bonds ...................... I-3 N Number of Executed Original Counterparts of Contract .................................. I-3 O Change Orders .................................................................................................... I-3 P Wages and Hours ............................................................................................... I-4 Q Permits .............................................................................................................. I-4 R Property Damage ................................................................................................ I-4 S Time .................................................................................................................. I-4 T Bidders’s Responsibility to Provide Proper Superintendence .......................... I-4 U Liquidated Damages ......................................................................................... I-4 V Hiring of Local Labor ....................................................................................... I-5 W Water and Electricity ........................................................................................... I-5 X Public Convenience and Safety ......................................................................... I-5 Y Work to Be Done Without Direct Payment ...................................................... I-5 Z As-Built Drawings .............................................................................................. I-5 Z1 Asbestos Containing Materials ........................................................................... I-6 Z2 Workers Safety .................................................................................................... I-6 AA Toilet Facilities ................................................................................................. I-6 BB Signs .................................................................................................................. I-6 CC Field Office for Department .............................................................................. I-6 DD Quantities .......................................................................................................... I-6 EE Other Health Measures ...................................................................................... I-6 FF Hawaii Business Requirement .......................................................................... I-6 GG Compliance With §3-122-112 HAR ................................................................... I-6

I-2

INFORMATION AND INSTRUCTIONS TO BIDDERS

A. PROJECT LOCATION AND SCOPE OF WORK: The project location and scope of work shall be as generally described in the Notice to Bidders.

B. PROPOSALS: Competitive proposals shall be submitted to the Department of Land and

Natural Resources, Division of Boating and Ocean Recreation through the State of Hawaii e- Procurement System (HIePRO) on the specified date and time indicated on the solicitation.

HIePRO is accessible through the State Procurement Office website at www.hawaii.gov/spo.

C. SPECIFICATIONS: The Department of Land and Natural Resources Interim General

Conditions dated October 1994, as amended, shall be made a part of these contract specifications and are referred to hereafter as the General Conditions. In case of any conflict between the General Conditions, Contract Specifications, and Plans included herein, the Plans shall govern over the Contract Specifications and General Conditions; the Contract Specifications shall govern over the General Conditions.

D. PROPOSAL FORM: The Bidders shall fill out and upload the electronic copy of the proposal form to the HIePRO website when submitting the bid. Bid Proposals shall not be mailed, faxed or delivered to the State, unless requested to do so after the designated closing date. The successful Bidder shall fill out and print a hard copy of the proposal form, sign and submit the form with the contract award package.

E. RESPONSIBILITY OF BIDDERS TO STUDY SITE: At the time of bid opening, each bidder will be presumed to have conducted a detailed inspection of the project site, to have read and be familiar with the Plans, Specifications and other contract documents including all Addenda. The failure or omission of any bidder to thoroughly inspect the site or to receive or examine any form, instrument, or document shall in no way relieve him from any obligation regarding his bid.

F. INTERPRETATION OF CONTRACT DOCUMENTS AND ADDENDA: If any prospective bidder is in doubt as to the true meaning of any part of the contract documents, a request for information (RFI) shall be submitted to the DLNR Division of Boating and Ocean Recreation no later than 8 days prior to the time established for the opening of bids. All interpretation of the contract documents and applicable responses to RFI will be made only by addendum, which shall be issued via the HIePRO system. All prospective bidders are responsible to regularly check HIePRO for the issuance of any addenda related to the project.

G. OMISSIONS OR ERASURES: Any proposal which contains any omission or erasure or alteration not properly initialed, or conditional bid, or other irregularity may be rejected by the Board of Land and Natural Resources (Board).

H. NOTICE OF INTENT TO BID AND QUESTIONNAIRE:

A Notice of Intent to Bid is not required for this project. In compliance with HRS Section

103D-310, the lowest responsive and responsible bidder may be required to complete a standard questionnaire. When required, the completed questionnaire shall be submitted to the Engineering Branch Head for evaluation. Failure to furnish the requested information within the time allowed may be grounds for a determination of non-responsibility, in accordance

I-3 with HRS Section 103D-310 and HAR Section 3-122-108.

I. BID SECURITY: A bid security will be furnished by each bidder as provided in sub-section

2.7 of the General Conditions. The successful bidder's bid security will be retained until Contract execution and furnished a performance and payment bond in an amount equal to one hundred percent (100%) of the total Contract price, including an amount estimated to be required for extra work, is furnished. No bid security is required for bids less than $50,000.

The Board reserves the right to hold the bid securities of the four lowest bidders until the successful bidder has entered into a contract and has furnished the required performance bond. All bid securities will be returned in accordance with sub-section 3.5 of the General Conditions. For construction contracts less than $250,000, the State reserves the right to contract the work under a purchase order.

Should the successful bidder fail to enter into a contract and furnish a satisfactory performance bond within the time stated in the proposal, the bid security shall be forfeited as required by law.

J. CONTRACTOR'S LICENSE REQUIRED: The Board will reject all bids received from contractors who have not been licensed by the State Contractors License Board in accordance with Chapter 444, HRS; Title 16, Chapter 77, Hawaii Administrative Rules; and statutes amendatory thereto. This project will require a State Contractor’s license, classification “B”.

K. IRREGULAR BIDS: No irregular bids or propositions for doing the work will be considered by the Board.

L. WITHDRAWAL OF BIDS: No bidder may withdraw his bid between the time of the opening thereof and the award of contract.

M. SUCCESSFUL BIDDER TO FILE PERFORMANCE AND PAYMENT BONDS: The successful bidder will be required to file performance and payment bonds each; in the amount equal to the total contract price, including amounts estimated to be required for extra work, as provided in sub-section 3.6 of the General Conditions. Performance and payment bonds are not required for bids less than $50,000.

N. NUMBER OF EXECUTED ORIGINAL COUNTERPARTS OF CONTRACT

DOCUMENTS: If requested by the Board, six copies of the Contract, performance and payment bonds shall be executed. For contracts less than $50,000, the State reserves the right to contract the work under a purchase order.

O. CHANGE ORDERS: No work of any kind in connection with the work covered by the plans and specifications shall be considered as change order work, or entitle the Contractor to extra compensation, except when the work has been ordered in writing by the Chief Engineer (Engineer) and in accordance with sub-section 4.2 of the General Conditions.

The Contractor shall clearly identify and inform the Engineer in writing of any deviations from the contract documents at the time of submission and shall obtain the Engineer's written approval to the specified deviation prior to proceeding with any work.

I-4

P. WAGES AND HOURS: In accordance with sub-sections 7.3 to 7.9 of the General

Conditions relative to hours of labor, minimum wages and overtime pay, the current minimum wage rates promulgated by the Department of Labor and Industrial Relations (DLIR) shall be paid to the various classes of laborers and mechanics engaged in the performance of this contract on the job site. The minimum wages shall be increased during the performance of the contract in an amount equal to the increase in the prevailing wages for those kinds of work as periodically determined by the DLIR.

The Department of Land and Natural Resources will not recognize any claim for additional compensation because of the payment by the Contractor of any wage rate in excess of the said minimum wage rates. The possibility of wage increase is one of the elements to be considered by the Contractor in determining his bid, and will not, under any circumstances, be considered as the basis of a claim against the Department under this Contract.

No work shall be done on Saturdays, Sundays, legal State holidays, and/or in excess of eight

(8) hours each day without the written consent of the Engineer. Should permission be granted to work at such times, the Contractor shall pay for all inspection administrative costs thereof.

No work shall be done at night unless authorized by the Engineer.

Q. PERMITS: The Contractor shall be responsible to ascertain and obtain any required permits associated with this project and pay the required fees. If permit applications are not processed by the State, the Contractor shall process the permit applications, permits and licenses, and pay all charges and fees. In all cases, the Contractor shall give all notices necessary and incident to the due and lawful prosecution of the work.

R. PROPERTY DAMAGE: It shall be the responsibility of the contractor to respect State property and to prevent damage to existing improvements. The Contractor will be responsible for damages resulting from construction operations. Immediately upon discovery, the Contractor shall repair such damage to the satisfaction of the Engineer.

All trees and shrubbery outside the excavation, embankment or construction limits shall be fully protected from injury.

S. TIME: The time of completion is specified in the Proposal. It is the Board's intention to insist the Contractor diligently prosecute the work to completion within the specified time.

Prospective bidders are reminded that the State has the option to proceed with or abandon a project depending on whether the project can be completed for occupancy in the specified time.

It is the bidder's responsibility to check the availability of all materials before bidding. The bidder shall select sub-contractors and suppliers who can warrant availability and delivery of all specified or qualified materials to assure project completion within the specified time.

The successful bidder must assume all risks for completing the project by the specified date.

There shall be no extension of time for any reason except for delays caused by acts of God, labor disputes involving unions, or actions of the State. If for any reason the project falls behind schedule, the Contractor shall at its own cost, take necessary remedial measures to get

I-5 the project back on schedule, i.e., working overtime, air freighting all materials, etc. In addition, if the Contractor fails to fully complete the project by the completion date, Contractor will be required to make the facility usable at its own cost.

T. BIDDER'S RESPONSIBILITY TO PROVIDE PROPER SUPERINTENDENCE: The successful low bidder shall designate in writing to the Engineer the name of its authorized superintendent (Superintendent), who will be present at the job site whenever any work is in progress. The Superintendent shall be responsible for all work, receiving and implementing instructions from the Engineer in a timely manner. The cost for superintendence shall be considered incidental to the project.

If the Superintendent is not present at the site of work, the Engineer shall have the right to suspend the work as described under sub-section 5.5 c. and 7.20 - Suspension of Work of the General Conditions.

U. LIQUIDATED DAMAGES: Liquidated damages in the amount specified in the Proposal will be assessed for each and every calendar day from and after the expiration of the time period stated in the Contract for the completion of the project.

V. HIRING OF LOCAL LABOR: The Contractor shall hire local labor whenever practicable.

W. WATER AND ELECTRICITY: The Contractor shall make all necessary arrangements and pay all expenses for water and electricity used in the construction of this project.

X. PUBLIC CONVENIENCE AND SAFETY: The Contractor shall conduct construction operations with due regard to the convenience and safety of the public at all times. No materials or equipment shall be stored where it will interfere with the safe passage of public traffic. The Contractor shall provide, install, and maintain in satisfactory condition, all necessary signs, flares and other protective facilities and shall take all necessary precautions for the protection of the work and the convenience and safety of the public. The Engineer shall have the right to suspend the performance of the work in accordance with sub-section

7.20 - Suspension of Work of the General Conditions.

Y. WORK TO BE DONE WITHOUT DIRECT PAYMENT: Whenever the contract that the

Contractor is to perform work or furnish materials of any kind for which no price is fixed in the contract, it shall be understood that the Contractor shall perform such work or furnish said materials without extra charge or allowance or direct payment of any sort. The cost of performing such work or furnishing said material is to be included by the Contractor in a unit price for the appropriate item unless it is expressly specified that such work or material is to be paid for as extra work.

Z. AS-BUILT DRAWINGS: As-built drawings, the intent of which is to record the actual in-place construction so that any future renovations or tie-ins can be anticipated accurately, shall be required. All authorizations given by the Engineer to deviate from the plans shall be drawn on the job site plans. All deviations from alignments, elevations and dimensions which are stipulated on the plans shall be recorded on the as-built drawings. Final as-built drawings shall be submitted to the Engineer by the Contractor at the end of the project in both hard copy and electronic copy in Adobe PDF format on CD ROM.

I-6

Z1. ASBESTOS CONTAINING MATERIALS: The use of asbestos containing materials or equipment is prohibited. The Contractor shall insure that all materials and equipment incorporated in the project are asbestos-free

Z2. WORKER SAFETY: The Contractor shall provide, install and maintain in satisfactory condition all necessary protective facilities and shall take all necessary precautions for the protection and safety of its workers in accordance with the Occupational Safety and Health Standards for the State of Hawaii. The Engineer shall have the right to suspend the performance of the work in accordance with sub-section 7.20 - Suspension of Work of the General Conditions.

AA. TOILET FACILITIES: The contractor shall be required to provide their own portable toilet facilities throughout the duration of the project. All toilet facilities constructed at the project site shall be in accordance with the Public Health Regulations of the State Department of Health (DOH). All necessary precautions shall be observed at the project site. The use of sanitary facilities shall be strictly enforced and workers violating these provisions shall be promptly discharged.

BB. SIGNS: Whenever the project involves closing or obstructing any public thoroughfare, the

Contractor shall provide traffic signs conforming to the applicable provisions of the current edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways", published by the Federal Highway Administration as directed by the Engineer for the purpose of diverting or warning traffic prior to the construction area. All traffic signs shall bear proper wording stating thereon the necessary information as to diverting or warning traffic.

A project sign will not be required for this project.

CC. FIELD OFFICE AREA FOR DEPARTMENT: A field office for DLNR will not be required for this project.

DD. QUANTITIES: All bids will be compared on the basis of quantities of work to be done as shown in the Proposal; the quantities shown in the Unit Price items are estimated, being given as a basis for comparison of bids. The Board reserves the right to increase or decrease the quantities given under the items or delete items entirely as may be required during the progress of the work.

EE. OTHER HEALTH MEASURES: Forms of work site exposure or conditions which may be detrimental to the health or welfare of workers or of the general public shall be eliminated or reduced to safe levels as required by the DOH codes, standards, and regulations. Suitable first aid kits and a person qualified to render first aid, as specified in the DOH regulations, shall be provided at all times when work is scheduled.

FF. HAWAII BUSINESS OR COMPLIANT NON-HAWAII BUSINESS REQUIREMENT:

Bidders (Contractors) shall be incorporated or organized under the laws of the State or be registered to do business in the State as a separate branch or division that is capable of fully performing under the contract, as stipulated in §3-122-112 HAR.

GG. COMPLIANCE WITH §3-122-112 HAR:

As a condition for award of the contract the contactor shall be in compliance with the

I-7 following requirements:

A. TAX CLEARANCE REQUIREMENTS (HRS Chapter 237): Bidder shall obtain a tax clearance certificate from the Hawaii State Department of Taxation (DOTAX) and the Internal Revenue Service (IRS). The certificate is valid for six months from the most recently approved stamp date on the certificate; the certificate must be valid on the date received by the Department.

B. Department of Labor (DLIR) “Certificate of Compliance”. (HRS Chapter 383 -

Unemployment Insurance, Chapter 386 - Workers’ Compensation, Chapter 392 - Temporary Disability Insurance, and 393 – Prepaid Health Care): Bidder shall obtain a certificate of compliance from the Hawaii State Department of Labor and Industrial relations (DLIR). The certificate is valid for six months from the date of issue;

certificates must be valid on the date received by the Department.

C. Department of Commerce and Consumer Affairs (DCCA), Business Registration

Division (BREG) “Certificate of Good Standing”. Bidder shall obtain a certificate of good standing issued by the Department of Commerce and Consumer Affairs (DCCA), Business Registration Division (BREG). The certificate of good standing is valid for six months from the date of issue; certificates must be valid on the date received by the Department.

COMPLIANCE, DOCUMENTATION AND HAWAII COMPLIANCE EXPRESS

As a condition for award of the contract and as proof of compliance with the following requirements of 103D-310(c) HRS:

Vendors are required to be compliant with all appropriate state and federal statutes. Proof of compliance (compliance documentation) is required. See the HIePRO Buyer FAQ on the State Procurement website for more information.

Proof of compliance/documentation is obtained through Hawaii Compliance Express (HCE). Vendors shall register in Hawaii Compliance Express (HCE), a program separate from HIePRO. The annual subscription fee to utilize the HCE service is currently $12.00.

Allow 2 weeks to obtain complete compliance status after initial registration. It is highly recommended that vendors subscribe to HCE prior to responding to a solicitation.

The vendor is responsible for maintaining compliance. If the vendor does not maintain timely compliance in HCE, an offer otherwise deemed responsive and responsible may not be awarded.

Vendors are required to be compliant with all of the requirements of 103D-310(c) HRS at the specified response due date (bid opening). The proof of compliance/documentation will be verified through the Hawaii Compliance Express.

Failure to be fully compliant at the specified response date shall deem the vendor’s bid to be non-responsive and vendor’s bid will be rejected.

SP-1

04_KA18-02_Spec Provs_4-10-19

SPECIAL PROVISIONS

Amend INTERIM GENERAL CONDITIONS, dated October 1994, as follows:

Section 2 – Proposal Requirements and Conditions

1. AMEND Section 2.1 Qualification of Bidder with the following:

Written Notice of Intent to Bid or Offer: A written Notice of Intent to Bid is not required for the Solicitation.

Standard Qualification Questionnaire: Bidders may be required to complete a standard qualifications questionnaire. When requested, the information shall be furnished within two working days or longer at the discretion of the Engineer. Failure to furnish the requested information within the time allowed may be grounds for a determination of non-responsibility, in accordance with HRS Section 103D-310 and HAR Section 3-122-108.

Hawaii Business or Compliant Non-Hawaii Business Requirement: Bidders shall be incorporated or organized under the laws of the State or be registered to do business in the State as a separate branch or division that is capable of fully performing under the contract, as stipulated in §3-122-112 HAR. A certified letter is not required prior to bid opening.

Compliance with §3-122-112 HAR: As a condition for award of the contract and as proof of compliance with the requirements of 103D-310(c) HRS, the apparent low bidder shall furnish the required documents to the Department. If the valid required certificates are not submitted on a timely basis for award of a contract, a bidder otherwise responsive and responsible may not receive the award. Bidder is responsible to apply for and submit the following documents to the Department.

A. Tax Clearance (HRS Chapter 237): Bidder shall obtain a tax clearance certificate from the

Hawaii State Department of Taxation (DOTAX) and the Internal Revenue Service (IRS).

The certificate is valid for six months from the most recently approved stamp date on the certificate; the certificate must be valid on the date received by the Department.

B. Department of Labor (DLIR) “Certificate of Compliance”. (HRS Chapter 383 -

Unemployment Insurance, Chapter 386 - Workers’ Compensation, Chapter 392 - Temporary Disability Insurance, and 393 – Prepaid Health Care): Bidder shall obtain a certificate of compliance from the Hawaii State Department of Labor and Industrial relations (DLIR). The certificate is valid for six months from the date of issue; certificates must be valid on the date received by the Department.

C. Department of Commerce and Consumer Affairs (DCCA), Business Registration Division

(BREG) “Certificate of Good Standing”. Bidder shall obtain a certificate of good standing issued by the Department of Commerce and Consumer Affairs (DCCA), Business Registration Division (BREG). The certificate of good standing is valid for six months from the date of issue; certificates must be valid on the date received by the Department.

COMPLIANCE, DOCUMENTATION AND HAWAII COMPLIANCE EXPRESS

Vendors are required to be compliant with all appropriate state and federal statutes. Proof of compliance (compliance documentation) is required. See the HIePRO Buyer FAQ on the State

SP-2

Procurement website for more information.

Proof of compliance/documentation is obtained through Hawaii Compliance Express (HCE).

Vendors shall register in Hawaii Compliance Express (HCE), a program separate from HIePRO.

The annual subscription fee to utilize the HCE service is currently $12.00. Allow 2 weeks to obtain complete compliance status after initial registration. It is highly recommended that vendors subscribe to HCE prior to responding to a solicitation.

The vendor is responsible for maintaining compliance. If the vendor does not maintain timely compliance in HCE, an offer otherwise deemed responsive and responsible may not be awarded.

2. ADD Section 2.4a, Pre-Bid Conferences

Required Pre-bid Conferences: For construction and design-build projects with an estimated value of $500,000 or more and solicited under the competitive sealed bid method (103D-302 HRS); and for construction and design-build projects with an estimated value of $100,000 or more and solicited under the competitive sealed proposal method (103D-303 HRS); a pre-bid conference is required.

Other Pre-Bid Conferences: The Department may require a pre-bid conference for construction or design-build projects that are below the dollar threshold listed in above or when projects have special or unusual requirements.

Other Conditions: The Department may require the prospective Bidders to make a physical inspection of the project site and make attendance at the pre-bid conference a condition for submitting an offer.

Nothing stated at the pre-bid conference shall change the solicitation unless a change is made by written addendum.

3. DELETE Section 2.5, Addenda and Interpretations, in its entirety and replace with the following:

“Discrepancies, omissions, or doubts as to the meaning of drawings and specifications should be communicated in writing to CHIEF ENGINEER, ENGINEERING DIVISION, P.O. BOX 373, HONOLULU, HAWAII, 96809 for interpretation and must be received by the Engineering Division no later than fourteen (14) calendar days prior to the date fixed for bid opening. Any interpretation, if made and any supplemental instructions will be in the form of written addenda to the plans and specifications and made available prior to the opening of bids. It shall be the prospective bidder’s sole responsibility to verify and obtain any said addenda from the office of the Engineering Division.

Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the contract documents.”

Section 3 – Award and Execution of Contract

AMEND Section 3.9, Notice to Proceed, by deleting “180 days” and replacing with “one (1) year” in the last paragraph.

Section 5 – Control of Work

AMEND Section 5.8 Value Engineering Incentive by deleting “$100,000” and replacing with

SP-3

“$250,000” in the first paragraph.

Section 6 – Substitution of Materials and Equipment

ADD the following to Section 6.3 Sub-paragraph b:

4. If the substitution meets all the requirements of the specifications and plans.

Section 7 – Prosecution and Progress

1. DELETE Section 7.2d in its entirety and replace with the following:

“d. Insurance Requirements

1. Obligation of Contractor

The Contractor shall not commence any work until it obtains, at its own expense, all required insurance. Such insurance must have the approval of the Department as to limit, form and amount and must be maintained with a company authorized by law to issue such insurance in the State of Hawaii.

All insurance described herein will be maintained by the Contractor for the full period of the contract and in no event will be terminated or otherwise allowed to lapse prior to written certification of final acceptance of the work by the Department.

Certificate(s) of Insurance acceptable to the Department shall be filed with the Engineer prior to commencement of the work. These certificates shall contain a provision that coverages afforded under the policies will not be canceled or changed until at least thirty days written notice has been given to the Engineer by registered mail. The insurance policies shall name the State of Hawaii, its officers and employees as an additional insured and such coverage shall be noted on the Certificate. Should any policy be canceled before final acceptance of the work by the Department, and the Contractor fails to immediately procure replacement insurance as specified, the Department, in addition to all other remedies it may have for such breach, reserves the right to procure such insurance and deduct the cost thereof from any money due to the Contractor.

Nothing contained in these insurance requirements is to be construed as limiting the extent of Contractor’s responsibility for payment of damages resulting from its operations under this contract, including the Contractor’s obligation to pay liquidated damages, nor shall it affect the Contractor’s separate and independent duty to defend, indemnify and hold the Department harmless pursuant to other provisions of this contract. In no instance will the Department’s exercise of an option to occupy and use completed portions of the work relieve the Contractor of its obligation to maintain the required insurance until the date of final acceptance of the work.

All insurance described herein shall cover the insured for all work to be performed under the contract, all work performed incidental thereto or directly or indirectly connected therewith, including traffic detour work or other work performed outside the work area, and all change order work.

The Contractor shall, from time to time, furnish the Engineer, when requested, SP-4 satisfactory proof of coverage of each type of insurance required or a copy of the actual policies covering the work. Failure to comply with the Engineer’s request may result in suspension of the work, and shall be sufficient grounds to withhold future payments due the Contractor and to terminate the contract for Contractor’s default.

2. Types of Insurance

The Contractor shall purchase and maintain insurance described below which shall provide coverage against claims arising out of the Contractor’s operations under the contract, whether such operations be by the Contractor itself or by the subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable.

(a) Worker’s Compensation. The Contractor and all subcontractors shall obtain full worker’s compensation insurance coverage for all persons whom they employ or may employ in carrying out the work under this contact. This insurance shall be in strict conformity with the requirements of the most current and applicable State of Hawaii Worker’s Compensation Insurance laws in effect on the date of the execution of this contract and as modified during the duration of the contract.

(b) Commercial General Liability Insurance and Automobile Insurance. Contractor’s commercial general liability insurance and automobile liability insurance shall both be obtained in a combined, single limit of not less than $1,000,000 per occurrence that shall include coverage for bodily injury, sickness, disease or death of any person, arising directly or indirectly out of, or in connection with, the performance of work under this contract.

The Contractor’s property damage liability insurance shall provide for a single combined limit of not less than $1,000,000 for all damages arising out of injury to or destruction of property of others including the Department’s, arising directly or indirectly out of or in connection with the performance of the work under this contract including explosion or collapse.

The Contractor shall either:

i. Require each of its subcontractors to procure and to maintain during the life of its subcontract, subcontractors’ comprehensive general liability, automobile liability and property damage liability insurance of the type and in the same amounts specified herein; or

ii. Insure the activities of its subcontractors in its own policy.

The Contractor will be permitted, in cooperation with insurers, to maintain a self insured retention for up to 25% of the per occurrence combined single limits of the commercial general liability and the automobile liability policies. The existence of the self insured retention must be noted on the certificate of insurance coverage submitted to the Department or else it will be understood that the insurer is providing first dollar coverage for all claims. For all claims within the self-insured retention amount, the rights, duties and obligations between the Contractor and the Department shall be identical to that between a liability insurer and the Department, as an additional insured, as if there was no self-insured retention.

SP-5

(c) Builder’s Risk Insurance. Unless included in the Specifications of this project, the

Contractor shall not be required to provide builder’s risk insurance. If required as noted in the Specifications, builder’s risk insurance shall be provided during the progress of work and until final acceptance by the Department upon completion of the contract. It shall be “All Risk” (including but not limited to earthquake, windstorm and flood damage) completed value insurance coverage on all completed work and work in progress to the full replacement value thereof. Such insurance shall include the Department as additional name insured. The Contractor shall submit to the Engineer for its approval all items deemed to be uninsurable. The policy may provide for a deductible in an amount of up to 25% of the amount insured by the policy. With respect to all losses up to any deductible amount, the relationship between the Contractor and the Department shall be that of insurer and additional insured as if no deductible existed”.

2. DELETE Section 7.16 in its entirety and replace with the following:

“RESPONSIBILITY FOR DAMAGE CLAIMS; INDEMNITY – The Contractor shall indemnify the State and the Department against all loss of or damage to the State’s or the Department’s existing property and facilities arising out of any act or omission committed in the performance of the work by the Contractor, any subcontractor or their employees and agents. Contractor shall defend, hold harmless and indemnify the Department and the State, their employees, officers and agents against all losses, claims, suits, liability and expense, including but not limited to attorneys’ fees, arising out of injury to or death of persons (including employees of the State and the Department, the Contractor or any subcontractor) or damage to property resulting from or in connection with performance of the work and not caused solely by the negligence of the State or the Department, their agents, officers and employees. The State or the Department may participate in the defense of any claim or suit without relieving the Contractor of any obligation hereunder. The purchase of liability insurance shall not relieve the Contractor of the obligations described herein.

The Contractor agrees that it will not attempt to hold the State and its Departments and Agencies and their officers, representatives, employees or agents, liable or responsible for any losses or damages to third parties from the action of the elements, the nature of the work to be done under these specifications or from any unforeseen obstructions, acts of God, vandalism, fires or encumbrances which may be encountered in the prosecution of the work.

The Contractor shall pay all just claims for materials, supplies, tools, labor and other just claims against the Contractor or any subcontractor in connection with this contract and the surety bond will not be released by final acceptance and payment by the Department unless all such claims are paid or released. The Department may, but is not obligated to, withhold or retain as much of the monies due or to become due the Contractor under this contract considered necessary by the Engineer to cover such just claims until satisfactory proof of payment or the establishment of a payment plan is presented.

The Contractor shall defend, indemnify and hold harmless the State and its Departments and Agencies and their officers, representatives, employees or agents from all suits, actions or claims of any character brought on account of any claims or amounts arising or recovered under the Worker’s Compensation Laws or any other law, by-law, ordinance, order or decree.

Section 8 – Measurement and Payment

SP-6

1. DELETE Section 8.7a in its entirety and replace with the following:

a. Tax Clearances from the State of Hawaii Department of Taxation and Internal Revenue

Service, subject to section 103D-328, HRS, current within two months of issuance date indicating that all delinquent taxes levied or accrued under State Statutes against the contractor have been paid.

2. ADD Section 8.7d, Certificate of Compliance:

d. A Certification from the Contractor affirming that the Contractor has, as applicable, remained in compliance with all laws as required by Section 103D-310, HRS, and Section 3-122-112, HAR. A contractor making a false affirmation shall be suspended and may be debarred pursuant to section 103D-702, HRS.

1. Certification of Compliance for Final Payment, State Procurement Office

Form-22. Must be Signed Original.

3. ADD Section 8.7e, Hawaii Compliance Express:

e. In lieu of submitting the tax clearances from Taxation and IRS, and SPO Form -22, the

Contractor shall use the Hawaii Compliance Express as described on page SP-1 of this Special Provisions.

S-1

TECHNICAL SPECIFICATIONS

TABLE OF CONTENTS

SPECIFICATION SECTION NO.

Division 1- General Requirements General Specifications 01019 Standard References 01090 Archaeological Protection 01101 Submittals 01300 Mobilization and Demobilization 01505 Barricades 01530

Division 2- Sitework Demolition and Removal 02050 Site Preparation 02100 Earthwork 02200 Trench Excavation and Backfill 02225 Aggregate Base Course 02230 Soil Treatment for Vegetation Control 02362 Asphaltic Concrete Pavement 02512 Prime Coat 02513 Tack Coat 02514 Copper Pipe and Fittings 02630 Water System 02713 Sanitary Sewer System 02730 Regulatory and Warning Signs 02846

Division 3- Concrete Reinforcing Steel 03210 Joint Sealers 03252 Concrete 03300 Epoxy Adhesive 03603

Division 4- Masonry Not Included

Division 5- Metals Not Included

Division 6- Woods and Plastics Rough Carpentry 06100 Wood Framing and Sheathing 06110 Finish Carpentry 06200 Preservative Treatment of Wood 06310

S-1

Division 7- Thermal and Moisture Protection Standing Seam Metal Roofing 07416 Flashing 07600 Sealants and Caulking 07900

Division 8- Doors and Windows Wood Doors 08210 Fiberglass Reinforced Plastic Doors 08220 Vinyl Windows 08520

Division 9- Finishes Gypsum Board 09250 Tile 09310 Acoustical Ceiling 09512 Resilient Flooring 09650 Painting 09900

Division 10- Equipment Toilet Accessories 10800

Division 11- Masonry Not Included

Division 12- Furnishing Not Included

Division 13- Special Construction Not Included

Division 14- Conveying Systems Not Included

Division 15- Mechanical Mechanical General Requirements 15000 Plumbing 15400

Division 16- Electrical Electrical General Requirements 16011 Electrical Work 16010

General Specifications 01019-1

SECTION 01019

GENERAL SPECIFICATIONS

PART 1 - GENERAL

1.1 GENERAL REQUIREMENTS

Work shall consist of furnishing all labor, tools, materials and equipment necessary and required to construct in place complete all work as indicated on the drawings and as specified herein.

1.2 GENERAL

A. Construction Lines, Levels and Grades: The Contractor shall verify all lines, levels and elevations indicated on the drawings before any clearing, excavation or construction begins. Any discrepancy shall be immediately brought to the attention of the Engineer, and any change shall be made in accordance with the Engineer's instruction. The Contractor shall not be entitled to extra payment for failing to report the discrepancies before proceeding with any work whether within the area affected or not.

B. Examination of Premises: The Contractor shall contact the Engineer and obtain permission before visiting the site.

C. Notices: The Contractor shall notify the Engineer and give at least three (3) working days notice before starting any work.

D. Disruption of Utility Services: All work related to the temporary disconnection of electrical system shall be pre-arranged with the Engineer so that any disruption of such services will be kept to a minimum. In the event temporary power hook-up is required, the Contractor shall provide the necessary services.

E. Contractor's Operations

1. The Contractor must employ, insofar as possible, such methods and means of carrying out the work so as not to cause any interruption or interference to the facility's operations. Where the Contractor's operations would result in interruptions which would hamper the operations of the facilities, the Contractor shall rearrange the schedule of work accordingly.

2. The Contractor shall maintain safe passageway to and from the facility's occupied rooms and other occupied spaces for the user agency personnel and the public at all times.

01019-2

F. Contractor Use of Premises

1. The Contractor shall review the applicable asbestos survey reports and insure that he fully understands their contents as to whether and where there may be asbestos containing materials (ACM) in the building(s) in which he will be working.

2. The Contractor shall inform its employees, subcontractors and all other persons engaged in the project of the presence (as applicable) of asbestos in the existing buildings at the job site in accordance with the requirements of Chapter 110, Article 12-110-2 (f) (1) (B) of the Occupational Safety and Health Standards, State of Hawaii.

3. In the event the Contractor, its subcontractor(s) and/or other persons engaged in the project must work in any building(s) on the site other than that one(s) designated in the project, the Contractor shall request copies of the asbestos survey report(s) for the building(s) from the Engineer and notify all persons as indicated in Item 2 above.

4. When the project includes paint to be disturbed that was applied prior to 1980, it shall be assumed to contain lead. The Contractor shall inform its employees, subcontractors, and all other persons engaged in the project that lead containing paints are present in the existing buildings at the job site and to follow the requirements of the Department of Labor and Industrial Relations, Division of Occupational Safety and Health, Title 12, Subtitle 8,Chapter 148, Lead Exposure in Construction, Hawaii Administrative Rules (Chapter 12-148, HAR).

5. If lead testing was done and the data is appended to this Section, the Contractor shall review the data to insure understanding of lead containing paint identification and location, that the testing was for design purposes only, and that the results do not satisfy any of the requirements of the Chapter 12-148, HAR.

a. Legend for Asbestos Survey Report

ACM Asbestos containing material

USA Unified…

This is the start of the file's text. The full file is on GovTribe.